Andaman Lakshadweep Harbour Works Tender
View complete overview of Lakshadweep ALHW Tender
Andaman Lakshadweep Harbour Works - ALHW Tender
Pipes and Pipe Related Activities
Eprocure
Opening Date24 Aug 2020
Closing Date14 Sep 2020
Tender Amount₹ 5,67,023 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 11,350Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Maintenance Of Jetty At Eastern Side And Western Side Of Minicoy
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_ALHW_578606_1Bid Award Id
ViewTender No
DCE/KVT/DB/T-19/2020-21 Dated 20.08.2020Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Maintenance of jetty at Eastern side and Western side of Minicoy Island
Maintenance of jetty at Eastern side and Western side of Minicoy Island
BOQ Items
... More
Providing wearing coat wherever necessary with Cement concrete 1:2:4 excluding cost cement, jelly and M sand which will be supplied by the department on free of cost but including cost of all labour charges, minor tools nominal shuttering and centering charges, transportation charges of all materials to work site etc., complete
4
-
-
... More
Applying one coat wall primer on the concrete surface of jetty including cleaning the surface cost of all labour charges minor tools cost of materials etc., complete.
-
-
-
... More
Western side jetty
39
-
-
... More
Eastern side jetty
8
-
-
... More
Painting two coats with ready mixed acrylic plastic emulsion paint (extra) antifunges paint on the surface, hand rails & Hand rail post, lamp post etc., including the cost of labour charges, cost of painting brush, cost of paint and thinner and other materials etc. complete.
-
-
-
... More
Western side jetty
494
-
-
... More
Eastern side jetty
1102
-
-
... More
Finishing with Epoxy paint (two coats) at all locations prepared and applied as per manufactures specifications including appropriate priming coat, preparation of surface, etc. complete. ( Steel Work) 2 times in year.
-
-
-
... More
Western side jetty (gate, bollard etc.,)
47
-
-
... More
Eastern side jetty (gate, bollard etc.,)
88
-
-
... More
Fabrication of Entrance gate of jetty size 6M X2.10M with using GI pipe including cost of all materials like 2 1/2" GI class "C" pipe, 1 sqm inch TATA tube of 4 mm thick, suitable hinges, locking arrangements etc., cost of all labour charges, welding charges, transportation charges of all materials to work site, etc., complete.
271
-
-
... More
Providing and fixing Twin type bollards of 10T/20T capacity on the old jetty including demolishing the existing concrete at required location as per the direction of Engineer-in-charge including cost of transportation of bollards from LHW store to site, fixing the same in position and providing bolts and nuts in concrete. Welding charges for fixing bolts and nuts with main reinforcement rods leveling the same etc., but excluding cost of bollard, bolts and nuts washer which will be provided free of cost at LHW, store service of Crane, Forklift etc., will be provided with POL & operator if available on free of cost.
2
-
-
... More
Fixing of truck tyre fender for berthing side of the western side jetty as directed by the Engineer in charge including cost of all labour charges minor tools but excluding cost of materials etc., complete.
20
-
-
... More
Collection, transportation and fixing of giant tyre fender on berthing face of eastern side jetty as and when required as directed by the Engineer in charge including cost of all tools, all labour charges but excluding cost of all materials like giant tyre, chain "D" shackle, and forklift supplied by the department of free of cost etc., complete.
18
-
-
... More
Lifting giant tyre fender of various size from sea bed spread along premises of Eastern side jetty berthing face of draught about 9 M to 15 M / western side jetty of depth of 2 to 3 m and shifting to the stack yard with in a KM excluding hire charges of Fork Lift /JCB crane which will be provided by the department on free of cost subject to availability but including all diving equipments, tackles, safety measures, transportation charges, all labour charges etc., complete as per the direction of Engineer-In- Chagre.
-
-
-
... More
Western side jetty
15
-
-
... More
Eastern side jetty
20
-
-
... More
Re arranging the dislocated giant tyre fenders of the berthing face of eastern side jetty due to regular berthing of cargo and passenger ships by removing D shackles lifting and placing the giant tyre over the berthing jetty, re arranging the G.I. chains attending minor repairs for the chain by Cutting / adding pieces changing damaged D shackles with new placing the tyre back on the berthing face as directed by EIC locking to the U bolt with D shackles including cost of all labour charges minor tools but excluding cost of chain, D shackle wire ropes, hire charges of crane etc., complete which will be supplied by the department free of cost etc., complete.
120
-
-
... More
Locking 2/3 gaint tyre fender together with chain / wire rope firmly to one another through the eyelets and providing clamps to the wire ropes after lifting to the required level whenever required including cost of all labour charges minor tools, etc., but excluding cost of all materials which will be supplied by the department free of cost.
60
-
-