Travancore Titanium Products Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Travancore Titanium Products Limited - TTPL Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date1 Jul 2022
Closing Date4 Aug 2022
Tender Amount₹ 23,12,281
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_TTPL_496270_1Bid Award Id
ViewTender No
PROJ/NP-Civil Works/2022-23Tender Authority
Travancore Titanium Products Limited ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete up to plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more
4587.13
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
69.96
-
-
Drain System (Total approximate drain length 30m)
-
-
-
Demolishing R.C.C work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meter lead as per the direction of Engineer – in charge
2
-
-
Clearing the site by removing grass, debris, sludge etc. and conveying it to dump yard complete as per the direction of Engineer in charge (Lump sum Amount should be quoted)
1
-
-
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All kinds of soil
34.16
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
3.8
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
19.8
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
95.7
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse
sand :3 graded stone aggregate 20mm nominal size
14.36
-
-
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
74.25
-
-
Cleaning the surface thoroughly melting and applying corromastic so as to provide a continuous lining and heating the joints with blow lamps before applying corromastic to next section so as to form a monolithic joint and finishing the surface to the required line and level including applying SPL solution etc as in the standard practice in the company and as per the direction of the engineer in charge (inclusive of all materials).
70
-
-
Supply and laying AR tile with swk powder and K solution in the existing practice of the company including the charges for paving tiles to line and level, cleaning all surface etc. complete as per the direction of engineer in charge
70
-
-
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
1564.73
-
-
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in positioN using structural steel etc. as required.brIn gratings, frames, guard bar, ladder, railings, brackets, gates and similar works etc complete as per the direction of the Engineer in charge
2806.98
-
-
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
80
-
-