Public Works Department Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date18 Sep 2024
Closing Date1 Oct 2024
Tender Amount₹ 90,96,000 
Notes
Download

Costs

Summary

Construction Of Approach Road To 10m Span R.c.c Motorable Bridge In Link Road From Tunet Gongma To Spang Chenmo.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Making knitted wire crates of approved mesh-size; including weaving, binding sides and partitions, and binding top after filling; excluding cost of filling, stones and weaving materials

271.52

-

71.56

... More
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil:

3087.5

-

571.48

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

7.27

-

4494.76

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

23.6

-

6720.35

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

12.48

-

9060.22

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.

1494

-

94.02

... More
Centering and shuttering including strutting, propping etc. and removal of form work for: a) Foundations, footings, bases for columns, etc for mass concrete

21.16

-

288.97

... More
b)Suspended floors, roofs, landings, balconies and access platforms. Columns, pillars, piers, abutments, posts and struts.

27.3

-

583.57

... More
c) Edges of slab and breaks in floors and walls above 20cm wide. Lintel, beams, plinth beams, girders, bressumers and cantilevers.

77

-

246.4

... More
d) Columns, pillars, piers, abutments, posts and struts.

4.6

-

691.67

... More
Carriage of material by MT source to site including loading, unloading and stacking, complete. a) Crate avg lead upto 110 km

5.76

-

3313.19

... More
b) Cement avg lead upto 110 km

49.92

-

1104.1

... More
c) Sand avg lead upto 80 km

19.87

-

956.51

... More
d) Aggregate avg lead 80 km

39.25

-

956.51

... More
e) Steel avg lead upto 110 km

14.94

-

1104.1

... More
f) Soiling Stone avg lead upto 05 km

5.86

-

232.47

... More
g) Stone avg lead upto 30 km

2236.97

-

513.22

... More
Add cost of Crate Wire

232

-

4661.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.