Public Works Department Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date4 Jan 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: A.All kinds of soil.

1

-

-

... More
B.Ordinary Rock

1

-

-

... More
C.Hard Rock (Blasting prohibited )

1

-

-

... More
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in widthas well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. A.All kinds of soil.

1

-

-

... More
B.Ordinary Rock

1

-

-

... More
C.Hard Rock (Requiring Blasting )

1

-

-

... More
D.Hard Rock (Blasting Prohibited)

1

-

-

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in Charge. A.All kinds of soil.

1

-

-

... More
B.Ordinary Rock.

1

-

-

... More
C.Hard Rock (Requiring Blasting ).

1

-

-

... More
D.Hard Rock (Blasting Prohibited).

1

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

-

-

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains ordrains and the like.

1

-

-

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5mrespectively ). A. Dry.

1

-

-

... More
B.Wet

1

-

-

... More
Shingle clearance from canals.

1

-

-

... More
In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.

1

-

-

... More
Constructing vertical bunds with sloping faces, by boulder filling (dry,hand packed tightly); including cost of stones but excluding cost of wirecrates.

1

-

-

... More
Laying of wooven crate in position.

1

-

-

... More
Hand packing stones in wire crates; including cost of stone & wire crate.

1

-

-

... More
Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials .

1

-

-

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 6.00 cum per 100 sq m on horizontal/side slopes; complete including curing.

1

-

-

... More
Opening out old wire crates those and re-binding after filling.

1

-

-

... More
Tipping stone-filled wire crates in position; including equipment charges.

1

-

-

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.

1

-

-

... More
Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m.

1

-

-

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

-

-

... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size).

1

-

-

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size.

1

-

-

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters,columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.

1

-

-

... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size).

1

-

-

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).

1

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for. A.Foundations, footings, bases of columns etc. for mass concrete.

1

-

-

... More
B.Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

-

-

... More
C.Suspended floors, roofs, landings, balconies and access platforms.

1

-

-

... More
D.Columns, pillars, piers, abutments, posts and struts.

1

-

-

... More
E.Edges of slabs and breaks in floors and wallS.

1

-

-

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix).

1

-

-

... More
1:4:8 or leaner mix (i/c equivalent design mix).

1

-

-

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

-

-

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

-

-

... More
Dismantling Dry stone pitching in aprons, drains, etc. including stacking of serviceable material & disposal of unserviceable material, stacking /disposal lead upto 100 meters.

1

-

-

... More
Dismantling concrete grouted stone pitching in aprons drains etc. including stacking of serviceable material and disposal of unserviceable material, stacking /disposal lead upto 100 meters.

1

-

-

... More
Providing & laying of MS pipe including excavating the trenches & carriage of material up to site of work carriage complete job. a.300mm dia.

1

-

-

... More
b.200mm dia.

1

-

-

... More
c.150mm dia.

1

-

-

... More
Providing & laying of Niddi pipe with brass coupling at both side, including carriage of material for sore to site of work complete job. a.150mm dia.

1

-

-

... More
b.100mm dia.

1

-

-

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Welded

1

-

-

... More
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.