Andaman Lakshadweep Harbour Works Tender
View complete overview of Lakshadweep ALHW Tender
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date29 Jul 2024
Closing Date11 Sep 2024
Tender Amount₹ 65,47,367
Costs
EMD
₹ 1,30,950Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Emergency Repair Works To Katchery Jetty And Fisheries Jetty At Agattii
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_818758_1Bid Award Id
ViewTender No
DCE/KVT/DB/T-35/2024-25/1230 Date-26.7.2024Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying, preparing and priming the reinforcement steel with Epoxy zinc primer or equivalent product epoxy anti corrosive paint Confirming to having IS/BS certification), including cost all materials all labour charges, minor tools, etc complete.
21.02
-
-
Providing form works for R.C.C works such as slab, beam, column, stair etc., including centering & shuttering so as to give a rough finish strutting, propping, etc., cost of all labour charges, all material, minor tools etc. complete.
271
-
-
Supply and apply of high strength, non shrink cementitious free flow micro concrete (with minimum 28 days flexural strength 50kg/Sqcm and Compressive strength 500 kg / Sqm As per BS 4551-80) for above water level using 12mm down graded stone chips with the ratio of 1:0.75 (1 high strength and non shrink cementitious micro concrete chemical :0.75 12mm to 6mm stone chips) on site to enable completion of pouring in a continuous operation. An approved grout concrete mixer of slow speed heavy duty drill and exact quantity of water with cleaned stone chips of size 12mm to 6mm slowly and mix the same thoroughly in a forced action. The mixed materials should be placed immediately positioned form work continuously to an average thickness of 50mm without any gap. Including cost of all materials, all labour charges, Minor tools, etc. complete.
241
-
-
Supply and application of Epoxy Concrete Bonding agent (Confirming to and having BS 6319 certification)and over cleaned and properly prepared old concrete surface to give good bonding between old and new concrete, Including cost of all materials, labour charges, minor tools, etc., Complete.
241
-
-
Supplying, mixing and applying Nito bond CURING MEMBRANE or equivalent with water Including cost of materials, labour charges, minor tools, etc., Complete.
241
-
-
Protective Coat : Supplying and applying two coats of IPH - Conguard or DECKGUARD 'S' by spray or brush over the prepared surface and allow it to dry including cost of materials, labour, brushes, tools, equipment etc. complete. The polymer material properties are to be as follows: 1. Water absorption test in (%) : 0.15 %
241
-
-
Core drilling of minimum required diameter size for the existing structure on the concrete surface to facilitate procuring of micro concrete by tremie method for piles beams, deck slab including cost of all equipment, labours and other minor tools etc., complete.
176
-
-
Providing and fixing the sacrificial anode (Fosroc Galva shield XP or equivalent) over the main reinforcement of pile, pile caps, columns, Deck Beams and Deck Slabs etc. as per the manufacturer specification and designed spacings, as sacrificial anode to the reinforcement against corrosion, Including cost of all materials, machineries and labour charges, minor tools, etc., Complete.
242
-
-
SCHEDULE - II - Fisheries Jetty
SCAFFOLDING : Providing two legged scaffolding using blue gum post or best quality bamboo post of 3M over length, the distance between two rows being 2M in both rows with to horizontal post including using longitudinal and transverses, middle braces to stop up and providing a platform using coil and nile with hand rails for safety measures including cost of all materials , all labour charges, minor tools etc complete.
156
-
-
Surface preparation to receive micro concrete by chipping to depth of max. 75mm, cleaning, removing the traces of dust, loose concrete etc., including cost of all labour charges, minor tools, etc, complete.
186
-
-
Providing and fixing Tor steel reinforcement for R.C.C. work including cutting, bending, binding, and placing in position and lapping to be provided minimum of 20 cm in length by welding at both ends, including cost of steel cost of binding wire, minor tools etc. complete.
3.79
-
-
Supplying, preparing and priming the reinforcement steel with Epoxy zinc primer or equivalent product epoxy anti corrosive paint Confirming to having IS/BS certification), including cost all materials all labour charges, minor tools, etc complete.
12.05
-
-
Providing form works for R.C.C works such as slab, beam, column, stair etc., including centering & shuttering so as to give a rough finish strutting, propping, etc., cost of all labour charges, all material, minor tools etc. complete.
151
-
-
Supply and apply of high strength, non shrink cementitious free flow micro concrete (with minimum 28 days flexural strength 50kg/Sqcm and Compressive strength 500 kg / Sqm As per BS 4551-80) for above water level using 12mm down graded stone chips with the ratio of 1:0.75 (1 high strength and non shrink cementitious micro concrete chemical :0.75 12mm to 6mm stone chips) on site to enable completion of pouring in a continuous operation. An approved grout concrete mixer of slow speed heavy duty drill and exact quantity of water with cleaned stone chips of size 12mm to 6mm slowly and mix the same thoroughly in a forced action. The mixed materials should be placed immediately positioned form work continuously to an average thickness of 50mm without any gap. Including cost of all materials, all labour charges, Minor tools, etc. complete.
153
-
-
Supply and application of Epoxy Concrete Bonding agent (Confirming to and having BS 6319 certification)and over cleaned and properly prepared old concrete surface to give good bonding between old and new concrete, Including cost of all materials, labour charges, minor tools, etc., Complete.
153
-
-
Supplying, mixing and applying Nito bond CURING MEMBRANE or equivalent with water Including cost of materials, labour charges, minor tools, etc., Complete.
153
-
-
Protective Coat : Supplying and applying two coats of IPH - Conguard or DECKGUARD 'S' by spray or brush over the prepared surface and allow it to dry including cost of materials, labour, brushes, tools, equipments etc. complete. The polymer material properties are to be as follows: 1. Water absorption test in (%) : 0.15 %
153
-
-
Core drilling of minimum required diameter size for the existing structure on the concrete surface to facilitate pouring of micro concrete by tremie method for piles beams, deck slab including cost of all equipment, labours and other minor tools etc., complete.
200
-
-
Providing and fixing the sacrificial anode (Fosroc Galva shield XP or equivalent) over the main reinforcement of pile, pile caps, columns, Deck Beams and Deck Slabs etc. as per the manufacturer specification and designed spacings, as sacrificial anode to the reinforcement against corrosion, Including cost of all materials, machineries and labour charges, minor tools, etc., Complete.
520
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements