Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Power Development And Non Renewable Energy Tender

Works
Electrical and Electronics
Eprocure
Opening Date29 Aug 2024
Closing Date10 Sep 2024
Tender Amount₹ 54,51,211 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Supply, Installation, Erection, Testing And Commissioning Of Additional 11kv Vcb Panel And Cable Trench At 1x6.3mva 6611kv Substation Lungmar Leh.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rubber mats for control room building near 11 kv panels as per voltage rating requirement conforming to IS-15652 with latest amendments (complete running set)

1

-

-

... More
11KV , 3 Core 185sqmm, Al condcutor, XLPE insulated, PVC Sheathed, Armoured PVC Outer Sheath cable for 11KV outgoing panels to 11KV double pole with FRLS features

150

-

-

... More
11KV outdoor termination kits (3Cx185sqmm)

3

-

-

... More
11KV indoor termination kits (3Cx185sqmm)

3

-

-

... More
Trench Work

-

-

-

... More
Demolishing cement concrete manually/mechanical means including disposal of materials within 50 mtrs lead as per direction of engineer incharge 15 2.1 1:3:6 or richer mix ( i/c equivalent design mix)

1.37

-

-

... More
Demolishing brick work manually/by mechanical means including stacking of serviceable materials and disposal of unserviceable material within 50 mtrs lead as per direction of engineer incharge: in cement mortar

2.68

-

-

... More
EARTH WORK

-

-

-

... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for Foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:2.9.1 all kind of soil

52.05

-

-

... More
Earth work in excavation by manual means in trenches for foundation,drains, pipes, cable etc ( not exceeding 1.5M in width) and for shafts,wells,cesspits and the like not exceeding 10 sqm on ramming of bottoms lift upto 1.5m , including getting out excavated earth and disposal of surplus excavated earth as directed, all kind of soil.

1.49

-

-

... More
SOILING/PCC

-

-

-

... More
Soiling including cost of stone

4.5

-

-

... More
Providing and laying in position cement, cencreate of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:4:8 ( one cement : 3 coarse sand: 6 graded stone aggregate 20mm nominal size

3.38

-

-

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with. 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 40mm nominal size).

2.03

-

-

... More
RCC

-

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering/shuttering/finishing and reinforcement. All works upto plinth level 1:1 1/2:3 ( one cement: 1 1/2 coarse sand : 3 graded stone aggregate 20mm nominal size)

26.68

-

-

... More
Steel reinforcement for RCC work including straightening, cutting, bending,placing in position and binding all complete upto plinth level six thermo mechanically treated bars of grade 5000 or more @90kg/cum

2401.16

-

-

... More
CENTERING & SHUTTERING

-

-

-

... More
Centering and shuttering including strutting,propping etc and removal of form work for 4.6.1 foundation,footing,basis for columns

144

-

-

... More
Wall

-

-

-

... More
Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal size)

2.14

-

-

... More
WALL PLASTER - CEMENT PLASTER (IN FINE SAND) 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) Exterior/interior

11.92

-

-

... More
Finishing wall with water proofing cement paint of required shade on new work (two or more coats applied@3.84kg/10sqm)

5.95

-

-

... More
providing and applying plaster of paris putty of 2mm thichness over plastered surface to prepare the surface even and smooth complete

5.95

-

-

... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on new work (two or more coats) over and includeing priming coat with water thinnable cement primer

5.95

-

-

... More
Steel Section

-

-

-

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works : QTY.: chequered plate @ 56.148kg/sqm inside the control room, 40x40x5 along the periphery of the trench cover,wall mounted cable holder to be placed at one side or both side of the trench at 1m distance

1225.36

-

-

... More
Carriage of material by MT from source to site of work including loading, unloading complete job

-

-

-

... More
Cement and steel ....5km,sand....10km, stone aggregate,soiling

70.08

-

-

... More
L 40 X 40 X 5 along the periphery o f the trench cover

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.