Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 27,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Supply Installation Testing And Commissioning For Creation Of 2x25kva Substations At Skurbuchan Hanuthang And 1x63kva Substations At Khaltsi Tcp
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDNRE_13536_1Bid Award Id
ViewTender No
e-NIT No. 31 of ED Leh of 2024-25 dated 29-07-2024Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply Installation Testing and Commissioning for Creation of 2x25KVA Substations at Skurbuchan Hanuthang and 1x63KVA Sub-Stations at Khaltsi TCP along with laying of HT LT Line for Dett 81 RCC GREF on full turnkey basis Under Deposit Work 2024 25
BOQ Items
Supply of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
3
-
-
Supply of 11KV GO, AB Switch 3-phase, 3-pole, 200 Asmp, Vertical Type
3
-
-
Supply of 11 kV Horn Gap Fuse Set 3 Phase 200A
3
-
-
Supply of 35 mm² Cable,1.1kV Grade, PVC XLPE unarmoured FRLS type
132
-
-
Supply of 70 mm² Cable,1.1kV Grade, PVC XLPE unarmoured FRLS type
66
-
-
Supply of 9 Mtr. Long Pole,ST-410 SP33)
6
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
9
-
-
Supply of GI Channel/Angle/Flat of sizes including clamps
900
-
-
Supply of Galvinized Nuts and Bolts.
24
-
-
Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
9
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
18
-
-
LT Distribution Box for 63 kVA DTR with TPN MCCB short ckt rating 16 KA for incomer 340Amp (250KVA) and suitable MCCBs for outgoing circuits with terminal extensions
1
-
-
Supply of 63 Amps TNP Switch Disconnector Fuse Unit
2
-
-
Supply of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stayrod& 7/3.15 mm dia GI stranded wire complete
6
-
-
Supply of Three Phase Treivector meter (Smart Meter)
3
-
-
Supply of Wedge Connectors/PG Clamps
18
-
-
Supply of Danger Plates with Clamps
2
-
-
Supply of GI Barbed Wire for Anti Climbing
45
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards.5cum/pole
9
-
-
Supply of Painting of Poles Red Oxide
9
-
-
Supply of Painting of Poles Aluminium Paint
9
-
-
Sundry items like aluminium lugs, Jumpers, binding Tape
3
-
-
Installation/Testing/Commissioning (Part)
-
-
-
Supply of 63 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or her kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate
1
-
-
Supply of 25 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or her kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate
2
-
-
Supply of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
3
-
-
Supply of 11KV GO, AB Switch 3-phase, 3-pole, 200 Asmp, Vertical Type
3
-
-
Supply of 11 kV Horn Gap Fuse Set 3 Phase 200A
3
-
-
Supply of 35 mm² Cable,1.1kV Grade, PVC XLPE unarmoured FRLS type
132
-
-
Supply of 70 mm² Cable,1.1kV Grade, PVC XLPE unarmoured FRLS type
66
-
-
Supply of 9 Mtr. Long Pole,ST-410 SP33)
6
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
9
-
-
Supply of GI Channel/Angle/Flat of sizes including clamps
900
-
-
Supply of Galvinized Nuts and Bolts.
24
-
-
Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
9
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
18
-
-
LT Distribution Box for 63 kVA DTR with TPN MCCB short ckt rating 16 KA for incomer 340Amp (250KVA) and suitable MCCBs for outgoing circuits with terminal extensions
1
-
-
Supply of 63 Amps TNP Switch Disconnector Fuse Unit
2
-
-
Supply of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stayrod& 7/3.15 mm dia GI stranded wire complete
6
-
-
Supply of Three Phase Treivector meter (Smart Meter)
3
-
-
Supply of Wedge Connectors/PG Clamps
18
-
-
Supply of Danger Plates with Clamps
2
-
-
Supply of GI Barbed Wire for Anti Climbing
45
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards.5cum/pole
9
-
-
Supply of Painting of Poles Red Oxide
9
-
-
Supply of Painting of Poles Aluminium Paint
9
-
-
Sundry items like aluminium lugs, Jumpers, binding Tape
3
-
-
HT line (Supply Part)
-
-
-
Supply of 9 Mtr. Long Pole,ST-410 SP33)
2
-
-
Supply of GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
90
-
-
Supply of 50 mm² ACSR Conductor
0.4
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
18
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV, min failing load 70kn, lighting impulse 170kv positive and 180kv Negative, creepage distance 900mm
12
-
-
Supply of Galvinized Nuts and Bolts
3
-
-
Supply of Danger Plates with Clamps
2
-
-
Supply of Anti-Climbing Device with Clamps
2
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
2
-
-
Supply of Red Oxide
2
-
-
Supply of Aluminium Paint
2
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
2
-
-
Supply of Aluminium jointing sleeves
2
-
-
HT line (installation/Testing /Commissioning Part)
-
-
-
Installation/Testing/Commissioning of 9 Mtr. Long Pole,ST-410 SP33)
2
-
-
Installation/Testing/Commissioning of GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
90
-
-
Installation/Testing/Commissioning of 50 mm² ACSR Conductor
0.4
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
18
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Disc Insulator 36kV, min failing load 70kn, lighting impulse 170kv positive and 180kv Negative, creepage distance 900mm
12
-
-
Installation/Testing/Commissioning of Galvinized Nuts and Bolts
3
-
-
Installation/Testing/Commissioning of Danger Plates with Clamps
2
-
-
Installation/Testing/Commissioning of Anti-Climbing Device with Clamps
2
-
-
Installation/Testing/Commissioning of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
2
-
-
Installation/Testing/Commissioning of Red Oxide
2
-
-
Installation/Testing/Commissioning of Aluminium Paint
2
-
-
Installation/Testing/Commissioning of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
2
-
-
Supply of Aluminium jointing sleeves
2
-
-
LT 3-phase/1-phase (Supply Part)
-
-
-
Supply of 8 Mtr. Long Pole( ST-410 SP15)
1
-
-
Supply of GI Channel X-arm (75x40x6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8.83kg, 1No Clamp = 0.83Kg=total weight = 8.83kg)
16
-
-
Supply of 30mmsq ACSR Conductor
0.2
-
-
Supply of 16KN Polymer Shackle Insulator
10
-
-
Supply of Galvinized Nuts and Bolts.
1
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
1
-
-
Supply of Red Oxide
1
-
-
Supply of Aluminium Paint
1
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
1
-
-
LT line (installation/Testing /Commissioning Part)
-
-
-
Supply of 8 Mtr. Long Pole( ST-410 SP15)
1
-
-
Supply of GI Channel X-arm (75x40x6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8.83kg, 1No Clamp = 0.83Kg=total weight = 8.83kg)
16
-
-
Supply of 30mmsq ACSR Conductor
0.2
-
-
Supply of 16KN Polymer Shackle Insulator
10
-
-
Supply of Galvinized Nuts and Bolts.
1
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
1
-
-
Supply of Red Oxide
1
-
-
Supply of Aluminium Paint
1
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements