Public Works Department Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Public Works Department - PWD Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date27 Sep 2024
Closing Date15 Oct 2024
Tender Amount₹ 85,73,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Central Heating System Air Conditioning Cooling during Summers for Supply Installation Testing and Commissioning of central heating system with heat pump at Office Complex of Legal Service Authority Leh UT Ladakh
Central Heating System Air Conditioning Cooling during Summers for Supply Installation Testing and Commissioning of central heating system with heat pump at Office Complex of Legal Service Authority Leh UT Ladakh
Central Heating System Air Conditioning Cooling during Summers for Supply Installation Testing and Commissioning of central heating system with heat pump at Office Complex of Legal Service Authority Leh UT Ladakh
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
FCU Floor Mounted Type Model :MKH1-350-R3 equivalent model Heating /Cooling Capacity (KW ): 3

8

-

-

... More
FCU Floor Mounted Type Model :MKH1-350-R3 equivalent model Heating /Cooling Capacity (KW ):5

3

-

-

... More
FCU Floor Mounted Type Model :MKH1-350-R3 equivalent model Heating /Cooling Capacity (KW ): 8

11

-

-

... More
Wired Thermostatic controller.

22

-

-

... More
Hot Water Circulation Pump: (3 Nos) Supply, Installation, Testing & Commissioning of Chilled / Hot Water duty centrifugal Vertical/Horizontal inline split coupled (long/close coupled) pumps with outside mechnical seal, complete with motor, drain valves and other accessories (except suction and discharge shut off valves, suction strainer, discharge check valves and drain piping which are covered under separate item). Pumps shall have mechanical seal and CI casing & Bronze Impeller, SS Shaft. The pump motor shall be of IE-3 class efficiency, TEFC Squirrel cage class -F insulation, suitable for 415 Volts ± 10%, 50 cycles, 3 phase power supply. Head : 25 Mtr Flow : 20000 Make : Wilo/ Grunfos

1

-

-

... More
Control Panel for Complete system: Supply, Installation, testing & commissioning of Cubical type main MV panel board suitable for 3 phase, 415 volts, 50 Hz and of 36 KA rupturing capacity at 415 volts, fabricated from minimum 2 mm thick and doors of 1.6 mm thick CRCA sheet powder coated through seven tank process facility for prickling and degreasing complete with mountings, interconnections, earthing etc including mechanical and Electrical Inter locking as required. Make of Equipment : Schneider/L&T Outer Body: The Heating Expert Controls: Heat Pump: 4 Pole MCCB Recirculation Pump: DOL Starter Electric Backup: Temperature Control

1

-

-

... More
Booster Pump (Working + Standby) to maintain the pressure in the pipiline, Make: Grundfos/Wilo Head 25 Mtr Flow 10000 lph

1

-

-

... More
Buffer Tank and HotWater Storage (Pressurized 3 bar) TankCapacity: (100 L) Ltrs. Outer CladdingSS304 MOCTank:SS304 Insulation:PUF Insulation 50mm ElectricBackup:9Kwx 2Nos

2

-

-

... More
Supply/Return Piping. SITC of Heavy Duty MS Class "C" Pipes insulated with 2" thick Glass wool of density 16Kg/M³ or 1" thick Nitrile foam with aluminium cladding and including all fittings like flanges, TEE, Bends, Reducers, iron stands etc. MAKE: Jindal/ Surya Prakash/ Tata. 85 mm

60

-

-

104

-

-

85

-

-

60

-

-

100

-

-

140

-

-

... More
Valve. 85mm Dia (Butterfly Valve)

6

-

-

... More
65mm Dia (Butterfly Valve)

6

-

-

... More
Non toxic antifreeze (The right antifreeze product intended for use in heating boilers not automobile as the chemicals are different ) Propylene Glycol mixture is installed in the system to avoid costly water or mold contamination . The amount or volume of antifreeze need to add to reach a desired freezing temperature of -40˚C. Note: the quantity of anti-freeze is purely tentative.

840

-

-

... More
UnderfloorHeatingDetails: Requriments Area 367Sqft:Pert/Pex Pipe16mm XPS Insulation 25mm 48 density PESheet Mainfold4in/out Clip Supply MAIN CORE MAKE Climaveneta,Vaillant and Stiebel eltron.

1

-

-

... More
Operation and Annual Maintenance of complete system for period of twenty-four (24) months for Supply Installation Testing and Commissioning of central heating system with heat pump and standby electric / diesel boiler at High Court Guest house Leh UT Ladakh. The contractor shall depute minimum one qualified operator to operate the plant 24 X 7 and carry out routines checks for a period of twenty-four (24) months warranty period from the date of successful commissioning of the machinery. During the period of installation and testing, if found necessary, the firm shall train personnel at his works at no extra cost to the Department for future. The contractor shall also arrange to provide at no extra cost necessary personnel to carry out all routine and special maintenance of the plant as required regularly for a period of twenty-four (24) months warranty period starting from the date of virtual completion of project including weekly inspection by contractor or his technical representative during warranty period.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.