Andaman Lakshadweep Harbour Works Tender
View complete overview of Lakshadweep ALHW Tender
Andaman Lakshadweep Harbour Works - ALHW Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Jul 2024
Closing Date29 Aug 2024
Tender Amount₹ 1,79,47,254
Costs
EMD
₹ 3,58,945Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ALHW_818213_1Bid Award Id
ViewTender No
DCE/KVT/DB/T-34/2024-25/1203 Date-25.7.2024Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Centering and shuttering for Hand railposts, handrails and lightpost etc including cost of all materials , form work, transportation charge of materials to the site, hire charge of woodcutting tools, vibrator and minor tools as per the direction of EIC etc complete.
205.77
-
-
... More
Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Kadmath, cost of binding wires, all T&P required for the work and minor tools etc. complete.
241
-
-
... More
Providing and laying PCC with 1:2:4 mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete.
45.3
-
-
... More
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete.
290.09
-
-
... More
Fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, including transportation charges, minor tools, labour charges etc complete.
-
-
-
... More
10 T
6
-
-
... More
20 T
6
-
-
... More
SCHEDULE - II - Dismantling & Reconstructing of western side jetty B/HEAD at Kadmath:- Phase I
Dismantling of existing damaged concretes of slab, longitudinal beams,cross beams, hand rails, electric posts, low landings, screen walls, midtide beams etc and transporting the materials to the department stack yard as instructed by EIC leaving no brocken concrete pieces on the sea bed including hire charge of tractors, cost hire charge of required heavy mechinaries like concrete cutter, demolition hammer, breaker etc, cost of labours etc complete.
132.2
-
-
... More
Providing & laying RCC 1:0.9:1.80 using 20mm graded stone agregate for RCC pile cap mid tide bracings, short columns, diagonal bracings, stiffening walls, deck beams, and slab RCC slab or bollard blocks, low level landing platform etc., excluding fabrication charges which will be paid separately , including cost of cement, granite stone, river sand, all labour charges for screening and washing of both the aggregates, providing all shuttering, including cost of shuttering materials, centering, proping wherever required mixing concrete, conveying and placing consolidation with vibrator curing, and transportation charges of all other materials to work site, hire charges and running expenses of concrete mixer machine and vibrator, etc., complete.
105
-
-
... More
Fabrication and fixing of reinforcement cages as per drawing for cast-in-situ piles as per the direction of Nodal Officer, including cost of material, fabrication, fixing dowels, shear ties, cutting, bending, tying, lapping and welding in position wherever necessary with black 18 SWG annealed binding wire, all labour charges, transportation charges of all materials to Work Site at Chetlath, cost of binding wires, all T&P required for the work and minor tools etc. complete.
194
-
-
... More
Providing and laying PCC with 1:2:4 mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc complete.
28.86
-
-
... More
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials and labour charges etc complete.
39.13
-
-
... More
Fixing 10T and 20T bollards on the both side of the jetty for arresting the vessels, boat with ropes for embarkation/disembarkation of passenger and cargoes excluding the cost of bollard with its fittings, including transportation charges, minor tools, labour charges etc complete.
-
-
-
... More
20 T Bollard
6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements