Travancore Devaswom Board Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Travancore Devaswom Board - TDB Tender
Spares and Components
Eprocure
Opening Date11 Sep 2020
Closing Date18 Sep 2020
Tender Amount₹ 31,66,290
Costs
EMD
₹ 50,000Document Cost
₹ 2,975Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_TDB_384384_1Bid Award Id
ViewTender No
SDP/EE/ET-80/20-21Tender Authority
Travancore Devaswom Board ViewPurchaser Address
-Website
http://http://travancoredevaswomboard.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Maintenance, repairing and complete overhauling of secondary chamber. (2 set) Cleaning the refractory lined furnace walls, arch, Patch work to the refractory lining and insulation layer using fire create cement ,bricks etc , making good the refractory lined charging door and ash doors using castables, and ceramic wool. The rate also includes complete painting (2 coats) of primary chamber out surface using heat resistant aluminium paint. The rates inclusive of all taxes, charges for tools and tackles, consumables and transportation charges.
2
-
-
... More
Dismantling of horizontal refractory lined duct connecting the secondary chamber with ventury scrubber , removing the defective refractory layer form the duct, cleaning and re casting the duct using refractory cement (grade whytete/K). the work also includes providing necessary ‘Y’ type jagers inside the surface for strengthening the refractory lining. The rate inclusive of all taxes cost of consumables , all tools , tackles , like tri-pole for lifting the duct.
2
-
-
... More
Complete dismantling of mono -bloc burner assembly in primary and secondary chamber for the incinerators, cleaning of electrodes, solenoid valves, blower fans, transformer, burner rod, nozzle, photocell, sight glass, diffuser plate, cone etc., Reassembling and tuning of burner assembly for proper combustion of system. The rate inclusive of all taxes
2
-
-
... More
Labour charges for cleaning of fuel day tank, fuel lines, fuel filter , Rectification of leakages to the fuel line, valves, fuel pump, Replacement of gland packing, gaskets, oil seal for both the incinerators . The rate is inclusive of all taxes etc
2
-
-
... More
Labour charges for checking and necessary repairs of control panel board and related parts of Incinerator ensuring perfect and trouble free operation of all switches, contactors, OLR, MCBs, fuses, sequence controller, temperature controller, RTD, thermocouple, motors, photocell, visual and alarm monitors, limit switches, indication lamps, etc. and cleaning of all terminals using Carbon tetra chloride, painting of panel board.
2
-
-
... More
Dismantling overhauling cleaning and minor repair works to the ID fan assembly. The work includes reassembling the blower unit, motor, shaft, impeller, bearing block, in proper alignment and carrying out necessary cleaning and surface finishing for the outer casing, necesssary patch work to the casing and repainting using heat resistant hammer tone paint and labour charges for replacing of bearings, greasing of bearing, and dyanamic balancing of impeller .The rate inclusive of all taxes transportation and cost of consumables.
2
-
-
... More
Design , supply, fabrication of MS duct for replacing the defective duct portion between ID fan and chimney and emergency stack from ventury scrubber - duct having 400 mm dia , 4mm thick , with mitter bend flanges, drain point , etc coated with 2 coats of aluminum paint . The rate is inclusive of dismantling of existing duct , transportation charges etc
18
-
-
... More
Re winding of burn out 5 HP motor for the water pump connected to the scrubbing system for incinerator . The work includes re winding of faulty motor including dismantling the motor from the unit, , to & fro tractor charges to Pampa, To & fro transportation charges up to workshop at Ernakulam, replacing the motor bearings, terminal box etc and re fixing the motor
2
-
-
... More
APPENDIX B - Spare parts Thermocouple K Type (For primary chamber)
2
-
-
... More
Thermocouple KER 710 (For secondary chamber)
2
-
-
... More
Nozzle
4
-
-
... More
V Belt B-97
6
-
-
... More
RTD assembly for ventury outlet
2
-
-
... More
Electrode Assembly
4
-
-
... More
Hose Metallic Braided 3/8 x 40
6
-
-
... More
Digital Temperature Controller 0-1200degC
4
-
-
... More
Fuel Filter 0.5Ltr
4
-
-
... More
Contactor 32 A,230 V coil
2
-
-
... More
Contactor 18 A.230 V coil
2
-
-
... More
Overload Relay 14-23A
2
-
-
... More
Timer for star delta starter
2
-
-
... More
Overload Relay 1.4-2.3A
2
-
-
... More
CI Y Strainer 80 NB
2
-
-
... More
CI Ball valve 80 NB
2
-
-
... More
CI Ball valve 25 NB
4
-
-
... More
Roller bearing 1312 K
4
-
-
... More
Sleeve H312
4
-
-
... More
Combinstating cable for Thermocouple
4
-
-
... More
Blower fan for monobock burner
4
-
-
... More
Coupling L075
4
-
-
... More
Thermax make mono block burner assembly includes 1 No fuel pump, 0.5 Hp Motor etc
1
-
-
... More
APPENDIX C - Labour Charges Engaging overall BANDHANI for 75 days. (1 No. /shift for 3 shifts/day)
(3*75=225 Nos.)
225
-
-
... More
Engaging MAN MAZDOOR for loading of garbages into the incinerator for 75 days.(2 Nos. of machines)
(3 Nos./shift for 3 shifts/day /machine)
1350
-
-
... More
Engaging MAN MAZDOOR to segregate bio-degradable waste and plastic materials from the garbages for 75 days.
(5 Nos./shift for 3 shifts/day)
(5*3*75)=1125 Nos.)
)
1125
-
-
... More
Yellow mask
45
-
-
... More
MattyMask
35
-
-
... More
Rubber Gloves 14"
30
-
-
... More
Rubber Gloves 18"
20
-
-
... More
Cloth Mask
250
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements