Power Development And Non Renewable Energy Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 1,28,000Document Cost
₹ 2,500Tender Fee
Refer Documents
Summary
Supply Installation Testing And Commissioning For Shifting Of 11kv Line And Lt Line Coming
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDNRE_13862_1Bid Award Id
ViewTender No
e-NIT No. 42 of ED Leh of 2024-25 dated 24-08-2024Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply Installation Testing and Commissioning for Shifting of 11KV Line and LT Line coming on various PMGSY-III roads on full turnkey basis Under Deposit Work 2024-25
BOQ Items
Supply of GI Channel X-arm including clamps and braces for DP (80kg/DP)
960
-
-
Supply of 30 mm² ACSR Conductor
11.9
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
234
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV, min failing load 70kn, lighting impulse 170kv positive and 180kv Negative, creepage distance 900mm
117
-
-
Supply of Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x200x6mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16mm diameter solid GS Stay rod & 7/3.15 mm dia GI stranded wire complete
32
-
-
Supply of Galvinized Nuts and Bolts
108
-
-
Supply of Danger Plates with Clamps
78
-
-
Supply of Anti-Climbing Device with Clamps
78
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
108
-
-
Supply of Red Oxide
78
-
-
Supply of Aluminium Paint
105
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
135
-
-
Supply of Aluminium jointing sleeves
58
-
-
HT line (installation/Testing /Commissioning Part)
-
-
-
Installation/Testing/Commissioning of 9 Mtr. Long Pole,ST-410 SP33)
78
-
-
Installation/Testing/Commissioning of GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
1024
-
-
Installation/Testing/Commissioning of GI Channel X-arm including clamps and braces for DP (80kg/DP)
960
-
-
Installation/Testing/Commissioning of 30 mm² ACSR Conductor
11.9
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
234
-
-
Installation/Testing/Commissioning of 33kV Polymeric composite Disc Insulator 36kV, min failing load 70kn, lighting impulse 170kv positive and 180kv Negative, creepage distance 900mm
117
-
-
Installation/Testing/Commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator (2Nos.), anchor plate (200x200x6mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16mm diameter solid GS Stay rod & 7/3.15 mm dia GI stranded wire complete
32
-
-
Installation/Testing/Commissioning of Galvinized Nuts and Bolts
108
-
-
Installation/Testing/Commissioning of Danger Plates with Clamps
78
-
-
Installation/Testing/Commissioning of Anti-Climbing Device with Clamps
78
-
-
Installation/Testing/Commissioning of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
108
-
-
Installation/Testing/Commissioning of Red Oxide
78
-
-
Installation/Testing/Commissioning of Aluminium Paint
105
-
-
Installation/Testing/Commissioning of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
135
-
-
Installation/Testing/Commissioning of Aluminium jointing sleeves
58
-
-
LT 3-phase/1-phase (Supply Part)
-
-
-
Supply of GI Channel X-arm (75x40x6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4kg, 1No Clamp = 0.83Kg=total weight = 4.83kg)
5
-
-
Supply of GI Channel X-arm (75x40x6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8.83kg, 1No Clamp = 0.83Kg=total weight = 8.83kg)
9
-
-
Supply of 30mmsq ACSR Conductor
0.2
-
-
Supply of 16KN Polymer Shackle Insulator
6
-
-
Supply of Galvinized Nuts and Bolts.
4
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
4
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
28
-
-
LT line (installation/Testing /Commissioning Part)
-
-
-
Installation/Testing/Commissioning of GI Channel X-arm (75x40x6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4kg, 1No Clamp = 0.83Kg=total weight = 4.83kg)
5
-
-
Installation/Testing/Commissioning of GI Channel X-arm (75x40x6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8.83kg, 1No Clamp = 0.83Kg=total weight = 8.83kg)
9
-
-
Installation/Testing/Commissioning of 30mmsq ACSR Conductor
0.2
-
-
Installation/Testing/Commissioning of 16KN Polymer Shackle Insulator
6
-
-
Installation/Testing/Commissioning of Galvinized Nuts and Bolts.
4
-
-
Installation/Testing/Commissioning of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
4
-
-
Installation/Testing/Commissioning of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
28
-
-
HT/LT line (Dismentalling and Re-Erection Part)
-
-
-
9 Mtr. Long Pole( ST-410 SP33)
57
-
-
8 Mtr. Long Pole( ST-410 SP15)
28
-
-
Dismentalling and Re-Stringing of 30mmsq ACSR Conductor
11.4
-
-
Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
85
-
-
HT/LT line (Dismentalling and Write Back along with accessories)
-
-
-
9 Mtr. Long Pole( ST-410 SP33)
5
-
-
8 Mtr. Long Pole( ST-410 SP15)
40
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements