Border Roads Organisation Tender
... More
Bidassist is designed as a single destination for all government tenders from across the world in one place. If you require any information or detail about any e-tender the Ladakh government has posted, Bidassist helps a registered bidder to get the same.As BidAssist is a very user-friendly website it will help you find the specific Ladakh etender you're looking for. Read further to learn how to search and bid for etender Ladakh.
Costs
EMD
₹ 2,11,177Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Consultancy Services For Preparation Of Detailed Project Report And Pre-construction Activities For Construction Of Seven Tunnels Of 60 M Length Each At Three Different Locations, In The Union Territory Of Ladakh
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BRO_704233_1Tender No
CE(P)/VJK/EPC/03/2025-26Tender Authority
Border Roads Organisation ViewPurchaser Address
-Website
http://http://www.bro.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Vertical Boring in all types of soil strata (Including hard rock strata)
980
-
-
... More
Schedule A (Fixed Lumpsum Cost)
-
-
-
... More
Geophysical Investigation
-
-
-
... More
Senior Surveyor Engineer
2
-
-
... More
Office Manager
3
-
-
... More
Key Professionals
-
-
-
... More
Final Feasibility report
4
-
-
... More
Team leader
3
-
-
... More
Quantity Surveyor/ Documentation Officer
3
-
-
... More
Draft Detailed Design report & drawings etc
4
-
-
... More
Office Set up (fixed cost): includes office building rent (min area 100 sqm), operation & maintenance, cleaning, repairs, Office furniture and equipments for typing and printing, Office stationery items, Utilities and communication, Drafting supplies, Computers and their running costs, Domestic communication.
1
-
-
... More
Directional Coring Expert
2
-
-
... More
Draft environmental assessment report & RAP
4
-
-
... More
Final Detailed Project Report with Bill of Quantities, Cost estimates, Updated Drawings etc.
4
-
-
... More
Typist
3
-
-
... More
Topographical survey & Investigation (Fixed rate): All investigation/surveys including Material survey and investigation, Sub-grade investigation/ studies shall be carried out at each Tunnel Location.
7
-
-
... More
Sub-Professional Staff: To be assessed by Consultant as per requirement on site
1
-
-
... More
Reports and Documents submission by the consultant
-
-
-
... More
Draft EMP
4
-
-
... More
Transportation (Fixed costs): The vehicles hired by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc
2
-
-
... More
Final EMP
4
-
-
... More
Conducting Electrical Resistivity Tomography (ERT) Test at each Tunnel location inlcuding charges for equipment,manpower etc and interpretation of Test Data and submission of its reports complete in all respects.
460
-
-
... More
Other Professional
-
-
-
... More
Directional/Longitudinal Boring in all types of soils strata not exceeding 100m length at each Tunnel location (including hard rock strata)
700
-
-
... More
Final environmental assesment report & RAP
4
-
-
... More
Inception report and QAP
4
-
-
... More
Draft Feasibilty report
4
-
-
... More
Material Engineer
1
-
-
... More
Night Watchman
3
-
-
... More
Office Boy
3
-
-
... More
Schedule B (Item rate costs)
-
-
-
... More
Sub soil Investigation & Other works: Vertical/Directional core drilling in all types of soils/rock as per ground condition shall be carried out at each Tunnel site to arrive at realisitic underground strata details at the proposed Tunnel sites. The rate includes construction of access roads to reach core drilling site, transportation of all plants, equipments, manpower, drilling accessories, erection on site for coring, core drilling and sampling, soil drilling testing and rock coring, trail pit, hand auguring, reinstatement of boreholes, etc. including grouting in zones of weakness and carrying out core logging and its laboratory testing, etc.
-
-
-
... More
Environment and social impact screeing report
4
-
-
... More
Environmental Engineer
1
-
-
... More
Highway cum pavement Engineer
1
-
-
... More
Tunnel Design Expert
3
-
-
... More
Senior E&M Engineer
1
-
-
... More
Monthly Reports
20
-
-
... More
Final Bidding Documents
2
-
-
... More
Senior Geotechnical Expert
3
-
-
... More
Cost of supply and fixing Boundary Pillars: Providing/Casting of RCC pillars in M-15 grade concrete and fixing on ground complete in all respects as per IRC 25: 1967. Consultant Shall fix Three Survey Bench Marks with its co-ordinates details at each Tunnel Portal Location.
21
-
-
... More
Support Staff (Fixed Rates) for the period of services.
-
-
-
... More
Draft Bidding documents
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%