Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 98,000Document Cost
₹ 2,500Tender Fee
Refer Documents
Summary
Supply, Installation, Testing Commissioning For Providing Single Phase Lt Connection And Creation Of Sub-station At Various
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDNRE_13014_2Bid Award Id
ViewTender No
e-NIT No 08 of ED Leh of 2024 25 dated 12-06-2024Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply, Installation, Testing Commissioning for Providing Single Phase LT Connection and Creation of Sub-Station at various SWAN Sites in Leh District on full turkey basis under Deposit Work 2024-25
BOQ Items
Supply of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
5
-
-
Supply of 11KV GO, AB Switch 3-phase, 3-pole, 200 Asmp, Vertical Type
5
-
-
Supply of 11 kV Horn Gap Fuse Set 3 Phase 200A
5
-
-
Supply of 25 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 25/63/100KVA & 250KVA DTs
132
-
-
Supply of 120 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 25/63/100KVA & 250KVA DTs
88
-
-
Supply of 9 Mtr. Long Pole,ST-410 SP33)
10
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
15
-
-
Supply of GI Channel/Angle/Flat of sizes including clamps
1500
-
-
Supply of Galvinized Nuts and Bolts.
80
-
-
Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
30
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
30
-
-
Supply of 63 Amps TNP Switch Disconnector Fuse Unit
3
-
-
Supply of LT Distribution Box for 100kVA DTR with TPN MCCB short ckt rating 16 KA for incomer 140 Amp (63/100/250KVA) and suitable MCCBs for outgoing circuits with terminal extensions
2
-
-
Supply of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stayrod& 7/3.15 mm dia GI stranded wire complete
5
-
-
Supply of Three Phase Treivector meter (Smart Meter)
5
-
-
Supply of Wedge Connectors/PG Clamps
60
-
-
Supply of Danger Plates with Clamps
5
-
-
Supply of GI Barbed Wire for Anti Climbing
75
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards.5cum/pole
10
-
-
Supply of Painting of Poles Red Oxide
10
-
-
Supply of Painting of Poles Aluminium Paint
10
-
-
Supply of Transformer fencing
2
-
-
Installation/Testing/Commissioning (Part)
-
-
-
Installation/Testing/Commissioning of 25 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or her kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate
3
-
-
Installation/Testing/Commissioning of 100 KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or her kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate
2
-
-
Installation/Testing/Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
5
-
-
Installation/Testing/Commissioning of 11KV GO, AB Switch 3-phase, 3-pole, 200 Asmp, Vertical Type
5
-
-
Installation/Testing/Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
5
-
-
Installation/Testing/Commissioning of 25 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 25/63/100KVA & 250KVA DTs
132
-
-
Installation/Testing/Commissioning of 120 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 25/63/100KVA & 250KVA DTs
88
-
-
Installation/Testing/Commissioning of 9 Mtr. Long Pole,ST-410 SP33)
10
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
15
-
-
Installation/Testing/Commissioning of GI Channel/Angle/Flat of sizes including clamps
1500
-
-
Installation/Testing/Commissioning of Galvinized Nuts and Bolts.
80
-
-
Installation/Testing/Commissioning of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
30
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
30
-
-
Installation/Testing/Commissioning of 63 Amps TNP Switch Disconnector Fuse Unit
3
-
-
Installation/Testing/Commissioning of LT Distribution Box for 100kVA DTR with TPN MCCB short ckt rating 16 KA for incomer 140 Amp (63/100/250KVA) and suitable MCCBs for outgoing circuits with terminal extensions
2
-
-
Installation/Testing/Commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stayrod& 7/3.15 mm dia GI stranded wire complete
5
-
-
Installation/Testing/Commissioning of Three Phase Treivector meter (Smart Meter)
5
-
-
Installation/Testing/Commissioning of Wedge Connectors/PG Clamps
60
-
-
Installation/Testing/Commissioning of Danger Plates with Clamps
5
-
-
Installation/Testing/Commissioning of GI Barbed Wire for Anti Climbing
75
-
-
Installation/Testing/Commissioning of Painting of Poles Red Oxide
10
-
-
Installation/Testing/Commissioning of Painting of Poles Aluminium Paint
10
-
-
Installation/Testing/Commissioning of Cement bottoming 1:2:4 mix as per REC standards.5cum/pole
10
-
-
Installation/Testing/Commissioning of Transformer fencing
2
-
-
HT line (Supply Part)
-
-
-
Supply of 9 Mtr. Long Pole,ST-410 SP33)
31
-
-
Supply of GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
