Andaman Lakshadweep Harbour Works Tender
View complete overview of Lakshadweep ALHW Tender
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date28 Dec 2023
Closing DateCancelled
Tender Amount₹ 20,48,449
Costs
EMD
₹ 41,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Annual Maintenance Of Katchery Jetty,fisheries Jetty And Eastern Side Jetty At Kavaratti For The Year 2023-2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_ALHW_787703_1Tender No
NO.DEC/KVT/DB/T-24/23-24/2897 Dated 26.12.2023Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Eastern side jetty
2
-
-
... More
Providing and laying RCC 1:1.5:3 for RCC handrails, handrail post, Lamp post, beam, short column, deck slab etc including cost of all mateirals, all labour charges etc., complete.
-
-
-
... More
Katchery jetty
11
-
-
... More
Fisheries jetty
3.5
-
-
... More
Eastern side jetty
2
-
-
... More
Providing and laying wearing coat with 1:2:4 using 20 cm size graded stone jelly including cost of all materials, all labour charges, tools, providing centering and shuttering whenever necessary etc.complete.
-
-
-
... More
Katchery jetty
9
-
-
... More
Fisheries jetty
9
-
-
... More
Providing form work including centering and shuttering so as to give a rough finish structuring and proping and centering and shutering etc., including cost of materials and all labour charges etc., complete.
-
-
-
... More
Katchery jetty
150
-
-
... More
Fisheries jetty
34
-
-
... More
Eastern side jetty
39
-
-
... More
Providing and fixing mild or twisted steel reinforcement for R.C.C works, including cutting, bending, binding and placing in position, cost of steel, cost of binding wire, minor tools, all labour charges, transportation of materials etc.complete.
-
-
-
... More
Katchery jetty
17
-
-
... More
Fisheries jetty
6
-
-
... More
Eastern side jetty
3
-
-
... More
Applying one coat wall primer on the concrete sunface of jetty including cleaning the surface cost of all labour charges minor tools cost of materials etc., complete.
-
-
-
... More
Katchery jetty
98
-
-
... More
Eastern side jetty
40
-
-
... More
Painting two coats with ready mixed acrylic plastic emulsion paint (extra) antifunges out side/inside including one coat primer after rubbing with sand paper and cleaning the surface all labour charges, materials etc., complete.
-
-
-
... More
Katchery jetty
725
-
-
... More
Painting two coats approved quatity ready mixed synthetic enamel paint for hand rail and handrails, post beam side etc., including cost of all labour charges materials etc., complete.
-
-
-
... More
Eastern side jetty
1276
-
-
... More
Fixing of truck tyre fender, cylindrical fender for berthing side of the western side jetty as directed by the Engineer in charge including cost of all labour charges, minor tools, transportation materials of site but excluding cost of materials etc., complete, which will be provided at department store/stackyard.
-
-
-
... More
Katchery jetty
72
-
-
... More
Fisheries jetty
36
-
-
... More
Retrieving the old tyre fender (fall down from the jetty in lagoon along side of the jetty by diving and transporting to jetty head keeping in safe custody without affecting traffic etc. Including cost of all labour charges minor tools etc. complete.
-
-
-
... More
Katchery jetty
36
-
-
... More
Fisheries jetty
24
-
-
... More
Providing and fixing of giant tyre fender on berthing face of Eastern side jetty as directed by the Engineer in charge excluding cost of giant tyre fender, G.I. Chain D' shackles hire charges of Fork lift etc, which will be issued by department on free of cost at department store, Kavaratti but including cost of all labour charges, transportation charges of all materials to jetty, minor tools etc, complete.
-
-
-
... More
Eastern side jetty
48
-
-
... More
Re-arranging the dislocated giant tyre fenders of the berthing face of eastern side jetty due to regular berthing of cargo and passenger ships by removing D shackles lifting and placing the giant tyre over the berthing jetty, re arranging the G.I. chains attending minor repairs for the chain by Cutting / adding pieces changing damaged D shackles with new placing the tyre back on the berhing face as directed by EIC locking to the U bolt with D shackles including cost of all labour charges minor tools but excluding cost of chain, D shackle wire ropes, hire charges of crane etc., complete which will be supplied by the department free of cost etc., complete.
-
-
-
... More
Eastern side jetty
72
-
-
... More
Lifting giant tyre fender of various size from sea bed spreaded along permises of Eastern side jetty berthing face of draught about 9 M to 15 M and shifting to the stack yard with in a KM excluding hire charges of Fork Lift /JCB crane which will be provided by the department on free of cost subject to availability but including all diving equipments, tackels, safety measures, transportation charges, all labour charges etc., complete as per the direction of Engineer-In- Charge.
-
-
-
... More
Eastern side jetty
36
-
-
... More
Lifting Pneumatic fender at berthing face to jetty and arresting to jetty bollards, replaced the broken D shackle from fender covered chain and attended required repair for GI Chain and outer side provided tyres and refixing pneumatic fender at its original position at berthing face etc., including cost of all labour charges minor tools etc., complete
-
-
-
... More
Eastern side jetty
6
-
-
... More
Checking misplaced frame bottom and pile bracket by engaging driver providing new wire rope required shackles for fender and arresting fender frames with wire rope to jetty bollards by using chain pully block etc., complete including cost of all labour charges, cost divers charges of minor tools etc., complete excluding cost of wire rope “D” Shackles which will be supplied by the department free of cost etc., complete.
-
-
-
... More
Eastern side jetty
6
-
-
... More
Providing and fixing of 30T capacity Twin type bollards at required location as per the direction of Engineer-in-charge including cost of transportation of bollards from ALHW store to site, fixing the same in position and providing bolts and nuts in concrete. Welding charges for fixing bolts and nuts with main reinforcement rods leveling the same etc., but excluding cost of bollard, bolts and nuts washer which will be provided free of cost at ALHW, store service of Crane, Forklift etc., will be provided with POL & operator if available on free of cost.
-
-
-
... More
Eastern side jetty
3
-
-
... More
Providing and fixing Twin type C.I. bollards of 20T or 10 T capacity on the old jetty including demolishing the existing concrete, to the required length and width so as to expose the existing bottom layer of reinforcement bars of slab and top layer of beam rods, drilling bolt holes as per requirement, providing additional reinforcement rods to slab, fixing the bollard with bolts & nuts, washers in position welding all the rods, bolts & washers and anchoring, providing shuttering, providing RCC concrete of 1:0.9:1.8 as per specification, curing including cost of shuttering materials, welding materials, all labour charges, transportation charges, hire charges of welding machine but excluding cost of other materials etc.complete.
-
-
-
... More
Katchery jetty
5
-
-
... More
Fisheries jetty
5
-
-
... More
Providing and fixing of G.I."U" bolts/mooring ring to the side of deck slab/landings for providing fenders after demolishing concrete, exposing reinforcement. So as to fix the G.I. 'U' bolts with in the old concrete by welding new rods and G.I. bolts to old rods cleaning converting to the required level including all labour charges for shuttering, welding, concreting, cost of welding materials shuttering but excluding cost of G.I. bolts, cement, jelly & sand etc. complete.
-
-
-
... More
Katchery jetty
8
-
-
... More
Fisheries jetty
8
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements