Travancore Titanium Products Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Travancore Titanium Products Limited - TTPL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date30 Sep 2022
Closing Date18 Oct 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour charge for proving temporary brackets and supports using old dismantled MS section or new section while replacing heavy structural including selecting, cutting , conveying, fabricating and fitting brackets and supports whenever necessary, dismantling and removing the same after completion of work etc complete as per the direction of Engineer in Charge.

10000

-

-

... More
Labour charges for repairing/modifying/strengthening and replacing the damaged steel structurals such as column, beam, staircase, purlin, trusses, bracing, bracket etc of the building at various levels up to height of 25.3m including charges for fabricating members to size, conveying it to the site, lifting and fitting in position either by welding or by bolting, painting with iron primer after cleaning the surface thoroughly, including cost of welding rods, cutting gas , hire of tools and charges for scaffolding, conveying MS materials from store and debris to the dump yard etc complete as per the direction of the Engineer in charge

40000

-

-

... More
Labour charges for fabricating and fixing the tubular purlin/trusses on the roof with 50mm dia or nearest available size of MS pipe by welding or by bolting, painting with zinc chromate primer after cleaning the surface thoroughly by scrapping wire brushing chiseling including charges for welding, fabricating necessary cleats using MS plate/MS flat at the end of the purlin, cost of cutting gas ,welding rod, hire of tools and charges for scaffolding etc. complete as per the direction of the Engineer in charge

7000

-

-

... More
Labour charges for dismantling & removing the AC roofing sheet and stacking the material for structural repair work without causing any damage to the sheet and refixing the same or new sheets after repairing works including cost of all labours ,hire of tools, charges for scaffloding etc. complete as per the direction of officer in charge

3000

-

-

... More
Labor charges for fixing Non asbestos cement sheet/FRP Sheet on roof and side cladding with GI bolts and nuts, grease washer, rubber cap, roofing compound etc. up to a height of 25m including cost of all labors ,hire of tools, conveying, cutting the sheet into suitable size if necessary, charges for scaffolding etc. complete as per the direction of officer in charge.

2000

-

-

... More
Labour charge for fabrication and erection of staircase steps, platforms, walkways etc with MS chequered plate or MS plate of any thickness including cutting new plate to required size and shape, fixing in position either by welding (full run) or by bolting painting the with zinc chromate primer one coat after cleaning the surface thoroughly by scrapping, wire brushing, chiseling etc. complete as per the direction of the Engineer in charge.

10000

-

-

... More
Labour charges for fabrication and erectio of hand rails in various floors at different levels with 25 mm dia or its nearest size MS pipes and painting one coat zinc chromate primer after cleaning the surface thoroughly by chiseling, scrapping, wire brushing etc including charges for scaffolding, cost of cutting gas and welding rod, hire of tools etc. complete as per the direction of the Engineer in charge.

1000

-

-

... More
Labour charges for repairing the AC valley gutters without causing any damage to the nearby AC sheeting including dismantling and replacing the damaged gutters, drilling holes if necessary, charges for replacing the corroded MS clamps with new MS clamps painted the same with 3 coats if required, water proofing the leaking portions of the roof gutters using tar-felt sheet 2 layers with each layer bonded in bitumen applying at the top and bottom surface of tar-felt sheet or FRP coating, charges for removing leak and re-fixing AC sheet wherever necessary , fixing the AC gutter properly to the required line of slope, dismantling the AC sheets of both sides of the gutters if required and re-fixing the same after completion of work etc complete as per the direction of officer- in charge.

300

-

-

... More
Labour charges for painting with rubber based paint (lighty grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge.

1200

-

-

... More
Labour charges for painting with rubber based paint (dark grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge.

1200

-

-

... More
Labour charges for dismantling the wooden floor for repairing the steel structurals including charges for refixing the same properly after completion of the repair work including cost of all labours, hire of tools, charges for scaffolding, all other connected works etc. complete as per the direction of the Engineer in charge.

200

-

-

... More
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix

3

-

-

... More
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.

3

-

-

... More
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar

3

-

-

... More
Demolishing AR brick/tile including its mortar and thin layer of corromastic manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.

3

-

-

... More
Disposal of building rubbish/ malba/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved

15

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)

3

-

-

... More
Providig ad Laying cemet concrete in retaining walls, return walls (any thickess) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:11/2:3 (1 cement : 11/2 coarse sand :3 graded stone aggregate 20 mm nominal size)

3

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

3

-

-

... More
Centering and shuttering including strutting, etc. and removal of form for concrete

100

-

-

... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more

200

-

-

... More
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more

200

-

-

... More
Labor charges for Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x15 cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete as per the direction of the Engineer in charge

3

-

-

... More
Labor charges for solid block masonry using pre cast solid blocks (factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for super structure up to floor two level with thickness 20 cm and above in: CM 1:6 (1 cement : 6 coarse sand) etc complete as per the direction of the Engineer in charge

3

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.