Ladakh Autonomous Hill Development Council Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Ladakh Autonomous Hill Development Council - LAHDC Tender

Civil And Construction
Eprocure
Opening Date26 Jan 2021
Closing Date15 Feb 2021
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for the work Conservation of Insaa monastery at Nubra Preservation of rock art at alchi Model village
conservation of insaa monastery at Nubra
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of wooden twigs/Tallu/round batten from the ceiling which are rotten,damaged and cracked including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

21.32

-

-

... More
Carefully removal of rotten wooden round poles, cracked and dmaged from the roof very carefully including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

46.9

-

-

... More
Removal of weathered wooden beams,brackets,posts and wooden members of the windows, doors and balcony windows very carefully includig sorting out serviceable materials, cleaning , washing and stacking properly for reuse and disposal of unserviceable materials within a lead of 300m.

3.24

-

-

... More
Removal of rubble stone masonry wall which are bulged and out of plumb very carefully to avoid any damages to the adjoining structure including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

17.72

-

-

... More
Removing mortar from stones and cleaning stones (net quantity of stacks of cleaned materials will be measured) :

17.72

-

-

... More
Removal of dead plaster from the roof/floors very carefully to avoid any damage to adjoining structure includig sorting out serviceable materials, stacking , sewing/screening of earth and disposal of unserviceable materials within a lead of 300m.

12.88

-

-

... More
Dismantling of wooden twigs/Tallu/round batten from the ceiling which are rotten,damaged and cracked including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

64.39

-

-

... More
Carefully removal of rotten wooden round poles, cracked and dmaged from the roof very carefully including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

170.52

-

-

... More
Removal of weathered wooden beams,brackets,posts and wooden members of the windows, doors and balcony windows very carefully includig sorting out serviceable materials, cleaning , washing and stacking properly for reuse and disposal of unserviceable materials within a lead of 300m.

9.79

-

-

... More
Removal of rubble stone masonry wall which are bulged and out of plumb very carefully to avoid any damages to the adjoining structure including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

67.22

-

-

... More
Removing mortar from stones and cleaning stones (net quantity of stacks of cleaned materials will be measured) :

67.22

-

-

... More
Removal of dead plaster/mud from the roof/floors very carefully to avoid any damage to adjoining structure includig sorting out serviceable materials, stacking , sewing/screening of earth and disposal of unserviceable materials within a lead of 300m.

28.77

-

-

... More
Dismantling of wooden twigs/Tallu/round batten from the ceiling which are rotten,damaged and cracked including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

143.85

-

-

... More
Carefully removal of rotten wooden round poles, cracked and dmaged from the roof very carefully including sorting out serviceable materials and stacking it properly for reuse and disposal of unserviceable materials within a lead of 300m.

100.5

-

-

... More
Removal of weathered wooden beams,brackets,posts and wooden members of the windows, doors and balcony windows very carefully includig sorting out serviceable materials, cleaning , washing and stacking properly for reuse and disposal of unserviceable materials within a lead of 300m.

21.86

-

-

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil

40.92

-

-

... More
Providing coursed rubble stone masonry in mud mortar admixed with Markula in 1:3 on the base for the consolidation of foundation wall and stiching of cracks and out of plumb wall matching with original pattern.

28.3

-

-

... More
Providing plinth protection to the base of the wall and making plinth protection 50 mm thick cement concrete

19.41

-

-

... More
Providing coursed rubble stone masonry above plinth level in mud mortar admixed with Markula in 1:3 on the base for the consolidation of foundation wall and stiching of cracks and out of plumb wall matching with original pattern.

67.22

-

-

... More
Providing and resetting of wooden beams , bracket and vertical post,doors and window frame in Budloo wood using 60% wood from dismantled salvages and 40% new supply of wood to match with the original style as per local traditions

9.79

-

-

... More
Providing and laying of wooden round pole over beam and bracket for ceiling using 50% poplar poles from dismantling salvages and 50% with new supply of poles on place of the damaged, cracked and unserviceable poles to match with the original style and as per local traditions.

170.52

-

-

... More
Providing and laying willow twigs/wooden batten/ Tallus over poplar pole for laying of roof covered with Local Grass (Yakzes) 25mm thick compressed for laying of mud mortar and concrete to cover with roof as per local tradition matching with original using 20% of twigs from dismantled salvages.

64.39

-

-

... More
Providing and laying mud mortar 20cm thick admixed with Markula in the roof in the ratio 1:5 (1part Markula, 5 part good earth) for laying of roof over wooden batten/willow twigs/Tallu and local grass as per original using 50% earth from the dismantled salvages and 50% new supply

12.88

-

-

... More
Providing and laying 10cm thick mud concrete in 1:2:4 (1 part Markula:2 part Fine Clay:4 part Stone Aggregate) 12mm and below gauge over mud mortar for water tightening of roof as per original matching with original structure.

6.44

-

-

... More
Providing 40mm thick dressed stone flooring (Yamangs) over 20 mm (average) thick base of markalak and sand.

64.39

-

-

... More
Internal Finishing : Providing and laying 30mm thick mud plaster consisting of good earth, Markula, Sand and Bussa of 10mm in 3 successive coats followed by fine coat gobbery to finishing the plaster as per local tradition to match with the original pattern.

84.23

-

-

... More
Providing and resetting of wooden beams , bracket and vertical post,doors and window frame in Budloo wood using 70% wood from dismantled salvages and 30% new supply of wood to match with the original style as per local traditions

21.84

-

-

... More
Providing and laying of wooden round pole over beam and bracket for ceiling using 50% poplar poles from dismantling salvages and 50% with new supply of poles on place of the damaged, cracked and unserviceable poles to match with the original style and as per local traditions.

100.5

-

-

... More
Providing and laying willow twigs/wooden batten/ Tallus over poplar pole for laying of roof covered with Local Grass (Yakzes) 25mm thick compressed for laying of mud mortar and concrete to cover with roof as per local tradition matching with original using 20% of twigs from dismantled salvages.

143.68

-

-

... More
Providing and laying mud mortar 20cm thick admixed with Markula in the roof in the ratio 1:5 (1part Markula, 5 part good earth) for layoing of roof over wooden batten/willow twigs/Tallu and local grass as per original using 50% earth from the dismantled salvages and 50% new supply

28.74

-

-

... More
Providing and laying 10cm thick mud concrete in 1:2:4 (1 part Markula:2 part Fine Clay:4 part Stone Aggregate) 12mm and below gauge over mud mortar for water tightening of roof as per original matching with original structure.

14.37

-

-

... More
Providing coursed rubble stone masonry above plinth level in mud mortar admixed with Markula in 1:3 on the base for the consolidation of foundation wall and stiching of cracks and out of plumb wall matching with original pattern.

17.72

-

-

... More
Providing and resetting of wooden beams , bracket and vertical post,doors and window frame in Budloo wood using 70% wood from dismantled salvages and 30% new supply of wood to match with the original style as per local traditions

3.24

-

-

... More
Providing and laying of wooden round pole over beam and bracket for ceiling using 50% poplar poles from dismantling salvages and 50% with new supply of poles on place of the damaged, cracked and unserviceable poles to match with the original style and as per local traditions.

46.9

-

-

... More
Providing and laying willow twigs/wooden batten/ Tallus over poplar pole for laying of roof covered with Local Grass (Yakzes) 25mm thick compressed for laying of mud mortar and concrete to cover with roof as per local tradition matching with original using 20% of twigs from dismantled salvages.

21.32

-

-

... More
Providing and laying mud mortar 20cm thick admixed with Markula in the roof in the ratio 1:5 (1part Markula, 5 part good earth) for layoing of roof over wooden batten/willow twigs/Tallu and local grass as per original using 50% earth from the dismantled salvages and 50% new supply

4.26

-

-

... More
Providing and laying 10cm thick mud concrete in 1:2:4 (1 part Markula:2 part Fine Clay:4 part Stone Aggregate) 12mm and below gauge over mud mortar for water tightening of roof as per original matching with original structure.

2.13

-

-

... More
Providing 40mm thick dressed stone flooring (Yamangs) over 20 mm (average) thick base of markalak and sand.

21.32

-

-

... More
Internal Finishing : Providing and laying 30mm thick mud plaster consisting of good earth, Markula, Sand and Bussa of 10mm in 3 successive coats followed by fine coat gobbery to finishing the plaster as per local tradition to match with the original pattern.

39.01

-

-

... More
Providing coursed rubble stone masonry above plinth level in mud mortar admixed with Markula in 1:3 on the base for the consolidation of foundation wall and stiching of cracks and out of plumb wall matching with original pattern.

17.72

-

-

... More
Providing and resetting of wooden beams , bracket and vertical post,doors and window frame in Budloo wood using 100% new supply of wood to match with the original style as per local traditions

3.24

-

-

... More
Providing and laying of wooden round pole over beam and bracket for ceiling using 50% poplar poles from dismantling salvages and 50% with new supply of poles on place of the damaged, cracked and unserviceable poles to match with the original style and as per local traditions.

46.9

-

-

... More
Providing and laying willow twigs/wooden batten/ Tallus over poplar pole for laying of roof covered with Local Grass (Yakzes) 25mm thick compressed for laying of mud mortar and concrete to cover with roof as per local tradition matching with original using 20% of twigs from dismantled salvages.

21.32

-

-

... More
Providing and laying mud mortar 20cm thick admixed with Markula in the roof in the ratio 1:5 (1part Markula, 5 part good earth) for layoing of roof over wooden batten/willow twigs/Tallu and local grass as per original using 50% earth from the dismantled salvages and 50% new supply

4.26

-

-

... More
Providing and laying 10cm thick mud concrete in 1:2:4 (1 part Markula:2 part Fine Clay:4 part Stone Aggregate) 12mm and below gauge over mud mortar for water tightening of roof as per original matching with original structure.

2.13

-

-

... More
Providing 40mm thick dressed stone flooring (Yamangs) over 20 mm (average) thick base of markalak and sand.

21.32

-

-

... More
Internal Finishing : Providing and laying 30mm thick mud plaster consisting of good earth, Markula, Sand and Bussa of 10mm in 3 successive coats followed by fine coat gobbery to finishing the plaster as per local tradition to match with the original pattern.

39.01

-

-

... More
Providing Parapet wall partially decorated with twig pieces of height of 40cm and laying of chajja with slate stones 0.025m thick admixed with markula in mud mortar to maintain the originality.

34.56

-

-

... More
Providing and laying 30mm thick mud plaster consisting of good earth, Markula, Sand and Bussa of 10mm in 3 successive coats followed by fine coat gobbery to finishing the plaster as per local tradition to match with the original pattern.

554.53

-

-

... More
Providing Markalak wash (2 coats) on the exterior walls and inner circumabulatory passage

554.53

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.