Public Works Department Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 1,71,460Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWD_14300_1Bid Award Id
ViewTender No
MDL TS 23 OF 2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://jkpwdrb.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Central Heating System Air Conditioning Cooling during Summers for Supply Installation Testing and Commissioning of central heating system with heat pump at Office Complex of Legal Service Authority Leh UT Ladakh
Central Heating System Air Conditioning Cooling during Summers for Supply Installation Testing and Commissioning of central heating system with heat pump at Office Complex of Legal Service Authority Leh UT Ladakh
Central Heating System Air Conditioning Cooling during Summers for Supply Installation Testing and Commissioning of central heating system with heat pump at Office Complex of Legal Service Authority Leh UT Ladakh
BOQ Items
... More
FCU Floor Mounted Type Model :MKH1-350-R3 equivalent model Heating /Cooling Capacity (KW ): 3
8
-
-
... More
FCU Floor Mounted Type Model :MKH1-350-R3 equivalent model Heating /Cooling Capacity (KW ):5
3
-
-
... More
FCU Floor Mounted Type Model :MKH1-350-R3 equivalent model Heating /Cooling Capacity (KW ): 8
11
-
-
... More
Wired Thermostatic controller.
22
-
-
... More
Hot Water Circulation Pump: (3 Nos) Supply, Installation, Testing & Commissioning of Chilled / Hot Water duty centrifugal Vertical/Horizontal inline split coupled (long/close coupled) pumps with outside mechnical seal, complete with motor, drain valves and other accessories (except suction and discharge shut off valves, suction strainer, discharge check valves and drain piping which are covered under separate item). Pumps shall have mechanical seal and CI casing & Bronze Impeller, SS Shaft. The pump motor shall be of IE-3 class efficiency, TEFC Squirrel cage class -F insulation, suitable for 415 Volts ± 10%, 50 cycles, 3 phase power supply. Head : 25 Mtr Flow : 20000 Make : Wilo/ Grunfos
1
-
-
... More
Control Panel for Complete system: Supply, Installation, testing & commissioning of Cubical type main MV panel board suitable for 3 phase, 415 volts, 50 Hz and of 36 KA rupturing capacity at 415 volts, fabricated from minimum 2 mm thick and doors of 1.6 mm thick CRCA sheet powder coated through seven tank process facility for prickling and degreasing complete with mountings, interconnections, earthing etc including mechanical and Electrical Inter locking as required. Make of Equipment : Schneider/L&T Outer Body: The Heating Expert Controls: Heat Pump: 4 Pole MCCB Recirculation Pump: DOL Starter Electric Backup: Temperature Control
1
-
-
... More
Booster Pump (Working + Standby) to maintain the
pressure in the pipiline, Make: Grundfos/Wilo
Head 25 Mtr Flow 10000 lph
1
-
-
... More
Buffer Tank and HotWater Storage
(Pressurized 3 bar)
TankCapacity: (100 L) Ltrs.
Outer CladdingSS304
MOCTank:SS304
Insulation:PUF Insulation 50mm
ElectricBackup:9Kwx 2Nos
2
-
-
... More
Supply/Return Piping. SITC of Heavy Duty MS Class "C" Pipes insulated with 2" thick Glass wool of density 16Kg/M³ or 1" thick Nitrile foam with aluminium cladding and including all fittings like flanges, TEE, Bends, Reducers, iron stands etc. MAKE: Jindal/ Surya Prakash/ Tata. 85 mm
60
-
-
... More
65 mm
104
-
-
... More
40 mm
85
-
-
... More
32 mm
60
-
-
... More
25 mm
100
-
-
... More
15 mm
140
-
-
... More
Valve.
85mm Dia (Butterfly Valve)
6
-
-
... More
65mm Dia (Butterfly Valve)
6
-
-
... More
Non toxic antifreeze (The right antifreeze product intended for use in heating boilers not automobile as the chemicals are different ) Propylene Glycol mixture is installed in the system to avoid costly water or mold contamination .
The amount or volume of antifreeze need to add to reach a desired freezing temperature of -40˚C.
Note: the quantity of anti-freeze is purely tentative.
840
-
-
... More
UnderfloorHeatingDetails:
Requriments
Area 367Sqft:Pert/Pex Pipe16mm
XPS Insulation 25mm 48 density
PESheet
Mainfold4in/out
Clip
Supply MAIN CORE MAKE Climaveneta,Vaillant and Stiebel eltron.
1
-
-
... More
Operation and Annual Maintenance of complete system for period of twenty-four (24) months for Supply Installation Testing and Commissioning of central heating system with heat pump and standby electric / diesel boiler at High Court Guest house Leh UT Ladakh. The contractor shall depute minimum one qualified operator to operate the plant 24 X 7 and carry out routines checks for a period of twenty-four (24) months warranty period from the date of successful commissioning of the machinery. During the period of installation and testing, if found necessary, the firm shall train personnel at his works at no extra cost to the Department for future. The contractor shall also arrange to provide at no extra cost necessary personnel to carry out all routine and special maintenance of the plant as required regularly for a period of twenty-four (24) months warranty period starting from the date of virtual completion of project including weekly inspection by contractor or his technical representative during warranty period.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements