Travancore Devaswom Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Travancore Devaswom Board Tender
Civil And Construction
Eprocure
Opening Date4 Nov 2024
Closing Date7 Nov 2024
Tender Amount₹ 4,88,233
Costs
EMD
₹ 12,250Document Cost
₹ 1,160Tender Fee
Refer Documents
Summary
Pampa Devaswom In Sabarimala Group Mnm Festival In 1200me Providing Temporary Illumination To The Temple Structures Premises Bookstall Guest House And Maramath Office Complex Etc And Light Arrangement On Hire Basis To The Temporary Shelters Etc
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TDB_702025_1Bid Award Id
ViewTender No
TDB/EEE/ET-173/2024-25Tender Authority
Travancore Devaswom Board ViewPurchaser Address
-Website
http://http://travancoredevaswomboard.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Hire and labour charges for providing 20mm PVC pipe with accessories for 1st day i.e., as on 15.11.2024
180
2
378
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
11700
-
1170
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper wire clipped with No.12 SWG GI wire and giving connection for 1st day i.e., on 15.11.2024
540
1
540
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
35100
-
3510
Hire and labour charges for providing 4x7/20 SWG PVC insulated copper wire clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 15.11.2024
270
3
972
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
17550
-
7020
Hire and labour charges for providing 3 phase 4 way MCB DB with 40 A, 4 pole ELCB and 40A 4 Pole isolator and giving connection for 1st day i.e., on 15.11.2024
4
129
516
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
260
20
5200
Appendix B: Providing light arrangements to the temporary installed shelters and counters for police force, fire force, medical aid Centre’s, medicated drinking water, bio toilets and sewage pumping units along the path in between Pampa and Marakoottam, Resting pandal, KSRTC waiting sheds, Ladies dress changing Sheds in and around at Pampa. Hire and labour charges for providing wiring light / fan points inside the pandal using 1Sq.m PVC insulated copper wire through 20mm dia PVC conduit and accessories and ceiling rose for 1st day i.e., as on 15.11.2024
216
30
6588
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
14040
3
43524
Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch on suitable size M.S. box with hylam sheet front cover for 1st day i.e., on 15.11.2024
90
9
828
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
5850
-
2925
Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size M.S. box with hylam sheet front cover for 1st day i.e., on 16.11.2023
27
13
364.5
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
1755
-
1579.5
Hire and labour charges for providing 1x40W patties type fluorescent fitting with all accessories and tubes for 1st day i.e., on 15.11.2024
210
15
3150
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
13650
1
25935
Hire and labour charges for providing 1200/1400mm ceiling fan and giving connection for 1st day i.e., on 15.11.2024
72
22
1652.4
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
4680
5
23400
Hire and labour charges for providing Air circulator pedestal fan in position and giving connection from the existing plug points for 1st day i.e., on 15.11.2024
9
149
1341
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
585
30
17550
Hire and labour charges for providing 20mm PVC pipe with accessories for 1st day i.e., on 15.11.2024
1080
2
2268
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
70200
-
7020
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper wire clipped with No.12 SWG GI wire and giving connection for 1st day i.e., on 15.11.2024
900
1
900
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
58500
-
5850
Hire and labour charges for providing 2x7/20 SWG PVC insulated copper wire clipped with No.12 SWG GI wire and giving connection for 1st day i.e., on 15.11.2024
360
1
648
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
23400
-
4680
Hire and labour charges for providing 3 phase 4-way MCB DB with 40 A, 4 pole ELCB and 40A 4 Pole isolator and giving connection for 1st day i.e., on 15.11.2024
45
129
5805
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
2925
20
58500
Hire and labour charges for providing ordinary type meter board consists of 3 Nos. 100/63A HRC cut out with fuse links and 1 No. 100/63A 2-way neutral link for 1st day i.e., as on 15.11.2024
45
117
5265
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
2925
16
46800
Hire and labour charges for providing ordinary pipe earthing as required on 1st day i.e. on 15.11.2024
45
155
6975
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
2925
1
5265
Hire and labour charges for providing drawing No.8 SWG bare copper conductor and giving connection for 1st day i.e., as on 15.11.2024
225
2
607.5
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
14625
-
3656.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements