Public Works Department Tender
... More
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 73,100Document Cost
₹ 370Tender Fee
Refer Documents
Summary
Construction Of Flood Protection Bund/nallah Training At Olikhotu From Rd 0-120 Mtr Both Sides
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_15603_1Tender No
E-Tender 48 of 2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hard Rock (BP) 15%
17.78
1987
35345.22
... More
Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides andramming of bottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m.
-
-
-
... More
All Kinds of Soil 75%
117.41
431
50650.67
... More
Ordinary Rock 10%
15.65
954
14937.93
... More
Hard Rock (BP) 15%
23.48
1947
45721.66
... More
Cast in situ plum concrete work of nominal mix concrete M-10 grade (total mass of dry nallah aggregate 480kg(max excluding plums) and water 34Kg (max) per 50kg of cement) nominal max size of stone aggregate 20mm, volumetric batching using plum aggregate 20mm, volumetric batching using plum (size over 160mm, split nallah stone or quarry stone) @20% of gross volume upto plinth level excluding cost of form work and including curing
522.23
5166
2697840.18
... More
Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job
817
614
502340.62
... More
Filling of avalable excavated earth (excluding rock) in trenches plinth ,side s of foundation etc. layers not exceeding 20Cm in depth ,consoloadating each deposited layer by ramming and watering lead upto 50mtr and lift upto i.5 mtr
65.85
213
14043.17
... More
Carriage of different material from source to actual site of work including loading ,unloading and stacking complete
-
-
-
... More
Cement 80 Km by MT.
91.91
802
73740.31
... More
Sand/Aggregate 05 Km by MT
710.23
224
159190.95
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%