Opening Date21 Apr 2025
Closing Date8 May 2025
Tender Amount₹ 29,63,823
Costs
EMD
₹ 59,276Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_ALHW_857229_1Tender No
NO.DCE/KVT/DB/T-4/2025-26/1086 Dated-21.4.2025Tender Authority
Andaman Lakshadweep Harbour Works ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying PCC (M20) with 1:2:4 mix (1cement 2 Msand,4 20mmchips) for wearing coat as instructed by EIC including cost of all materials (Cement, M Sand, 20mm Chips), cost of all labour charges, transportation charge of materials to the site, hire charge of mixer machine, vibrator and minor tools etc. complete
6
-
-
... More
Providing and laying RCC with RCC 1:11/2:3 mix (1 cement 1 1/2 M sand 3 20mm chips) for Hand rail posts, handrails, and light post etc., as instructed by EIC including cost of all materials (Cement, M sand, 20 mm chips) cost of all labour charge, transportation charge of materials to the site, hire charges of mixer machine, vibrator and minor tools all labour charge etc., complete.
13
-
-
... More
Applying one coat white cement primer over hand rails and jetty sides as directed by the EIC including cost of all materials, labour charges, minor tools, transportation charges etc, complete.
315
-
-
... More
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials, minor tools and labour charges etc complete.
836
-
-
... More
Painting with enamel paint of aproved brand like Berger, Shalimar, Asian,Dulux etc with two coats on metalic usrface such as bollards gate, etc, including cost of paint, all labour charges, minor tools etc complete.
21
-
-
... More
Fabrication and fixing of MS rod for hand rail, hand rail post and lowlanding, including cost of MS rods, all labour charges, minor tools etc., completed.
13
-
-
... More
Providing form work including centering, shuttering so as to give a rough finish strutting and proping etc., height of proping & centering for hand rails and hand rials posts and removal of the same for in situ reinforced cement concrete & plain concrete work inlcuding cost of all labour charges minor tools and cost of centering materials etc., complete.
170
-
-
... More
Removing and stacking of damaged steel gate from jetty to departmntal yard including cost of all labour charges, cutting charges, transportation charges, etc., complete.
1
-
-
... More
Fabrication and fixing of Entrance gate of jetty as per e drawing including cost of all materials like 21/2 " GI Class "C" pipe, 1 Sq inch TATA tube of 4mm thick , suitable hinges, locking arrangements etc, cost of all labour charges, welding charges, transportaiton charges of all materials to work site, etc complete.
656
-
-
... More
Fixing of Gate as per the direction of EIC excluding cost of gate, cement and sand which will be issued by the department on free of cost at departmental store at Minicoy but including all other minor materialks, all labour charges, transportation charges of all materials to work site, etc complete
1
-
-
... More
Fixing of truck tyre fender , cylindrical fender for berthing side of the jetty as drected by the engineer in charge including cost of all labour charges minor tools, transportation of materials to site but excluding cost of materials etc., complete . Which will be providede at department store/stack yard.
10
-
-
... More
Retriving the old tyre fender (fall down the jetty in lagoon along side of the jetty by diving and and transporting to jetty head keeping in safe custody without affecting traffic etc.
10
-
-
... More
II. Eastern side Jetty
Dismantling removing old RCC 1:11/2:3 Cable duct, Duct for water supply line, damaged hand rails, hand rail post etc. and disposing of the unserviceable materials within a lead of 300 mts including cost of all labour charges, tools etc, complete.
8
-
-
... More
Dismantling and removing the R.C.C. Lamp Post of light 5.50 meter from the approach of western side jetty and Eastern side jetty with at most care not to damage the IOCL pipelines provided at the side of approachof western jetty by providing necessary scaffoldings up to the required hight, transporting the debries with in a lead of 2 Kms, disposing the same without causing hindrance to the crafts and people utilizing the jetty as directed by the EIC, including cost of all labour charges, tools and plants, transportation charges etc; complete.
12
-
-
... More
Providing and fixing of M.S rod for hand rail post /Lamp post on the old jetty. Including demolishing the existing concrete 0.45cmx0.45cmx0.25cm so as to expose the existing bottom layer of reinforcement bars of slab etc. providing additional reinforcement bars,welding the rods, providing normal shuttering, providing R.C.C 1:0.9:1.80, curing including cost of shifting materials, welding charges, welding rods all labour charges, transportaion but excluding cost of cement, M sand and 20mm granite jelly which will be supplied by the departmental free of cost of departmental stores at Minicoy etc; complete.
12
-
-
... More
Providing and laying RCC with RCC 1:11/2:3 mix (1 cement 1 1/2 M sand 3 20mm chips) for Hand rail posts, handrails, and light post etc., as instructed by EIC including cost of all materials (Cement, M sand, 20 mm chips) all labour charges, transportation charge of materials to the site, hire charges of mixer machine, vibrator and minor tools all labour charge etc., complete.
13.5
-
-
... More
Applying one coat white cement primer over hand rails and jetty sides as directed by the EIC including cost of all materials, labour charges, minor tools, transportation charges etc, complete.
590
-
-
... More
Applying two coat of ready mixed acrylic plastic emulsion paint (Exterior emulsion) antifunges over the primer coat on the hand rail posts, hand rails, light posts and on the right sides of the newly concreted jetty superstructure (longitudinal beam, deck slab side) as per the direction of EIC including cost of all the required materials, minor tools and labour charges etc complete.
1070
-
-
... More
Painting with enamel paint of aproved brand like Berger, Shalimar, Asian,Dulux etc with two coats on metalic surface such as bollards gate, etc, including cost of paint, all labour charges, minor tools etc complete.
46
-
-
... More
Fabrication and fixing of MS rod for hand rail, hand rail post and lowlanding, including cost of MS rods, all labour charges, minor tools etc., completed.
13.5
-
-
... More
Providing form work including centering, shuttering so as to give a rough finish strutting and proping etc., height of proping & centering for hand rails and hand rials posts and removal of the same for in situ reinforced cement concrete & plain concrete work inlcuding cost of all labour charges minor tools and cost of centering materials etc., complete.
202
-
-
... More
Removing and stacking of damaged steel gate from jetty to departmntal yard including cost of all labour charges, cutting charges, transportation charges, etc., complete.
1
-
-
... More
Fabrication and fixing of Entrance gate of jetty as per e drawing including cost of all materials like 21/2 " GI Class "C" pipe, 1 Sq inch TATA tube of 4mm thick , suitable hinges, locking arrangements etc, cost of all labour charges, welding charges, transportaiton charges of all materials to work site, etc complete.
656
-
-
... More
Fixing of Gate as per the direction of EIC excluding cost of gate, cement and sand which will be issued by the department on free of cost at departmental store at Minicoy but including all other minor materialks, all labour charges, transportation charges of all materials to work site, etc complete.
1
-
-
... More
Lifting giant tyre fender of various size from sea bed spreaded along permises of Eastern side jetty berthing face of draught about 9 M to 15 M and shifting to the stack yard with in a KM excluding hire charges of Fork Lift /JCB crane which will be provided by the department on free of cost subject to availability but including all diving equipments, tackels, safety measures, transportation charges, all labour charges etc., complete as per the direction of Engineer-In- Chagre.
10
-
-
... More
Providing and fixing of giant tyre fender on berthing face of Eastern side jetty as directed by the Engineer in charge excluding cost of giant tyre fender , G.I. Chain D' shackles hire charges of Fork lift etc,which will be issued by department on free of cost at department store, but including cost of all labour charges , transporting charges of all materials to jetty, minor tools etc, complete.
20
-
-
... More
Re-arranging the dislocated giant tyre fenders of the berthing face of eastern side jetty due to regular berthing of cargo and passenger ships of UTLA and Indian Navy and Coast Guard ships by removing D shackles lifting and placing the giant tyre over the berthing jetty, re arranging the G.I. chains attending minor repairs for the chain by Cutting / adding pieces changing damaged D shackles with new placing the tyre back on the berhing face as directed by EIC locking to the U bolt with D shackles including cost of all labour charges minor tools but excluding cost of chain, D shackle wire ropes, hire charges of crane etc., complete which will be supplied by the department free of cost etc., complete.
50
-
-
... More
Lifting Pneumatic fender from the place of installation at sea and placing it over the berthing jetty as anand when required by the Engineer in charge for safe guarding the same from rough sea condition and for attending minor maintenance by engaging high skilled persons for providing necessary lifting arrangements on fenders at sea etc and placing the same back in to position when instructed, including cost of all labour charges, minor tools such as lifting belts, hook arrangements etc. but excluding hire charges of crane which will be provided free of cost by the department as per actual site requirements.
12
-
-