Andaman Lakshadweep Harbour Works Tender

View complete overview of Lakshadweep ALHW Tender

Andaman Lakshadweep Harbour Works - ALHW Tender

Works
Machinery and Tools
Eprocure
Opening Date4 Oct 2024
Closing Date17 Oct 2024
Tender Amount₹ 15,48,363 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Eastern side jetty

10

-

-

... More
Providing and laying RCC 1:1.5:3 for RCC handrails, handrail post, Lamp post, beam, short column, deck slab etc including cost of all mateirals, all labour charges etc., complete.

-

-

-

... More
Katchery jetty

6

-

-

... More
Fisheries jetty

6

-

-

... More
Eastern side jetty

7

-

-

... More
Providing form work including centering and shuttering so as to give a rough finish structuring and proping and centering and shutering etc., including cost of materials and all labour charges etc., complete.

-

-

-

... More
Katchery jetty

30

-

-

... More
Fisheries jetty

77

-

-

... More
Eastern side jetty

152

-

-

... More
Providing and fixing mild or twisted steel reinforcement for R.C.C works, including cutting, bending, binding and placing in position, cost of steel, cost of binding wire, minor tools, all labour charges, transportation of materials etc.complete.

-

-

-

... More
Katchery jetty

6

-

-

... More
Fisheries jetty

6

-

-

... More
Eastern side jetty

7

-

-

... More
Applying one coat wall primer on the concrete sunface of jetty including cleaning the surface cost of all labour charges, minor tools, cost of materials etc., complete.

-

-

-

... More
Katchery jetty

200

-

-

... More
Fisheries jetty

140

-

-

... More
Eastern side jetty

282

-

-

... More
Painting two coats with ready mixed acrylic plastic emulsion paint (extra) antifunges out side/inside including one coat primer after rubbing with sand paper and cleaning the surface all labour charges, materials etc., complete.

-

-

-

... More
Katchery jetty

200

-

-

... More
Fisheries jetty

140

-

-

... More
Painting two coats approved quatity ready mixed synthetic enamel paint for hand rail and handrails, post beam side etc., including cost of all labour charges, materials etc., complete.

-

-

-

... More
Eastern side jetty

480

-

-

... More
Fixing of truck tyre fender, cylindrical fender for berthing side of the western side jetty as directed by the Engineer in charge including cost of all labour charges, minor tools, transportation materials of site but excluding cost of materials etc., complete, which will be provided at department store/stackyard.

-

-

-

... More
Katchery jetty

25

-

-

... More
Fisheries jetty

25

-

-

... More
Retrieving the old tyre fender (fall down from the jetty in lagoon along side of the jetty by diving and transporting to jetty head keeping in safe custody without affecting traffic etc. Including cost of all labour charges minor tools etc. complete.

-

-

-

... More
Katchery jetty

20

-

-

... More
Fisheries jetty

12

-

-

... More
Providing and fixing of giant tyre fender on berthing face of Eastern side jetty as directed by the Engineer in charge excluding cost of giant tyre fender, G.I. Chain D' shackles which will be issued by department on free of cost at department store, Agatti but including cost of all labour charges, transportation charges of all materials to jetty, hire charges of Fork lift etc, minor tools etc, complete.

-

-

-

... More
Eastern side jetty

20

-

-

... More
Lifting giant tyre fender of various size from sea bed spreaded along permises of Eastern side jetty berthing face of draught about 9 M to 15 M and shifting to the stack yard with in a KM including hire charges of Fork Lift /JCB crane, all diving equipments, tackels, safety measures, transportation charges, all labour charges etc., complete as per the direction of Engineer-In- Charge.

-

-

-

... More
Eastern side jetty

20

-

-

... More
Re-arranging the dislocated giant tyre fenders of the berthing face of eastern side jetty due to regular berthing of cargo and passenger ships by removing D shackles lifting and placing the giant tyre over the berthing jetty, re arranging the G.I. chains attending minor repairs for the chain by Cutting / adding pieces changing damaged D shackles with new placing the tyre back on the berhing face as directed by EIC locking to the U bolt with D shackles including cost of all labour charges, minor tools, hire charges of crane but excluding cost of chain, D shackle wire ropes, etc., complete which will be supplied by the department free of cost etc., complete.

-

-

-

... More
Eastern side jetty

50

-

-

... More
Locking 2/3 gaint tyre fender together with chain / wire rope firmly to one another through the eyeletes and providing clamps to the wire ropes after lifting to the required level whenever required including cost of all labour charges, hire charges of crane and minor tools, etc., but excluding cost of all materials which will be supplied by the department free of cost.

-

-

-

... More
Eastern side jetty

20

-

-

... More
Engaging of 12 T hydra crane for providing gang way / unloading of cargo from ships / barges at eastern side jetty as when required when the departmental crane is under requireds including cost of HSD / operator all minor tools, all laboure charges etc. complete.

-

-

-

... More
Eastern side jetty

20

-

-

... More
Attending repair and maintenance of damaged Barricades, jetty gate, hand rails and handrail post made with steel fabrication etc. including cost of all other materials like YST 310 Grade rectangular Hollow Tata Tube of size 80x40x4mm or C class GI pipes including cost of all materials, cost of all labour charges, welding charges, transsportation charges of all materials to work site, etc. complete.

-

-

-

... More
Eastern side jetty

530

-

-

... More
Providing and fixing of 30T capacity Twin type bollards at required location at Eastern side jetty as per the direction of Engineer-in-charge including cost of transportation of bollards from ALHW store to site, service of Crane, Forklift etc., fixing the same in position and providing bolts and nuts in concrete. Welding charges for fixing bolts and nuts with main reinforcement rods leveling the same etc., but excluding cost of bollard, bolts and nuts washer which will be provided free of cost at ALHW, store.

2

-

-

... More
Providing and fixing of 20T capacity Twin type bollards at required location at Eastern/western side jetty as per the direction of Engineer-in--charge including cost of transportation of bollards from ALHW store to site , fixing the same in position and providing bolts and nuts in concrete. Welding charges for fixing bolts and nuts with main reinforcement rods leveiling the same etc., but excluding cost of bollard , bolts and nuts washer which will be provided free of cost at ALHW, store service of crane , forklift etc., will be provided with POL &operation if available on free of cost.

4

-

-

... More
Providing and fixing of G.I."U" bolts/mooring ring to the side of deck slab/landings for providing fenders after demolishing concrete, exposing reinforcement. So as to fix the G.I. 'U' bolts with in the old concrete by welding new rods and G.I. bolts to old rods cleaning converting to the required level including all labour charges for shuttering, welding, concreting, cost of welding materials shuttering but excluding cost of G.I. bolts, cement, jelly & sand etc. complete.

24

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.