Directorate General Of Lighthouses And Lightships Tender

View complete overview of Lakshadweep DGLL Tender

Directorate General Of Lighthouses And Lightships - DGLL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date19 Oct 2022
Closing Date3 Nov 2022
Tender Amount₹ 2,82,676 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT - Urgent repair works to Canopy columns at Minicoy South Lighthouse, Lakhshadweep.
BOQ - Urgent repair works to Canopy columns at Minicoy South Lighthouse, Lakhshadweep.
Urgent repair works to Canopy columns at Minicoy South Lighthouse, Lakhshadweep.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, mixing and applying bonding coat of SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2kg cement per sqm of surface area mixed with specified proportion of approved polymer on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect including cost of all materials, labour, tools & plants, scaffolding etc completed as directed.

26

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts including cost of all materials, labour, tools & plants,scaffolding etc complete as directed.

22

-

-

... More
Providing and laying SBR Polymer modified (of approved make @ minimum 2% by wt. of cement used) plain/reinforced concrete jacket for the structural members e.g. columns, pillars, piers, beams etc with 1:1:2 concrete with ordinary portland cement (not less than 330kg per cum, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria, with 75mm thickness all-round existing core of RCC member. (Rates shall be for finished surface area of concrete and shall include the cost of making holes in existing RCC slab, if required, for pouring concrete in shuttering mould of jacket and appropriate approved Super-Plasticiser for rendering concrete as flowable self compacting and SBR polymer but shall exclude cost of reinforcement, bond coat, Shear Keys, centering and shuttering,strutting, propping etc including cost of all materials, labour, tools & plants, scaffolding etc completed as directed. (Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/tapping with a blunt metal instrument)

26

-

-

... More
12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) including cost of all materials, labour, tools & plants ,scaffolding etc complete as directed.

26

-

-

... More
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer, including cost of all materials, labour, tools & plants ,scaffolding etc complete as directed.

27

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats including cost of all materials, labour, tools & plants ,scaffolding etc complete as directed.

161

-

-

... More
Providing and fixing scaffolding system to support the canopy beam and slab, upto 5.00 metre height, above ground level, made with 40 mm dia G.I. telescopic adjustable props, placed 0.30 metre centre to centre,braced with M.S. Tubes, M.S. clamps etc.and maintaining it in a serviceable condition for supporting the structure and removing it thereafter as directed. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge including cost of all materials, labour, tools & plants ,scaffolding etc complete as directed.

43

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.