Power Development And Non Renewable Energy Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Power Development And Non Renewable Energy Tender

Works
Energy, Oil and Gas
Electrical and Electronics
Solar Installation and Products
Eprocure
Opening Date15 Jun 2024
Closing Date6 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SITC of 8kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 8kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 480 mtr (as per requirement). 7) 3.5C x 10 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 24 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 5 no. (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.

37

-

-

... More
SITC of 10kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 10kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 600 mtr (as per requirement). 7) 3.5C x 16 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 30 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 6 no (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.

41

-

-

... More
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 15kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 900 mtr (as per requirement). 7) 3.5C x 16 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 45 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 9 no (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 3 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.

4

-

-

... More
SITC of 25kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 50 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 25kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6) 1C x 4 sqmm DC copper cable = 1500 mtr (as per requirement). 7) 3.5C x 35 sqmm AL armoured AC cable =150 mtr (as per requirement). 8) MC4 connectors = 75 pairs (as per requirement). 9) ACDB = 1 no. 10) Earthing (as per TS) = 15no. (as per requirement). 11) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 5 set (as per requirement). 12) Solar meter Uni-Directional = 1 no.

8

-

-

... More
OFF GRID HYBRID

-

-

-

... More
SITC of 3kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 6 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3kW, 48 V MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 4 no. (Battery bank voltage =48V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 1C x 10 sqmm AL Copper cable = 30mtr (as per requirement). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.

98

-

-

... More
SITC of 5kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 10 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 5 KW, 48 V MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 8 no. (Battery bank voltage =48V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 1C x 10 sqmm AL Copper cable = 30 mtr (as per requirement). 9) MC4 connectors = 15 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 3 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 1 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.

35

-

-

... More
SITC of 8kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 16 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase,8kW, (200-850V) MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 8no. (Battery bank voltage =48/96V) 7) 1C x 4 sqmm DC copper cable = 300 mtr (as per requirement). 8) 3.5C x 10 sqmm AL armourd AC cable = 150 mtr (as per requirement). 9) MC4 connectors = 30 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.

12

-

-

... More
SITC of 10kW Off Grid Hybrid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 20 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 10 kW(200-850V) MPPT, PCU(inverter) Off Grid Hybrid based =1no. 6) Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 10 no. (Battery bank voltage =120V) 7) 1C x 4 sqmm DC copper cable = 600 mtr (as per requirement). 8) 3.5C x 10 sqmm AL armourd AC cable = 150 mtr (as per requirement). 9) MC4 connectors = 30 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 6 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 2 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.

9

-

-

... More
SITC of 15kW On Grid Solar Power Plant 1) Solar module (410-550Wp) Mono PERC = 30 no. 2) Module mounting structure (as per TS) = 1 set (as per requirement). 3) Array Junction Box = 1 no (as per requirement). 4) DCDB = 1 no. 5) 3 phase, 15kW, (200-850V) MPPT, PCU(inverter) On Grid based =1no. 6)Tubular LMLA Type Battery 160AH @C10 at 27 Degree with battery racks = 20 no. (Battery bank voltage =120/240V) 7) 1C x 4 sqmm DC copper cable = 900 mtr (as per requirement). 8) 3.5C x 25 sqmm AL armoured AC cable =150 mtr (as per requirement). 9) MC4 connectors = 45 pairs (as per requirement). 10) ACDB = 1 no. 11) Earthing (as per TS) = 12 no (as per requirement). 12) Installation Kit (cable tie, Thimble, Ferrules, aluminium earthing strips, Earthing insulators, saddles, PVC conduit and bands, Dangers boards etc.) = 4 set (as per requirement). 13) Solar meter Uni-Directional = 1 no.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.