Power Development And Non Renewable Energy Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Power Development And Non Renewable Energy Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date14 Aug 2023
Closing Date29 Aug 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of 11 kV Horn Gap Fuse Set 3 Phase 200A

1

-

-

... More
Supply of 70 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 63 KVA DT

44

-

-

... More
Supply of 9 mtr long poles ST -410 SP -33

2

-

-

... More
Supply of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm

3

-

-

... More
Supply of GI Channel/Angle/Flat of sizes including clamps

300

-

-

... More
Supply of Galvinized Nuts and Bolts.

8

-

-

... More
Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.

3

-

-

... More
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm

3

-

-

... More
Supply of LT Distribution Box for 100 kVA DTR with MCCB for incommer and SFU's for outgoing circuit.

1

-

-

... More
Supply of Wedge Connectors / PG Clamps

6

-

-

... More
Supply of Danger Plates with Clamps

1

-

-

... More
Supply of GI Barbed Wire for Anti Climbing

15

-

-

... More
Supply of 3--phase ,4 wire trivector meter with CT(LTCT AMR Compatable)

1

-

-

... More
Supply of Cement bottoming 1:2:4 mix as per REC standards.5cum/pole

2

-

-

... More
Supply of Painting of Poles Red Oxide

2

-

-

... More
Supply of Painting of Poles Aluminium Paint

2

-

-

... More
Supply of Sundry items like aluminium lugs, Jumpers, binding Tape,

1

-

-

... More
Installation/Testing /Commissioning / of ( part)

-

-

-

... More
Installation/Testing /Commissioning / of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type

1

-

-

... More
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type

1

-

-

... More
Installation/Testing /Commissioning / of 11 kV Horn Gap Fuse Set 3 Phase 200A

1

-

-

... More
Installation/Testing /Commissioning / of 70 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 63 KVA DT

44

-

-

... More
Installation/Testing /Commissioning / of 9 mtr long poles ST -410 SP -33

2

-

-

... More
Installation/Testing /Commissioning / of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm

3

-

-

... More
Installation/Testing /Commissioning / of GI Channel/Angle/Flat of sizes including clamps

300

-

-

... More
Installation/Testing /Commissioning / of Galvinized Nuts and Bolts.

8

-

-

... More
Installation/Testing /Commissioning / of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.

3

-

-

... More
Installation/Testing /Commissioning / of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm

3

-

-

... More
Installation/Testing /Commissioning / of LT Distribution Box for 100 kVA DTR with MCCB for incommer and SFU's for outgoing circuit.

1

-

-

... More
Installation/Testing /Commissioning / of Wedge Connectors / PG Clamps

6

-

-

... More
Installation/Testing /Commissioning / of Danger Plates with Clamps

1

-

-

... More
Installation/Testing /Commissioning / of GI Barbed Wire for Anti Climbing

15

-

-

... More
Installation/Testing /Commissioning / of 3--phase ,4 wire trivector meter with CT(LTCT AMR Compatable)

1

-

-

... More
Installation/Testing /Commissioning / of Cement bottoming 1:2:4 mix as per REC standards.5cum/pole

2

-

-

... More
Installation/Testing /Commissioning / of Painting of Poles Red Oxide

2

-

-

... More
Installation/Testing /Commissioning / of Painting of Poles Aluminium Paint

2

-

-

... More
Installation/Testing /Commissioning / of Sundry items like aluminium lugs, Jumpers, binding Tape,

1

-

-

... More
LT Line Supply part)

-

-

-

... More
Supply of 8 Mtr. Long Pole( ST-410 SP15)

8

-

-

... More
Supply of GI Channel X ARM (75X40X6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4Kg, 1 No. clamp=0.83Kg = total weight = 4.83 kg)

14

-

-

... More
Supply of GI Channel X ARM (75X40X6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8Kg, 1 No. clamp=0.83Kg = total weight = 8.83 kg)

53

-

-

... More
Supply of 30mm² ACSR Conductor

0.1

-

-

... More
Supply of 16kN Polymer Shackle Insulators

30

-

-

... More
Supply of Galvinized Nuts and Bolts.

8

-

-

... More
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.

8

-

-

... More
Supply of Red Oxide

8

-

-

... More
Supply of Aluminium Paint

8

-

-

... More
Supply of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole

8

-

-

... More
LT Line Installation/Testing /Commissioning /( part)

-

-

-

... More
Installation/Testing /Commissioning / of 8 Mtr. Long Pole( ST-410 SP15)

8

-

-

... More
Installation/Testing /Commissioning / of GI Channel X ARM (75X40X6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4Kg, 1 No. clamp=0.83Kg = total weight = 4.83 kg)

14

-

-

... More
Installation/Testing /Commissioning / of GI Channel X ARM (75X40X6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8Kg, 1 No. clamp=0.83Kg = total weight = 8.83 kg)

53

-

-

... More
Installation/Testing /Commissioning / of 30mm² ACSR Conductor

0.1

-

-

... More
Installation/Testing /Commissioning / of 16kN Polymer Shackle Insulators

30

-

-

... More
Installation/Testing /Commissioning / of Galvinized Nuts and Bolts.

8

-

-

... More
Installation/Testing /Commissioning / of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.

8

-

-

... More
Installation/Testing /Commissioning / of Red Oxide

8

-

-

... More
Installation/Testing /Commissioning / of Aluminium Paint

8

-

-

... More
Installation/Testing /Commissioning / of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole

8

-

-

... More
Dismentalling Part

-

-

-

... More
Dismentalling Carraige and W/B of DW pole to Power House Tangtse

6

-

-

... More
Dismentalling and re-stringing of Existing overhead conductor

1.1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.