526
-
-
Supply of GI Channel X-arm including clamps and braces for DP (80kg/DP)
240
-
-
Supply of 50 mm² ACSR Conductor
1204
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
111
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV, min failing load 70kn, lighting impulse 170kv positive and 180kv Negative, creepage distance 900mm
21
-
-
Supply of Galvinized Nuts and Bolts
31
-
-
Supply of Danger Plates with Clamps
31
-
-
Supply of Anti-Climbing Device with Clamps
31
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
31
-
-
Supply of Red Oxide
31
-
-
Supply of Aluminium Paint
31
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
31
-
-
HT line (installation/Testing /Commissioning Part)
-
-
-
Installation/Testing/Commissioning of 9 Mtr. Long Pole,ST-410 SP33)
31
-
-
Installation/Testing/Commissioning of GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
526
-
-
Installation/Testing/Commissioning of GI Channel X-arm including clamps and braces for DP (80kg/DP)
240
-
-
Installation/Testing/Commissioning of 50 mm² ACSR Conductor
1204
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
111
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Disc Insulator 36kV, min failing load 70kn, lighting impulse 170kv positive and 180kv Negative, creepage distance 900mm
21
-
-
Installation/Testing/Commissioning of Galvinized Nuts and Bolts
31
-
-
Installation/Testing/Commissioning of Danger Plates with Clamps
31
-
-
Installation/Testing/Commissioning of Anti-Climbing Device with Clamps
31
-
-
Installation/Testing/Commissioning of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
31
-
-
Installation/Testing/Commissioning of Red Oxide
31
-
-
Installation/Testing/Commissioning of Aluminium Paint
31
-
-
Installation/Testing/Commissioning of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
31
-
-
LT 3-phase/1-phase (Supply Part)
-
-
-
Supply of 50 sqmm LT AB Cable
620
-
-
Supply of 8 Mtr. Long Pole( ST-410 SP15)
18
-
-
Supply of GI Channel X-arm (75x40x6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4kg, 1No Clamp = 0.83Kg=total weight = 4.83kg)
82
-
-
Supply of 30mmsq ACSR Conductor
1.1
-
-
Supply of 16KN Polymer Shackle Insulator
32
-
-
Supply of Suspension fitting
11
-
-
Supply of Tension fitting
10
-
-
Supply of straight through cable jointing kit
9
-
-
Supply of Galvinized Nuts and Bolts.
18
-
-
Supply of Danger Plate
18
-
-
Supply of Anti Climbing devices with clamp.
18
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
18
-
-
Supply of Red Oxide
18
-
-
Supply of Aluminium Paint
18
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
18
-
-
Supply of SMDB
9
-
-
Supply of Stay Set
7
-
-
Supply of Single phase energy meter (smart meter)
13
-
-
Supply of Service Cable Single Core 35sqmm
70
-
-
Supply of Service Line 3.5 Core 16sqmm
290
-
-
Supply ofService Line 2 Core 10sqmm
140
-
-
Supply ofService Line 2 Core 12sqmm AI service cable
155
-
-
IPC
31
-
-
LT line (installation/Testing /Commissioning Part)
-
-
-
Installation/Testing/Commissioning of 50 sqmm LT AB Cable
620
-
-
Installation/Testing/Commissioning of 8 Mtr. Long Pole( ST-410 SP15)
18
-
-
Installation/Testing/Commissioning of GI Channel X-arm (75x40x6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4kg, 1No Clamp = 0.83Kg=total weight = 4.83kg)
82
-
-
Installation/Testing/Commissioning of 50mmsq ACSR Conductor
0.7
-
-
Installation/Testing/Commissioning of 16KN Polymer Shackle Insulator
32
-
-
Installation/Testing/Commissioning of Suspension fitting
11
-
-
Installation/Testing/Commissioning of Tension fitting
10
-
-
Installation/Testing/Commissioning of straight through cable jointing kit
9
-
-
Installation/Testing/Commissioning of Galvinized Nuts and Bolts.
21
-
-
Installation/Testing/Commissioning of Danger Plate
8
-
-
Installation/Testing/Commissioning of Anti Climbing devices with clamp.
8
-
-
Installation/Testing/Commissioning of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
18
-
-
Supply of Red Oxide
18
-
-
Installation/Testing/Commissioning of Aluminium Paint
18
-
-
Installation/Testing/Commissioning of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
18
-
-
Installation/Testing/Commissioning of SMDB
9
-
-
Installation/Testing/Commissioning of Stay Set
7
-
-
Installation/Testing/Commissioning of Single phase energy meter (smart meter)
11
-
-
Installation/Testing/Commissioning of Service Cable Single Core 35sqmm
70
-
-
Installation/Testing/Commissioning of Service Line 3.5 Core 16sqmm
290
-
-
Installation/Testing/Commissioning of Service Line 2 Core 10sqmm
140
-
-
Installation/Testing/Commissioning of Service Line 2 Core 12sqmm AI service cable
155
-
-
IPC
31
-
-