Power Development And Non Renewable Energy Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 43,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Supply Installation Testing And Commissioning For Creation Of 250kva Substation Along With Laying Of Ht Network At Sindhu Central University Temporary
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PDNRE_13340_1Tender No
e-NIT No. 18 of ED Leh of 2024-25 dated 09-07-2024Tender Authority
Power Development And Non Renewable Energy ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Supply Installation Testing and Commissioning for Creation of 250KVA substation along with laying of HT Network at Sindhu Central University Temporary Campus at Khaltsi Degree College on full turkey basis under Deposit Work 2024 25
BOQ Items
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,
Vertical Type
8
-
-
11 kV Horn Gap Fuse Set 3 Phase 200A
8
-
-
25 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for DTs
352
-
-
9 Mtr. Long Pole,ST-410 SP33)
16
-
-
33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm
24
-
-
GI Channel/Angle/Flat of sizes including clamps
2000
-
-
Galvinized Nuts and Bolts.
64
-
-
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
24
-
-
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative,
creepage distance 900mm
24
-
-
32Amp TNPN Switch disconnector fuse unit
8
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI
stranded wire complete
16
-
-
Wedge Connectors/PG Clamps
48
-
-
Danger Plates with Clamps
8
-
-
GI Barbed Wire for Anti Climbing
120
-
-
3-Ø,4-Wire Smart Energy Meter
8
-
-
Cement bottoming 1:2:4 mix as per REC standards
.5cum/pole
16
-
-
Painting of Poles Red Oxide
16
-
-
Painting of Poles Aluminium Paint
16
-
-
Sundry items like aluminium lugs, Jumpers,
binding Tape,
8
-
-
Installation/Testing /Commissioning Part of Substation.
-
-
-
25KVA, 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level- 2, (Aluminium wound upto 200kVA, Copper wound for 250kVA or higher kVA ratings) , and with LV Cable Box having detachable Aluminium Gland plate
8
-
-
Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
8
-
-
11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,
Vertical Type
8
-
-
11 kV Horn Gap Fuse Set 3 Phase 200A
8
-
-
25 mm² Cable, 1.1kV Grade, PVC Insulated Stranded Conductor FRLS type for DTs
352
-
-
9 Mtr. Long Pole,ST-410 SP33)
16
-
-
33kV Polymeric composite Disc Insulator 36kV,min failing load 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance 900mm
24
-
-
GI Channel/Angle/Flat of sizes including clamps
2000
-
-
Galvinized Nuts and Bolts.
64
-
-
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
24
-
-
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative,
creepage distance 900mm
24
-
-
32Amp TNPN Switch disconnector fuse unit
8
-
-
Galvanised Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI
stranded wire complete
16
-
-
Wedge Connectors/PG Clamps
48
-
-
Danger Plates with Clamps
8
-
-
GI Barbed Wire for Anti Climbing
120
-
-
3-Ø,4-Wire Smart Energy Meter
8
-
-
Cement bottoming 1:2:4 mix as per REC standards
.5cum/pole
16
-
-
Painting of Poles Red Oxide
16
-
-
Painting of Poles Aluminium Paint
16
-
-
Sundry items like aluminium lugs, Jumpers,
binding Tape,
8
-
-
HT Line Supply Part
-
-
-
9 Mtr. Long Pole( ST-410 SP33)
35
-
-
GI V cross-arm with top Bracket including clamp(14.631 kg)
642
-
-
GI Channel X Arm including Clamps and Bracket for DP (80kg/DP)
160
-
-
30 mm² ACSR Conductor
5.8
-
-
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance
900mm
130
-
-
33kV Polymeric composite Disc Insulator 36kV, Min failing 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance
900mm
24
-
-
Galvinized Nuts and Bolts
35
-
-
Danger Plates with Clamps
35
-
-
Anti-Climbing Device with Clamps
35
-
-
Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip.
35
-
-
Red Oxide
35
-
-
Aluminium Paint
35
-
-
Cement bottoming 1:2:4 mix as per REC standards .45cum /pole
35
-
-
Aluminium Jointing Sleeves
7
-
-
HT Line Installation/Testing /Commissioning Part
-
-
-
9 Mtr. Long Pole( ST-410 SP33)
35
-
-
GI V cross-arm with top Bracket including clamp(14.631 kg)
642
-
-
GI Channel X Arm including Clamps and Bracket for DP (80kg/DP)
160
-
-
30 mm² ACSR Conductor
5.8
-
-
33kV Polymeric composite Pin Insulator 36kV, 10kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance
900mm
130
-
-
33kV Polymeric composite Disc Insulator 36kV, Min failing 70kN, Lighting Impulse 170KN Positive and 180KN Negative, creepage distance
900mm
24
-
-
Galvinized Nuts and Bolts
35
-
-
Danger Plates with Clamps
35
-
-
Anti-Climbing Device with Clamps
35
-
-
Earthing Complete by GI Pipe 40 mm or GI Rod 20mm 2.5 mtr long through GI Strip.
35
-
-
Red Oxide
35
-
-
Aluminium Paint
35
-
-
Cement bottoming 1:2:4 mix as per REC standards .45cum /pole
35
-
-
Aluminium Jointing Sleeves
7
-
-
LT Line Supply Part
-
-
-
8 Mtr. Long Pole( ST-410 SP15)
244
-
-
GI Channel X ARM (75X40X6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4Kg, 1 No. clamp=0.83Kg = total weight = 4.83 kg)
1144
-
-
50 sqmm LT Cable
1400
-
-
Suspension Fitting
33
-
-
Tension Fitting
33
-
-
Straight through cable jointing ket
15
-
-
SMDB
7
-
-
Service Line 2 Core 35sqmm
270
-
-
IPC
75
-
-
16kN Polymer Shackle Insulators
453
-
-
30 mm² ACSR Conductor
21
-
-
Galvinized Nuts and Bolts.
244
-
-
Red Oxide
244
-
-
Aluminium Paint
244
-
-
Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
244
-
-
Cement bottoming 1:2:4 mix as per REC standards.45cum/pole
244
-
-
Single Phase Energy Meter
24
-
-
Service Line 2 Core 16sqmm
420
-
-
Service Line 2 Core 10sqmm
60
-
-
LT Line Installation/Testing /Commissioning Part
-
-
-
8 Mtr. Long Pole( ST-410 SP15)
244
-
-
GI Channel X ARM (75X40X6mm) 2ft along with GI Clamp, 50x8mm, (2ft=4Kg, 1 No. clamp=0.83Kg = total weight = 4.83 kg)
1144
-
-
50 sqmm LT Cable
1400
-
-
Suspension Fitting
33
-
-
Tension Fitting
33
-
-
Straight through cable jointing ket
15
-
-
SMDB
7
-
-
Service Line 2 Core 35sqmm
270
-
-
IPC
75
-
-
16kN Polymer Shackle Insulators
453
-
-
30 mm² ACSR Conductor
21
-
-
Galvinized Nuts and Bolts.
244
-
-
Red Oxide
244
-
-
Aluminium Paint
244
-
-
Earthing Complete by GI Spiral/Rod 20mm 2.5 mtr long through GI Strip.
244
-
-
Cement bottoming 1:2:4 mix as per REC standards.45cum/pole
244
-
-
Single Phase Energy Meter
24
-
-
Service Line 2 Core 16sqmm
420
-
-
Service Line 2 Core 10sqmm
60
-
-