Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Power Development And Non Renewable Energy Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date9 Jul 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Supply Installation Testing And Commissioning For Creation Of 250kva Substation Along With Laying Of Ht Network At Sindhu Central University Temporary

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply Installation Testing and Commissioning for Creation of 250KVA substation along with laying of HT Network at Sindhu Central University Temporary Campus at Khaltsi Degree College on full turkey basis under Deposit Work 2024 25
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type

8

-

-

... More
11 kV Horn Gap Fuse Set 3 Phase 200A

8

-

-

... More
25 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for DTs

352

-

-

... More
9 Mtr. Long Pole,ST-410 SP33)

16

-

-

... More
33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

24

-

-

... More
GI Channel/Angle/Flat of sizes including clamps

2000

-

-

... More
Galvinized Nuts and Bolts.

64

-

-

... More
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.

24

-

-

... More
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

24

-

-

... More
32Amp TNPN Switch disconnector fuse unit

8

-

-

... More
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete

16

-

-

... More
Wedge Connectors/PG Clamps

48

-

-

... More
Danger Plates with Clamps

8

-

-

... More
GI Barbed Wire for Anti Climbing

120

-

-

... More
3-Ø,4-Wire Smart Energy Meter

8

-

-

... More
Cement bottoming 1:2:4 mix as per REC standards .5cum/pole

16

-

-

... More
Painting of Poles Red Oxide

16

-

-

... More
Painting of Poles Aluminium Paint

16

-

-

... More
Sundry items like aluminium lugs, Jumpers, binding Tape,

8

-

-

... More
Installation/Testing /Commissioning Part of Substation.

-

-

-

... More
25KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or higher kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate

8

-

-

... More
Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type

8

-

-

... More
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type

8

-

-

... More
11 kV Horn Gap Fuse Set 3 Phase 200A

8

-

-

... More
25 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for DTs

352

-

-

... More
9 Mtr. Long Pole,ST-410 SP33)

16

-

-

... More
33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

24

-

-

... More
GI Channel/Angle/Flat of sizes including clamps

2000

-

-

... More
Galvinized Nuts and Bolts.

64

-

-

... More
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.

24

-

-

... More
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

24

-

-

... More
32Amp TNPN Switch disconnector fuse unit

8

-

-

... More
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete

16

-

-

... More
Wedge Connectors/PG Clamps

48

-

-

... More
Danger Plates with Clamps

8

-

-

... More
GI Barbed Wire for Anti Climbing

120

-

-

... More
3-Ø,4-Wire Smart Energy Meter

8

-

-

... More
Cement bottoming 1:2:4 mix as per REC standards .5cum/pole

16

-

-

... More
Painting of Poles Red Oxide

16

-

-

... More
Painting of Poles Aluminium Paint

16

-

-

... More
Sundry items like aluminium lugs, Jumpers, binding Tape,

8

-

-

... More
HT Line Supply Part

-

-

-

... More
9 Mtr. Long Pole( ST-410 SP33)

35

-

-

... More
GI V cross-arm with top Bracket including clamp(14.631 kg)

642

-

-

... More
GI Channel X Arm including Clamps and Bracket for DP (80kg/DP)

160

-

-

... More
30 mm² ACSR Conductor

5.8

-

-

... More
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

130

-

-

... More
33kV Polymeric composite Disc Insulator 36kV, Min failing 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

24

-

-

... More
Galvinized Nuts and Bolts

35

-

-

... More
Danger Plates with Clamps

35

-

-

... More
Anti-Climbing Device with Clamps

35

-

-

... More
Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip.

35

-

-

... More
Red Oxide

35

-

-

... More
Aluminium Paint

35

-

-

... More
Cement bottoming 1:2:4 mix as per REC standards .45cum /pole

35

-

-

... More
Aluminium Jointing Sleeves

7

-

-

... More
HT Line Installation/Testing /Commissioning Part

-

-

-

... More
9 Mtr. Long Pole( ST-410 SP33)

35

-

-

... More
GI V cross-arm with top Bracket including clamp(14.631 kg)

642

-

-

... More
GI Channel X Arm including Clamps and Bracket for DP (80kg/DP)

160

-

-

... More
30 mm² ACSR Conductor

5.8

-

-

... More
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

130

-

-

... More
33kV Polymeric composite Disc Insulator 36kV, Min failing 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm

24

-

-

... More
Galvinized Nuts and Bolts

35

-

-

... More
Danger Plates with Clamps

35

-

-

... More
Anti-Climbing Device with Clamps

35

-

-

... More
Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip.

35

-

-

... More
Red Oxide

35

-

-

... More
Aluminium Paint

35

-

-

... More
Cement bottoming 1:2:4 mix as per REC standards .45cum /pole

35

-

-

... More
Aluminium Jointing Sleeves

7

-

-

... More
LT Line Supply Part

-

-

-

... More
8 Mtr. Long Pole( ST-410 SP15)

244

-

-

... More
GI Channel X ARM (75X40X6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4Kg, 1 No. clamp=0.83Kg = total weight = 4.83 kg)

1144

-

-

... More
50 sqmm LT Cable

1400

-

-

... More
Suspension Fitting

33

-

-

... More
Tension Fitting

33

-

-

... More
Straight through cable jointing ket

15

-

-

7

-

-

... More
Service Line 2 Core 35sqmm

270

-

-

75

-

-

... More
16kN Polymer Shackle Insulators

453

-

-

... More
30 mm² ACSR Conductor

21

-

-

... More
Galvinized Nuts and Bolts.

244

-

-

... More
Red Oxide

244

-

-

... More
Aluminium Paint

244

-

-

... More
Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.

244

-

-

... More
Cement bottoming 1:2:4 mix as per REC standards.45cum/pole

244

-

-

... More
Single Phase Energy Meter

24

-

-

... More
Service Line 2 Core 16sqmm

420

-

-

... More
Service Line 2 Core 10sqmm

60

-

-

... More
LT Line Installation/Testing /Commissioning Part

-

-

-

... More
8 Mtr. Long Pole( ST-410 SP15)

244

-

-

... More
GI Channel X ARM (75X40X6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4Kg, 1 No. clamp=0.83Kg = total weight = 4.83 kg)

1144

-

-

... More
50 sqmm LT Cable

1400

-

-

... More
Suspension Fitting

33

-

-

... More
Tension Fitting

33

-

-

... More
Straight through cable jointing ket

15

-

-

7

-

-

... More
Service Line 2 Core 35sqmm

270

-

-

75

-

-

... More
16kN Polymer Shackle Insulators

453

-

-

... More
30 mm² ACSR Conductor

21

-

-

... More
Galvinized Nuts and Bolts.

244

-

-

... More
Red Oxide

244

-

-

... More
Aluminium Paint

244

-

-

... More
Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.

244

-

-

... More
Cement bottoming 1:2:4 mix as per REC standards.45cum/pole

244

-

-

... More
Single Phase Energy Meter

24

-

-

... More
Service Line 2 Core 16sqmm

420

-

-

... More
Service Line 2 Core 10sqmm

60

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.