Public Works Department Tender

... More
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date10 Apr 2025
Closing Date25 Apr 2025
Tender Amount₹ 30,84,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hard rock (RB) 10%

30.59

797

24409.6

... More
Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in:

-

-

-

... More
All kind of soil 30%

115.23

295

34079.27

... More
Ordinary rock 70%

268.87

616

165669.63

... More
Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:4:8 (1: Cement: 4 coarse Sand: 8graded stone agg. 20mm nominal size) Crushed

34.5

4594

158509.91

... More
Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) Crushed

184.1

5472

1007417.29

... More
Cement concrete flooring 1:2:4 (1cement:2 course sand:4 graded stone agregade) finished with a floatin coat of neat cement including cement slurry ,but excluding soct of nosing of steps etc. complete 50mm thick with 20mm nominal size stone agregate Crushed

207

455

94257.45

... More
Reinforced cement concrete work in beams,suspended floors,roofs having slopes up to 15*landings, balconies,shelves,chajjas,lintels,bands, plain window sills ,staircases and spiral stairs cases up to floor five level edcluding the cost of centering shuttring, finishing reinforcement with 1:2:4(1cement:2coarse sand :4 graded crushed stone aggregate 20 mm nominal size.

10.31

8999

92787.01

... More
Reinforcement for RCC work including straeghtning, cutting ,beinding placing in position and binding all complete.Hot rolled deformed bars.

1463

87

127763.79

... More
Provision for supply of irrigation water during execuvation of work by way of laying of P V C pipes or any other means as per the direction of site engineer

1

41000

41000

... More
Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job

1366

393

537561.98

... More
Suspended floors

40.5

427

17314.56

... More
Edge of slab

90.3

204

18451.9

... More
Carriage of material from sources to acctual site of work including loding un loding and stocking complete.

-

-

-

... More
Sand/Stone Aggregates for average lead of 15 Kmt by MT and 2000Mtr by Headload.

325

1812

588942.25

... More
Cement average lead of 15Km by MT and 2000Mtr by Headload.

54.6

857

46800.94

... More
Steel average lead of 15 by MT and 2000Mtr by Headload.

1.46

1599

2334.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.