Power Development And Non Renewable Energy Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 78,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PDNRE_10745_1Bid Award Id
ViewTender No
eNIT No. 59 of ED Leh Dated 17.08.2023Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply of GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
585
-
-
Supply of GI Channel X-arm including clamps,fish plate and braces for DP (80Kg/DP)
640
-
-
Supply of 30 mm² ACSR Conductor
8.2
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
120
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
48
-
-
Supply of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
10
-
-
Supply of Galvinized Nuts and Bolts
48
-
-
Supply of Danger Plates with Clamps
48
-
-
Supply of Anti-Climbing Device with Clamps
48
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
48
-
-
Supply of Red Oxide
48
-
-
Supply of Aluminium Paint
48
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
90
-
-
Supply of Aluminium Jointing Sleeves
48
-
-
11KV HT Line (Installation,testing and commissioning of part)
-
-
-
Installation,testing and commissioning of 9 Mtr. Long Pole,ST-410 SP33)
48
-
-
Installation,testing and commissioning of GI V cross-arm with top Bracket including clamp as per specification(14.631Kg/complete V-set)
585
-
-
Installation,testing and commissioning of GI Channel X-arm including clamps,fish plate and braces for DP (80Kg/DP)
640
-
-
Installation,testing and commissioning of 30 mm² ACSR Conductor
8.2
-
-
Installation,testing and commissioning of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
120
-
-
Installation,testing and commissioning of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
48
-
-
Installation,testing and commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
10
-
-
Installation,testing and commissioning of Galvinized Nuts and Bolts
48
-
-
Installation,testing and commissioning of Danger Plates with Clamps
48
-
-
Installation,testing and commissioning of Anti-Climbing Device with Clamps
48
-
-
Installation,testing and commissioning of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
48
-
-
Installation,testing and commissioning of Red Oxide
48
-
-
Installation,testing and commissioning of Aluminium Paint
48
-
-
Installation,testing and commissioning of Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole
90
-
-
Installation,testing and commissioning of Aluminium Jointing Sleeves
48
-
-
Substation Supply Part ( 25 KVA)
-
-
-
Supply of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
1
-
-
Supply of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
1
-
-
Supply of 11 kV Horn Gap Fuse Set 3 Phase 200A
1
-
-
Supply of 25 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type
44
-
-
Supply of 9 Mtr. Long Pole,ST-410 SP33)
2
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
3
-
-
Supply of GI Channel/Angle/Flat of sizes including clamps
250
-
-
Supply of Galvinized Nuts and Bolts.
8
-
-
Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
3
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
3
-
-
Supply of 32/63 amps TPN Switch Disconnector Fuse Unit
1
-
-
Supply of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
Supply of Wedge Connectors / PG Clamps
3
-
-
Supply of Danger Plates with Clamps
1
-
-
Supply of GI Barbed Wire for Anti Climbing
15
-
-
Supply of 3-Ø, 4-Wire Trivector Meter with CT
1
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards .5cum/pole
2
-
-
Supply of Painting of Poles Red Oxide
2
-
-
Supply of Painting of Poles Aluminium Paint
2
-
-
Supply of LT Distribution Box for 100kVA DTR with MCCB short circuit rating 16KA/Sec for incomer 160Amp and suitable MCCBs for Outgoing Circuits with terminal extension.
1
-
-
Substation (Installation,testing and commissioning part)
-
-
-
Installation,testing and commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
1
-
-
Installation,testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
1
-
-
Installation,testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
1
-
-
Installation,testing and commissioning of 25 mm² Single-Core Cable,1.1kV Grade, PVC Insulated Stranded Conductor FRLS type
44
-
-
Installation,testing and commissioning of 9 Mtr. Long Pole,ST-410 SP33)
2
-
-
Installation,testing and commissioning of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
3
-
-
Installation,testing and commissioning of GI Channel/Angle/Flat of sizes including clamps
250
-
-
Installation,testing and commissioning of Galvinized Nuts and Bolts.
8
-
-
Installation,testing and commissioning of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
3
-
-
Installation,testing and commissioning of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
3
-
-
Installation,testing and commissioning of 32/63 amps TPN Switch Disconnector Fuse Unit
1
-
-
Installation,testing and commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
2
-
-
Installation,testing and commissioning of Wedge Connectors / PG Clamps
3
-
-
Installation,testing and commissioning of Danger Plates with Clamps
1
-
-
Installation,testing and commissioning of GI Barbed Wire for Anti Climbing
15
-
-
Installation,testing and commissioning of 3-Ø, 4-Wire Trivector Meter with CT
1
-
-
Installation,testing and commissioning of Cement bottoming 1:2:4 mix as per REC standards .5cum/pole
2
-
-
Installation,testing and commissioning of Painting of Poles Red Oxide
2
-
-
Installation,testing and commissioning of Painting of Poles Aluminium Paint
2
-
-
Installation,testing and commissioning of LT Distribution Box for 100kVA DTR with MCCB short circuit rating 16KA/Sec for incomer 160Amp and suitable MCCBs for Outgoing Circuits with terminal extension.
1
-
-
Substation Supply Part ( 250 KVA )
-
-
-
Supply of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
1
-
-
Supply of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
1
-
-
Supply of 11 kV Horn Gap Fuse Set 3 Phase 200A
1
-
-
Supply of 185 mm² (2Ckt) Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 250KVA DTs
15
-
-
Supply of 9 Mtr. Long Pole,ST-410 SP33)
2
-
-
Supply of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative creepage distance 900mm
3
-
-
Supply of GI Channel/Angle/Flat of sizes including clamps
300
-
-
Supply of Galvinized Nuts and Bolts.
8
-
-
Supply of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
3
-
-
Supply of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
3
-
-
Supply of LT Distribution Box for 250kVA DTR with TPN MCCB short ckt rating 16 KA/sec for incomer 275Amp and suitable MCCBs for outgoing circuits with terminal extensions
1
-
-
Supply of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI
stranded wire complete
2
-
-
Supply of Wedge Connectors / PG Clamps
3
-
-
Supply of Danger Plates with Clamps
2
-
-
Supply of GI Barbed Wire for Anti Climbing
15
-
-
Supply of 3-Ø, 4-Wire Trivector Meter with CT(LTCT AMR compatible)
1
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards .5cum/pole
2
-
-
Supply of Painting of Poles Red Oxide
2
-
-
Supply of Painting of Poles Aluminium Paint
2
-
-
Substation (Installation,testing and commissioning )( 250 KVA )
-
-
-
(Installation,testing and commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
1
-
-
(Installation,testing and commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
1
-
-
(Installation,testing and commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
1
-
-
(Installation,testing and commissioning of 185 mm² (2Ckt) Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for 250KVA DTs
15
-
-
(Installation,testing and commissioning of 9 Mtr. Long Pole,ST-410 SP33)
2
-
-
(Installation,testing and commissioning of 33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170kV Positive and 180kV Negative creepage distance 900mm
3
-
-
(Installation,testing and commissioning of GI Channel/Angle/Flat of sizes including clamps
300
-
-
(Installation,testing and commissioning of Galvinized Nuts and Bolts.
8
-
-
(Installation,testing and commissioning of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
3
-
-
(Installation,testing and commissioning of 33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170kV Positive and 180kV Negative, creepage distance 900mm
3
-
-
(Installation,testing and commissioning of LT Distribution Box for 250kVA DTR with TPN MCCB short ckt rating 16 KA/sec for incomer 275Amp and suitable MCCBs for outgoing circuits with terminal extensions
1
-
-
(Installation,testing and commissioning of Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI
stranded wire complete
2
-
-
(Installation,testing and commissioning of Wedge Connectors / PG Clamps
3
-
-
(Installation,testing and commissioning of Danger Plates with Clamps
2
-
-
(Installation,testing and commissioning of GI Barbed Wire for Anti Climbing
15
-
-
(Installation,testing and commissioning of 3-Ø, 4-Wire Trivector Meter with CT(LTCT AMR compatible)
1
-
-
Cement bottoming 1:2:4 mix as per REC standards .5cum/pole
2
-
-
Painting of Poles Red Oxide
2
-
-
Painting of Poles Aluminium Paint
2
-
-
11KV HT Line
-
-
-
Supply of 8 Mtr. Long Pole( ST-410 SP15)
16
-
-
Supply of GI Channel X ARM (75X40X6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8Kg, 1 No. clamp=0.83Kg = total weight = 8.83 kg)
176
-
-
Supply of 30mm² ACSR Conductor
3
-
-
Supply of 16kN Polymer Shackle Insulators
64
-
-
Supply of Galvinized Nuts and Bolts.
16
-
-
Supply of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
16
-
-
Supply of Red Oxide
16
-
-
Supply of Aluminium Paint
16
-
-
Supply of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
16
-
-
11KV HT Line (Installation ,Testing,Commissioning Part)
-
-
-
Installation,testing and commissioning of 8 Mtr. Long Pole( ST-410 SP15)
16
-
-
Installation,testing and commissioning of GI Channel X ARM (75X40X6mm) 4ft along with GI Clamp, 50x8mm, (4ft=8Kg, 1 No. clamp=0.83Kg = total weight = 8.83 kg)
176
-
-
Installation,testing and commissioning of 30mm² ACSR Conductor
3
-
-
Installation,testing and commissioning of 16kN Polymer Shackle Insulators
64
-
-
Installation,testing and commissioning of Galvinized Nuts and Bolts.
16
-
-
Installation,testing and commissioning of Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
16
-
-
(Installation,testing and commissioning of Painting of Red Oxide
16
-
-
(Installation,testing and commissioning of Painting of Aluminium Paint
16
-
-
Installation,testing and commissioning of Cement bottoming 1:2:4 mix as per REC standards .45cum/pole
16
-
-
Dismantling, Shifting and Re-errection
-
-
-
Dismentalling of ST Pole 8mtr with allied material including conductor and carraige of same to divisional store at choglamsar leh
39
-
-
Dismentalling Shifitng and re-erection of existing 9 mtr by an average distance of ( 5-7 ) Mtr along with allied pole accessories ( except conductor & cement bottoming )
42
-
-
Dismentalling ,shifting and Re- stringing of existing overhead weasel conductor on the re-erected 9 Mtr ST poles situated at Avearge distance of 5.7 mtr
2
-
-
Dismentalling of the existing DT structure ,Carraige and W/B of the same to division store Leh ( 25 KVA )
1
-
-
Dismentalling of the existing DT structure ,Carraige and W/B of the same to division store Leh ( 250 KVA )
1
-
-