Forest Ecology And Environment Department Tender

Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.

Forest Ecology And Environment Department Tender

Civil And Construction
Water Storage And Supply
Eprocure
Opening Date4 Oct 2022
Closing Date7 Oct 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Water Storage Tank At Frs Tsogstod Diskit Of Nubra Forest Range For The Year 2022-23.(completion Of Biodiversity Cum Conservatory Centre Sdp Ongoing Scheme) Size -1(16.00x12.00)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centering, shuttering and curing complete 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominalsize) Super structure 2x 16.0x1’-6”x 7’-6” =180.00cfts 2x 12.0x1’-6”x 7.’-6” =270.00cfts T =450.00cfts or 12.73cum

12.73

-

-

... More
Stone filling dry pitching complete work including cost of stone 1x 12’.00’’8’.00’x2’.0”=192.00cfts or 5.43

5.43

-

-

... More
Providing and laying DPC 50mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5mm nominal size) Nallah 1x12’.00”x8’.0”=96.00sfts or 8.91sqm

8.91

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5coarse sand : 3 graded stone aggregate 20 mm nominal size Lintel:-2x16’-0”x1’-6”x0’-9” = 36.00cfts 2x8-0”x1’-6”x0’-9” = 18.00 cfts T=54.00cfts R.C.C flooring and slab= 1x12’.00”x8’.00”x0.5”=39.36cfts 2x16’.00”x12’.00”x0.5”=78.72cfts G.T= 172.08 or 4.86 cum

4.86

-

-

... More
Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. 4.86 Qty.= @1.2Qtl./cum i,e 5.83 qtls or583.00

583

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form work for. RCCDPC 2x16’-0”x0’-9” = 24.00sqft 2x8-0”x0’-9” = 12.00 sqft Slab 1x 16’.00”x 12’.00”= 192.00sfts T= 228.00sqft or 21.18s qm

21.18

-

-

... More
15mm thick cement plaster on rough side of stone wall of mix 1:4(1 cement: 4 Fine sand) = inner wall 2x13’00”x7.6”=195.00 sfts -do- 2x9’00”x 7.6”= 135.00sfts Outer wall =2x 16’.00”x8’.6”=272.00sfts -do =2x 9’.00”x8’.6”=153.00 T= 1055.00sfts or 98.00sqm

98

-

-

... More
Carriage of materials from various sources to site of work by M.T including loading, unloading and stacking. a)Cement and stell bar ……………..120kms

3.66

-

-

... More
Carriage of materials from various sources to site of work by M.T including loading, unloading and stacking.Sand &Stone aggregate ……………………05kms

21.27

-

-

... More
Carriage of materials from various sources to site of work by M.T including loading, unloading and stacking. Stone………………………20kms

7.92

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.