Travancore Titanium Products Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Travancore Titanium Products Limited - TTPL Tender
Eprocure
Opening Date11 Dec 2020
Closing Date24 Dec 2020
Tender AmountRefer Documents
Costs
EMD
₹ 50,000Document Cost
₹ 2,950Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_TTPL_400649_1Bid Award Id
ViewTender No
TTP/CD/CN/SR-35/Repairing Ilmenite Godown/C/20-21Tender Authority
Travancore Titanium Products Limited ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Steel work using steel structurals such as column, beam, staircase, purlin, trusses, bracing, bracket etc of
the building at various levels including charges for fabricating members to size, conveying it to the site,
lifting and fitting in position either by welding or by bolting, painting with iron primer after cleaning the
surface thoroughly, cost of welding rods, cutting gas , hire of tools and charges for scaffolding etc
complete as per the direction of the Engineer in charge
35000
-
-
... More
Labour charges for cleaning the surface thoroughly by chiselling, scrapping, wire brushing, sand papering
and providing protective covering over the equipments, vessels and TiO2 bags etc to prevent rust and
dust falling inside including charges for all tools, scaffolding etc. complete as per the direction of the
Engineer in charge
2000
-
-
... More
Labour charges for painting with zinc chromate primer over steel structurals such as columns, beams,
roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines,
cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and
equipment supports etc after cleaning the surface complete as per the direction of the Engineer in
charge.
2000
-
-
... More
Labour charges for painting with rubber based paint (lighty grey) over steel structurals such as columns,
beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways,
pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys
and equipment supports including charges for all tools, scaffolding etc complete as per the direction of
the Engineer in charge.
3500
-
-
... More
Labour charges for painting with rubber based paint (dark grey) over steel structurals such as columns,
beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways,
pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys
and equipment supports including charges for all tools, scaffolding etc complete as per the direction of
the Engineer in charge.
3500
-
-
... More
Labour charges for dismantling & removing the AC roofing sheet and stacking the material for structural
repair work without causing any damage to the sheet and refixing the same or new sheets after repairing
works including cost of all labours ,hire of tools, charges for scaffloding etc. complete as per the direction
of officer in charge
800
-
-
... More
Labour charges for dismantling & removing the AC roofing sheet without causing any damage to the
nearby sheet and structurals upto a height of 25m including cost of all labours ,hire of tools, dumping the
waste to dumpyard, charges for scaffloding etc. complete as per the direction of officer in charge.
2500
-
-
... More
Labour charges for dismantling carefully the damaged apron sheet, barge board, ridges etc. without
causing any damage to the nearby sheet and structurals up to a height of 25m including cost of all labour,
hire of tools, charges for scaffolding, dumping the waste to dumpyard etc. complete as per the direction
of the Engineer in charge.
50
-
-
... More
Providing non- asbestos high impact Polypropylene reinforced cement 6 mm thick corrugated sheets (as
per IS: 14871) roofing up to any pitch and fixing with polymer coated J or L hooks, bolts and nuts, 8 mm
dia G.I. plain and bitumen washers or with self drilling fastener and EPDM washers etc. complete
(excluding the cost of purlins, rafter and trusses), including cutting sheets to size and shape wherever
required.
2500
-
-
... More
Providing and fixing ridges and hips in non-asbestos fibre cement high impact polypropylene reinforced
roofing with suitable fixing accessories or self drilling fastener and EPDM washer etc.
complete.Corrugated serrated adjustable ridges
75
-
-
... More
Providing and fixing non- asbestos fibre cement high impact polypropylene reinforced roofing accessories
in all colours with polymer coated J or L hooks, bolts and nuts and or G.I. seam bolts and nuts, G.I. plain
and bitumen washers or with self drilling fastener and EPDM washer etc. complete:Barge boards
50
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements