Various Types Of Electrical Works In Distribution Lines (ht/lt) And Consumer Related Works At Amini
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UTL_2751_1Bid Award Id
ViewTender No
F.No.5/20/2015-Ele/Amn/203Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://tendersutl.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Various types of Electrical Works in Distribution Line at Amini
BOQ Items
... More
Single Phase Connection (Above 30 Mtrs distance)
10
-
-
... More
Three Phase Connection (Above 30 Mtrs distance)
10
-
-
... More
Providing New Service connections (UG Cables): Fixing and clipping the UG cable to the wall with proper cable clip, Fixing Suitable cutout fuse, Fixing Energy Meter, Providing line connections, etc (Excluding cable laying works)
-
-
-
... More
Single Phase Connection
30
-
-
... More
Three Phase Connection
10
-
-
... More
UG Cable Joining HT, 11 KV lines: Cutting cables, Removing insulations, semi conductors, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.
-
-
-
... More
HT Cable 95 Sq mm (Straight)
6
-
-
... More
HT Cable 95 Sq mm (End Termination)
3
-
-
... More
UG Cable Joining LT 440V lines: Cutting cables, Removing insulations, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.
-
-
-
... More
LT Cables 3 Phase (95, 120 & 160 Sq mm)
50
-
-
... More
LT Cables 3 Phase ( 70, 50 Sqmm)
60
-
-
... More
LT Cable 3 Phase( 10, 16,25 & 35 Sqmm)
80
-
-
... More
LT Single phase Cables
100
-
-
... More
LT End Termination works through break out
20
-
-
... More
Maintenances of Electrical Service connections-
-
-
-
... More
Refurbishment of service connections on the Post/Boxes/Consumer end, etc
250
-
-
... More
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post within 30 Mtrs length)
400
-
-
... More
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post above 30 Mtrs length)
300
-
-
... More
Replacing cut out fuse units with new one
500
-
-
... More
Replacing defective Energy Meter with new one
100
-
-
... More
Sealing Energy Meter with proper Polycarbon / suitable seal
200
-
-
... More
Replacing HRC fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)
100
-
-
... More
Replacing Forcelain fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)
200
-
-
... More
Installation/Replacement of Street light sets including transportation, connection, etc
200
-
-