Andaman Lakshadweep Harbour Works Tender
View complete overview of Lakshadweep ALHW Tender
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Building Construction
Eprocure
Opening Date11 Oct 2024
Closing DateCancelled
Tender Amount₹ 15,52,182
Costs
EMD
₹ 31,043Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_830424_1Tender No
DCE/KVT/DB/T-60/2024-25/1761 Dated-11.11.2024Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing form work for RCC works including cost of all labour charges, tools, cost of all materials, transportation of materials to the work site within a lead of 3 kms etc. complete.
45
-
-
Fabrication and placing of m.s. rod grills for the RCC works including cutting, bending, tying and placing cost of binding wire etc. including cost of all labour charges, tools, cost of all steel, fabrication charges, transportation of materials etc. complete.
2
-
-
Removing damaged A.C. sheet / G.I. sheet roofing with L hooks and washer including cost of all labour charges, tools, transportation of materials to the work site within a lead of 3 Kms but excluding cost of all materials etc. complete.
198
-
-
Providing G.I. coated corrugated sheet 05 mm thick for roofing for Guest House open area & cycle shed at circle office by fixing with hooks, bolts & nuts. Self drilling, tapping screws etc, including cost of all labour charges minor tools, scaffolding, cost of materials etc, but excluding cost of purline, rafters, trusses fabrication which will be paid seperatly.
125
-
-
Steel fabrication for roof truss Gindal or equivalent type coated tubes / sections in various sizes, including cutting, hoisting. Fixing in position applying one primer coat followed by two coats of paints and welded with bolts and nuts etc, including cost of all labour charges minor tools, transportation, fixing charges cost of all labour charges all materials etc, complete.
608
-
-
Providing C.C.1:2:4 for base footings for fixing G.I. pipe in position including cost of cement and sand, all labour charges minor tools, transportation charges, shuttering charges etc, but excluding cost of granite chips which will be provided by the department.
0.5
-
-
Cleaning filled septic tank by removing the discharge and disposing the same as directed by the EIC including cost of all labour charges, tools etc. complete.
10
-
-
Cleaning filled soak pit by removing the discharge and disposing the same as directed by the EIC including cost of all labour charges, tools etc. complete.
20
-
-
Cleaning well of departmental quarters and office including bailing out water, removing the mud etc. as directed by the EIC including cost of all labour charges, tools etc. complete.
12
-
-
Cleaning over head water tank of departmental quarters and office including removing the water, cleaning the inside etc. as directed by the EIC including cost of all labour charges, tools etc. complete.
-
-
-
10000 Lit Capacity (1 No every six months)
2
-
-
500/300 Lit Capacity (20 Nos every six months)
30
-
-
Dismantling and removing of damaged EWC pan along with the complaint flushing cyctern without causing any damages to the connections to the septic Tank and disposing the dismantling materials with in a lead of 50 m including cost of all labour charges minor tools etc.complete.
5
-
-
Providing and fixing wash down water closet (European type WC) with integral 'P' or 'S' trap including jointing the trap with pipe in cement mortar 1:1 (one cement and one fine sand) and making good the same and connecting the EWC with the septic tank connect pipe, including cost of EWC and all connected materials , cost of all labour charges, minor tools and plants etc. complete.
10
-
-
Providing and fixing 12.5 ltrs low level flushing cistern with a pair of C.I or M.S. brackets complete with fittings such as lead valve 15mm nominal size ball valve with polythene float, unions and couplings for connection with inlet, outlet and over flow pipes, 40 mm dia porcelain enameled fush bend including cuttings holes in walls where ever necessary and making good the same and connecting the flush bend with cistern and closet , including cost of flushing cycstern and all connected materials , cost of all labour charges , minor tools and plants etc .complete.
15
-
-
Providing and fixing of PVC Door Shutter with PVC Chowket to the existing opening using Hold fast/anchor bolt/ screws etcincluding cost of all matirials cost of PVC Doors shutter and chowket, all labour charges, minor tools and plants etc.complete.
10
-
-
Cleaning rain water harvesting tanks of departmental quarters including removing the water, filter media, cleaning and refiling th filter media with fresh materials like coconut husk fibre, 20mm gravel, charcol made out of coconut shell etc. as directed by the EIC including cost of all labour charges, tools, all materials except gravel which will be supplied by the department etc. complete.
10
-
-
Dismantling of damaged brick work, RCC, PCC etc. and disposing of the unserviceable materials within a lead of 300 mtrs including cost of all labour charges, tools etc. complete.
4
-
-
Plastering with C.M. 1:3, 6mm thick with one cement, three M sand for exposed masonry & R.C.C. works including cost of all materials, labour charges, transportation charges, minor tools etc. complete.
100
-
-
Brick masonry in C.M.1:6 for foundation & basement works including cost of cement, sand, all labour charges, transportation charges, minor tools etc. but excluding cost of brick which will be supplied by the departmenta free of cost at department store etc.complete.
5
-
-
Applying 2 coat of emulsion paint over the primer coat both interior & exterior of the building as directed by EIC including cost of all materials , scaffoldings, Transportation charges, labour charges, and minor tools etc complete.
1500
-
-
Providing wood work (Superior Hard wood Category II) in frames of doors, windows, clerestrory windows and other frames wrought framed and fixed in position including cost of all materials, all labour charges, transportation charges etc..complete.
0.25
-
-
Providing window shutter for replacing damaged window shutter by providing required timber, glass panel, hinges, handle, tower bolt and all fittings etc. Including cost of all materials and labour charges etc.complete.
10
-
-
Repairing damaged window shutter by providing required glass panel, hinges, handle, tower bolt etc. Including cost of all materials and labour charges etc.complete.
30
-
-
Repairing damaged window shutter by providing required hinges, handle, tower bolt etc. Including cost of all materials and labour charges etc.complete.
40
-
-
Repairing damaged door shutter by replacing required hinges, handle, tower bolt etc. Including cost of all materials and labour charges etc.complete.
10
-
-
Plastering with CM 1:5, 12mm thick floated hard and trowelled smooth, both side of walls as per the direction of Engineer-in-charge including cost of all materials, scaffolding, all labour charges, curing, conveying all materials to work site etc. complete.
100
-
-
Providing and fixing wash basin medium type with all fittings single hose for pillow cap with C for MS brackets etc including cost of all materials and labour charges etc. complete.
10
-
-
Supply installation testing and commissioning of pre wired LED 20 W tube light fittings directly on the wall including connection with 1.5 sqm PVC insulated copper cable ETC complete including cost of all labour charges minor tools cost of all materials etc complete
30
-
-
Supply installation testing and commissioning of BLDC ceiling fan fittings directly on the ceiling including connection with 1.5 sqm PVC insulated copper cable ETC complete including cost of all labour charges minor tools cost of all materials etc complete
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements