Forest Ecology And Environment Department Tender
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 18,639Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_FEE_11043_1Bid Award Id
ViewTender No
E-Tender No. 36 of FDL 2023-24Tender Authority
Forest Ecology And Environment Department ViewPurchaser Address
-Website
http://tenders.ladakh.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing and laying DPC 50mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5mm nominal size) Nallah
1x26’-6”x20’0” = 53.000sqft or 49.25sqm
49.25
-
-
providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5coarse sand : 3 graded stone aggregate 20 mm nominal size
Lintel:-1x26’-6”x1’-6”x1’-0” = 39.75 1x20’-0”x1’-6”x1’-0” = 30.00 1x12’-0”x1’-6”x1’-0” = 18.00 1x6’-0”x1’-6”x1’-0” = 7.50 1x10’-0”x1’-6”x1’-0” = 15.00 1x14’-0”x1’-6”x1’-0” = 21.00 T=131.25cfts or 3.71cum
3.71
-
-
Reinforcement for R.C.C. works including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. Qty.= @1.2Qtl./cum i,e 3.71cum l=4.452qtl. = 534kgs
534
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for. 2x26’-6”x1’-0” = 53.00sqfts 2x20’-0”x1’-0” = 40.00sqfts 2x12’-0”x1’-0” = 24.00sqfts 2x6’-0”x1’-0” = 12.00sqfts 2x10’-0”x1’-0” = 20.00sqfts 2x14’-0”x1’-0” = 28.00sqfts Total = 177.00sft or16.44sqm
16.44
-
-
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position: Budloo wood. Door :- vertical member = 4x7’-6”x0’-3”x0’-4”=2.47cuft
Horizontal = 4x3’-0”x0’-3”x0’-4”= 0.99cuft window :- vertical = 6x5’-6”x0’-3”x0’-4” = 2.72cuft Horizontal=2x10’-6”x0’-3”x0’-4” = 1.73cuft vertical = 4x4x5’-6”x0’-3”x0’-4” =7.26cuft Horizontal=4x2x6’-6”x0’-3”x0’-4” = 4.29cuft Total =19.46cuft
19.46
-
-
Providing and fixing flat pressed 3 layer particle board medium density exterior grade (Grade I) or graded wood particle board IS : 3087 marked to frame, backing or studding with screws etc. complete (Frames, backing or studding to be paid separately) : 12 mm thick
Qty vide item no (6) part -i i.e., =3.90sqm @60% =2.34sqm
2.34
-
-
Providing and fixing panelledor and glazed shutters for doors, windows and clerestory windows including ISI marked black enameled M.S butt hinges with necessary screws excluding, paneling which will be paid for separately. Second class kail Doors:-2x 3’-0”x7’-0”= 42.00sft @90%= 37.8sft
windows:-1x 10’-0”x5’-6”= 55.00sft @40%= 22.00sft -do- 4x 6’-0”x5’-6”= 132.00sft @40%= 52.8sft
T=112.6sqfts or10.46 sqm
10.46
-
-
Providing wood work in frames for roof of the rooms, and other frames, wrought framed and fixed in position: Budloo wood. Ballies rafts :- horizontal 13x14’.00”xAvg.(1’.6”)girth=25.59cfts 9 x12’.00”x Avg.(1’.6”)girth = 15.18cft T=40.77cfts
40.77
-
-
Plank = 1x 20’-0”x14’-0”x0’-1.5” = 35.00cft 2x 14’-0”x11’-6”x0’-1.5”=19.25 cft Total =54.25cft
54.25
-
-
15mm thick cement plaster on rough side of stone wall of mix 1:4(1 cement: 4 Fine sand)
Inner:- 2x17’-0”x9’-0”=306.00sft 2x12’-0”x9’-0”=216.00sft 2x10’-0”x9’-0”=180.00sft 2x11’-0”x9’-0”=198.00sft
Outer:- 1x26’-6”x10’-0”=265.00 sft 1x 20’-0”x10’.00 = 200.00 sft 1x 6’-0”x10’.00 = 60.00 sft 1x 10-’-0”x10’.00 = 100.00sft 1x 14’-0”x10’.00 = 140.00 sfts Total=1665.00sft or 154.73sqm
154.73
-
-
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work.(2 or more coats)
Qty. vide item no.(7)=154.73sqm
154.73
-
-
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. Doors:-2x 3’-0”x7’-0”= 42.00sft----(A)
windows:-1x 10’-0”x5’-6”= 55.00sft -do- 4x 6’-0”x5’-6”= 132.00sft T=187sfts/2 =93.5sfts……(B) =(A+B)
42.00sfts+93.5sfts =135.5 or10.46 sqm Qty. vide item no.(6)=12.59sqm
12.59
-
-
Providing and laying 10cm thick (average) mud phaska. Room 1x20’-0”x13’-6”=270.00 sft Store 1x14’-0”x11’-6”=154.00 sft T= 424.00sqfts or 39.40sqm
39.4
-
-
a) Providing and fixing ISI marked oxidized M.S sliding bolts with nuts and screws etc.300x10mm = 2@ Rs 350/no
2
-
-
b) Providing and fixing bright finished Brass tower bolts (Brass type) with necessary Screw etc complete. 100x10mm= 14nos @Rs 150/no
14
-
-
Providing and fixing bright finished brass handles with necessary Screw etc complete.
125mm = 7nos @ Rs203.90/no
7
-
-
Providing and fixing paneled or paneling and glazed in paneled or glazed for shutter for door and window 25mm to 40mm thick windows:-1x 10’-0”x5’-6”= 55.00sft -do- 4x 6’-0”x5’-6”= 132.00sft T=187sqfts or17.37sqm @65% =11.29sqm
11.29
-
-
A) Lighting point including wiring for lighting points in 1.5sq.mm copper wire and 2.5sq.mm PVC insulated multi-strand copper wire for lighting sub-mains. 6 Amp one way switch, 2mmthick PVC conduit / channel with bends, junction boxes etc.. complete job
8 points
8
-
-
B) Heating point including wiring for heating points in 2.5sq.mm copper wire and 4.0sq.mm PVC insulated multi-strand copper wire for heating sub-mains, 16 Amp switch socket combined, , 2mmthick PVC conduit / channel with bends , junction boxes etc.. complete job3 Nos
3
-
-
Materials consumption:
Item Qty. Sand Stone agg. Cement 2 .56.30cum@0.018= 1.01cum @15kg/cum =844kgs
4.49.25sqm@.022=1.08cum @0.044=2.16cum @ 18kg/cum=886kgs
5. 3.71cum @.43=1.59cum @0.85=3.15cum @401kg/cum =1487kgs 7. 154.73sqm@0.073=11.29cum @6.54kg/sqm=1011kgs
Total= 14.97cum =5.31cum =4228kgs
4.23
-
-
Carriage of materials by M.T
a)cement and steel avg. (Lead 180kms (Qty.= 4.228 M.T b) Sand and stone agg. Avg.(Lead=5kmQty.= 20.28cum
20.28
-
-
c)stone avg. (Lead= 5km)Qty.= 70.17cum
70.17
-
-
d) Earth avg. (Lead = 5km)Qty.=6.00 cum
6
-
-