Electricity Department Tender

View complete overview of Lakshadweep Electricity Department Tender

Electricity Department Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date16 Aug 2024
Closing Date13 Sep 2024
Tender Amount₹ 7,03,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Single Phase Connection (Above 30 Mtrs distance)

10

-

-

... More
Three Phase Connection (Above 30 Mtrs distance)

10

-

-

... More
Providing New Service connections (UG Cables): Fixing and clipping the UG cable to the wall with proper cable clip, Fixing Suitable cutout fuse, Fixing Energy Meter, Providing line connections, etc (Excluding cable laying works)

-

-

-

... More
Single Phase Connection

30

-

-

... More
Three Phase Connection

10

-

-

... More
UG Cable Joining HT, 11 KV lines: Cutting cables, Removing insulations, semi conductors, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.

-

-

-

... More
HT Cable 95 Sq mm (Straight)

6

-

-

... More
HT Cable 95 Sq mm (End Termination)

3

-

-

... More
UG Cable Joining LT 440V lines: Cutting cables, Removing insulations, Cable Joining with suitable Joint Kit as per the Procedure. Proper size of connectors should be used for a particular cable, proper tools and equipment are to be used, cuts and stripping should be very clean, proper technique is to be used for cable jointing and restoring the insulation, outer-sheath and Armour.

-

-

-

... More
LT Cables 3 Phase (95, 120 & 160 Sq mm)

50

-

-

... More
LT Cables 3 Phase ( 70, 50 Sqmm)

60

-

-

... More
LT Cable 3 Phase( 10, 16,25 & 35 Sqmm)

80

-

-

... More
LT Single phase Cables

100

-

-

... More
LT End Termination works through break out

20

-

-

... More
Maintenances of Electrical Service connections-

-

-

-

... More
Refurbishment of service connections on the Post/Boxes/Consumer end, etc

250

-

-

... More
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post within 30 Mtrs length)

400

-

-

... More
Hanging overhead service lines tied to the Posts at certain distance without hanging with stay wire, clipping to stay wire with proper cable tie, etc (Service line distance from the Post and consumer/ Post to post above 30 Mtrs length)

300

-

-

... More
Replacing cut out fuse units with new one

500

-

-

... More
Replacing defective Energy Meter with new one

100

-

-

... More
Sealing Energy Meter with proper Polycarbon / suitable seal

200

-

-

... More
Replacing HRC fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)

100

-

-

... More
Replacing Forcelain fuse unit (including base) necessary cutting,drilling,taiting with Bolt and nuts,socket and Cable tying (100 A to 400A)

200

-

-

... More
Installation/Replacement of Street light sets including transportation, connection, etc

200

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.