WAPCOS Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 1,00,000Document Cost
₹ 8,850Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WPCOS_780650_1Tender No
WAP/INFRA/KERALA/2024/CMGP/494Tender Authority
WAPCOS Limited ViewPurchaser Address
-Website
http://http://www.wapcos.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
od250762/2022_2023 : Supply, Installation, Testing and commissioning of Oxygen Manifolds - 2 banks x 4 cylinders with tail pipes, NRV, fixing chain etc. The installation must fully comply with the standard ISO 7396/HTM 02-01 Please check technical specifications for complete details.<br>
1
-
-
... More
Nitrous Oxide Supply System
-
-
-
... More
od250763/2022_2023 : Supply, Installation, Testing and commissioning of fully automatic control panel N2O with Nominal flow rate of 300 LPM suitable for 2x4 cylinder manifold . The installation must fully comply with the standard ISO7396-1 or Equivalent. Please check technical specifications for complete details
1
-
-
... More
od124139/2024_2025 : Supply, Installation, Testing and commissioning of Emergency Cylinder Manifold 2 bank x 2 cylinders with emergency N2O high flow regulator with gauges and safety valves and tail pipes, NRV, fixing chain etc. The installation must fully comply with the standard ISO 7396/HTM 02-01. Please check technical specifications for complete details.
1
-
-
... More
od124140/2024_2025 : Supply, Installation, Testing and commissioning of N2O Manifold - 2 banks x4cylinders with with tail pipes, NRV, fixing chain etc.
1
-
-
... More
Carbon dioxide Supply System
-
-
-
... More
od250767/2022_2023 : Supply, Installation, Testing and commissioning of Fully Automatic Main CO2 supply system with manifold : Supply, Installation, testing and commissioning of Fully automatic gas control panel with flow capacity of 200LPM .Manifold capacity - 2 x 2 cylinder capacity (As per technicalspecification Standard: ISO 7396 / HTM 02-01)<br>
1
-
-
... More
od250769/2022_2023 : Supply, Installation, Testing and commissioning of CO2 Manifold - 2 banks x 2 cylinders with with tail pipes, NRV, fixing chain etc.<br>
1
-
-
... More
Compressed Air Plant
-
-
-
... More
od250775/2022_2023 : Supply,Installation, testing and commissioning of Medical Air Plant consisting of 3 screw compressor compact super sound absorbing tower design and each compressors should have1000 LPM at 13 bar in free air delivery pattern.Twin vertical air receiver tank Capacity 1500 liters each, 2 Dryer and double filtration unit - 5-stage conditioning systems with filters and adsorption dryer and a pressure reducer station, electrical control panel. (Two set of medical air purification system as per the technical specification and air quality according to european pharmacopea.)Each compressor should have minimum FAD of 1000LPM (35CFM). Third party certification to be produced for medical grade air quality and compressor FAD capacity verification.
1
-
-
... More
Vacuum Plant
-
-
-
... More
od250780/2022_2023 : "<br>Supply, fixing, testing and commissioning of Medical grade Central Vacuum System Complete with Three rotary vane type Vacuum Pumps each having 2200 LPM at a pressure of 450mmHg. with motor , Filter, interconnecting pipes, NRV, auto switch gear assy,and common receiver 2 x 2000 liters (water capacity fabricated conforming to IS 2825 and material of construction should be IS 2062 plate).each vacuum pump should have FAA 2200 LPM at 450mmHg, <br>Dual Bacteria Filters shall have an efficiency at least 99.9999% in accordance withHTM 02-01 /ISO 7396. The system should supply with the electrical panel"<br>
1
-
-
... More
od250782/2022_2023 : Supply installation testing and commissioning of Electrical Control Panel for Air Compressor & Vacuum Pump complete with plant Room wiring<br>
1
-
-
... More
WAGD SYSTEM
-
-
-
... More
od250784/2022_2023 : Supply, Installation, Testing and commissioning of WAGD SYSTEM (meeting ISO 7396-2/HTM02-01)<br>Terminal Units
9
-
-
... More
od250785/2022_2023 : Supply installation testing and commissioning of AGSS Hose Asembly, as per technical specification .
30
-
-
... More
Supply, installation, testing and commissioning of Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity)
-
-
-
... More
od250786/2022_2023 : Supply, installation, testing and commissioning of Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity) <br>1 Gases (O2) and 1 Vac (DN 20) with NIST Connection
3
-
-
... More
od250797/2022_2023 : Supply, installation, testing and commissioning of Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity) <br>2 Gases (O2, Air) and 1 Vac (DN 20) with NIST Connection
12
-
-
... More
od250799/2022_2023 : Supply, installation, testing and commissioning of Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity) <br>3 Gases (O2, Air4,N2O) and 1 Vac (DN 20) with NIST Connection
1
-
-
... More
od250800/2022_2023 : Supply, installation, testing and commissioning of Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity) <br>4 Gases (O2, Air4,Air 7, N2O) and 1 Vac (DN 20) with NIST Connection
1
-
-
... More
od250803/2022_2023 : Supply, installation, testing and commissioning of Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity) <br>5 Gases (O2, Air4, Air 7,N2O, CO2) and 1 Vac with NIST Connection
5
-
-
... More
Isolation valves
-
-
-
... More
od250805/2022_2023 : Supply, installation, testing and commissioning of Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. Please check technical specifications for complete details. - Imported <br>DN 15 - 15x1<br>
36
-
-
... More
od250806/2022_2023 : Supply, installation, testing and commissioning of Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. Please check technical specifications for complete details. - Imported<br>DN 20 - 22x1
110
-
-
... More
od250807/2022_2023 : Supply, installation, testing and commissioning of Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. Please check technical specifications for complete details. - Imported <br>DN 25 - 28x1,5
44
-
-
... More
od250808/2022_2023 : Supply, installation, testing and commissioning of Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. Please check technical specifications for complete details. - Imported <br>DN 32 - 35x1,5
11
-
-
... More
od250810/2022_2023 : Supply, installation, testing and commissioning of Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. Please check technical specifications for complete details. - Imported <br>DN 42 - 54x1,5
8
-
-
... More
od250812/2022_2023 : Supply, installation, testing and commissioning of Ball valve with male screw threads and flat tightened solder unions, front ends with slots to incorporate o-ring, oil-free and degreased, for medical gases and vacuum, handle with safety device securing handle in operating position, marked acc. DIN EN 19. Please check technical specifications for complete details. - Imported <br>DN 80 - 76x1,5
1
-
-
... More
" Gas Outlet Points/ Terminal Unit (BS standard) : Supply,Installation, testing and commissioning of Gas outlet points for following Medical Gas as per specified in Tender schematic drawings "
-
-
-
... More
od250813/2022_2023 : Gas Outlet Points/ Terminal Unit (BS standard) : Supply,Installation, testing and commissioning of Gas outlet points for following Medical Gas as per specified in Tender schematic drawings <br>Oxygen (O2)
250
-
-
... More
od250814/2022_2023 : Gas Outlet Points/ Terminal Unit (BS standard) : Supply,Installation, testing and commissioning of Gas outlet points for following Medical Gas as per specified in Tender schematic drawings <br>Nitrous Oxide (N2O)
8
-
-
... More
od250816/2022_2023 : Gas Outlet Points/ Terminal Unit (BS standard) : Supply,Installation, testing and commissioning of Gas outlet points for following Medical Gas as per specified in Tender schematic drawings <br>Medical Air 400
100
-
-
... More
od250817/2022_2023 : Gas Outlet Points/ Terminal Unit (BS standard) : Supply,Installation, testing and commissioning of Gas outlet points for following Medical Gas as per specified in Tender schematic drawings <br>Surgical Air 700
25
-
-
... More
od250818/2022_2023 : Gas Outlet Points/ Terminal Unit (BS standard) : Supply,Installation, testing and commissioning of Gas outlet points for following Medical Gas as per specified in Tender schematic drawings <br>Vacuum (Vac)
250
-
-
... More
od250821/2022_2023 : Gas Outlet Points/ Terminal Unit (BS standard) : Supply,Installation, testing and commissioning of Gas outlet points for following Medical Gas as per specified in Tender schematic drawings <br>Carbon Dioxide (CO2) as per DIN standard
8
-
-
... More
Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.
-
-
-
... More
od250828/2022_2023 : Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.<br>O2
220
-
-
... More
od251090/2022_2023 : Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.<br>O2( Matching probe / adaptor shall be provided at one end suitable for Oxygen Gas Outlets and other end for ventillator)
30
-
-
... More
od252001/2022_2023 : Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.<br>Vacuum
250
-
-
... More
od252085/2022_2023 : Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.<br>MA4
100
-
-
... More
od252094/2022_2023 : Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.<br>N2O
9
-
-
... More
od252095/2022_2023 : Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.<br>SA7
25
-
-
... More
od252096/2022_2023 : Supply, installation of Matching Probe/adopter with one end suitable for Hose & other end suitable for terminal units which complies and fully meets with the latest standard.<br>Co2
8
-
-
... More
Bed head panels
-
-
-
... More
od250838/2022_2023 : Supply, installation, testing and commissioning of Horizontal Bed Head Panels of 3 feet long with provision for 3 nos electrical (power & data) & min 3 nos Gas outlets - as per technical specification for Post operative beds
10
-
-
... More
od250841/2022_2023 : Supply, installation, testing and commissioning of Horizontal Bed Head Panels of 4 feet long with provision for 3 nos electrical (power & data) & min 5 nos Gas outlets - as per technical specification for ICU beds
30
-
-
... More
od250849/2022_2023 : Supply, installation, testing and commissioning of Continous Bed head panel with provision for fixing Medical gas outlets, power sockets, nurse cal points etc. as per the design requirement.
200
-
-
... More
Medical Equipments
-
-
-
... More
od250850/2022_2023 : Supply, installation, testing and commissioning of Oxygen Flow meter with humidifier bottle 0-15 litres.. Matching probe / adaptor shall be provided at one end suitable for Oxygen Gas Outlets and other end for flow meter.
250
-
-
... More
od250851/2022_2023 : Suply installation testing and commissiong of Ward Vacuum Unit which consists of the following :- 1no. Suction Regulator and 1no. 1000ml polysulphone collection jar. Suction Regulator : Suction regulator should be supplied with a safety jar, including and antibacterial filter and an anti overflow safety device. Should have wide membrane continuous suction controller. It Should have vacuum levels : 0-1000mbar/hPa. Should have vacuum gauge fitted with a protective bumper device. Should have on/off knob allowing for the quick restoration of a readjusted vacuum level with one end suitable for vacuum gas outlets and other end for Vacuum Hose.
250
-
-
... More
od250904/2022_2023 : Supply installation, testing and commissioning of Theatre Suction Unit.It must consists of the following :- 1no. Suction Regulator and 2nos. 2000ml polysulphone collection jar and both to be mounted on a trolley. Suction Regulator : Suction regulator should be supplied with a safety jar, including and antibacterial filter and an anti overflow safety device. Should have wide membrane continuous suction controller. It Should have vacuum levels : 0-1000mbar/hPa. Should have vacuum gauge fitted with a protective bumper device. Should have on/off knob allowing for the quick restoration of a readjusted vacuum level. Theatre Suction Unit with 3200 ml jars as per specifications. Matching probe / adaptor shall be provided at one end suitable for Vacuum Gas outlets and other end for Vacuum Hose including trolley.<br>
10
-
-
... More
od250949/2022_2023 : Supply installation testing and commissioning of Medical gas hose assemblies shall comply with BS EN 739. Hoses shall be color coded throughout their length as specification: High pressure Hose antistatic duly colour coded for Oxygen , Nitrous Oxide, Medical Air and Vacuum as per technical specification .Certificate of Origin must be given.
250
-
-
... More
Master plant alarm - Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity)
-
-
-
... More
od250914/2022_2023 : Supply, installation, testing and commissioning of Master plant alarm<br>Master plant alarm - Integrated area alarm with Valve Box (Including valves) and gauge (should comply EN ISO 7396 and BMS compatiblity)
1
-
-
... More
od124159/2024_2025 : Supply, Installation, Testing and Commissioning of Surgeon's Pendant - 1750mm Double Arm along with high pressure flexible hoses and necessary NIST adapters. (Provision for 10 electrical + 4 data + 3 Shelf + Provision for Gas outlets with terminal units)
4
-
-
... More
od124160/2024_2025 : Supply, Installation, Testing and Commissioning of Anaesthesia Pendant - 1000mm Single Arm along with high pressure flexible hoses and necessary NIST adapters. (Provision for 10 electrical + 4 data + 1 Shelf + 1 IV pole + Provision for Gas outlets with terminal units)
5
-
-
... More
Copper Piping As per EN13348 standards.
-
-
-
... More
od250925/2022_2023 : "Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>12mm OD x 1mm thick copper pipe
700
-
-
... More
od250929/2022_2023 : Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>15mm OD x 1mm thick copper pipe
1800
-
-
... More
od250931/2022_2023 : Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>22mm OD x 0.9mm thick copper pipe
980
-
-
... More
od250934/2022_2023 : Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>28mm OD x 0.9mm thick copper pipe <br>
396
-
-
... More
od250935/2022_2023 : Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>35mm OD x 1.2mm thick copper pipe
250
-
-
... More
od250936/2022_2023 : Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>42mm OD x 1.2mm thick copper pipe
150
-
-
... More
od250937/2022_2023 : Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>54mm OD x 1.2mm thick copper pipe
50
-
-
... More
od250938/2022_2023 : Supply,Installation testing and commissiong of Medical Grade LLOYD certified Copper Pipes : Copper pipes manufactured from phosphorous de-oxidised non-arsenical copper to BS EN 1412:1996 grade and having mechanical properties in accordance with BS EN 13348:2008 in either R250 (half hard) or R290 (hard). Degreasing of pipe shall be such that there is less than 20mg/m2 (0.002mg/cm2) of hydrocarbons on the degreased surface when tested by the method specified BS EN 13348:2008<br>76mm OD x 1.5mm thick copper pipe
50
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements