Travancore Devaswom Board Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Travancore Devaswom Board Tender

Works
Civil And Construction
Eprocure
Opening Date20 Oct 2023
Closing Date24 Oct 2023
Tender Amount₹ 5,99,318.93 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Hire and labour charges for providing 1x40W patties type fluorescent fittings with accessories and tubes for 1st day i.e., as on 16.11.2023

140

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

8960

-

-

... More
Hire and labour charges for providing 1200mm sweep ceiling fan and giving connection for 1st day i.e., as on 16.11.2023

36

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

2304

-

-

... More
Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch as suitable size MS box with hylam sheet front cover for 1st day i.e., as on 16.11.2023

72

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

4608

-

-

... More
Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size MS box with hylam sheet front cover for 1st day i.e., on 16.11.2023

3

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

192

-

-

... More
Hire and Labour charges for providing 400W metal halide lamp fittings for 1st day i.e. on 16.11.2023

30

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

1920

-

-

... More
Hire and labour charges for providing 20mm PVC pipe with accessories for 1st day i.e., as on 16.11.2023

450

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

28800

-

-

... More
Hire and labour charges for providing 25mm PVC pipe with accessories for 1st day i.e. on 16.11.2023

180

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

11520

-

-

... More
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper wire clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 16.11.2023

3600

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

230400

-

-

... More
Hire and labour charges for providing 2x7/20 SWG PVC insulated copper clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 16.11.2023

1890

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

120960

-

-

... More
Hire and labour charges for providing 3.50x35Sq.mm AYFY cable conforming to IS 1554 Part I 1964 and giving connection for 1st day i.e., as on 16.11.2023

72

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

4608

-

-

... More
Hire and labour charges for providing 3 phase 4 way MCB DB with 63A 4 Pole isolator, ELCB and giving connection for 1st day i.e. on 16.11.2023

3

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

192

-

-

... More
Hire and labour charges for providing main board consisting of 100A TPN SDF with 100A TPN busbar chamber as incomer and 1 No. 63A TPN SDF and 4Nos. 32A TPN SDF as outgoing and giving connection for 1st day i.e., on 16.11.2023

1

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

64

-

-

... More
Hire and labour charges for providing 100A 4 Pole on load charge over switch with 9 Nos. phase indication lamp of suitable size angle iron stand for 1st day i.e., on 16.11.2023

1

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

64

-

-

... More
Hire and labour charges for providing 35kVA DG set complete including conveyance, posting of duty staff for 1st day i.e., on 16.11.2023

1

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

64

-

-

... More
Running charges for 35kVA DG set including supply of fuel, etc. for 66 days during the period from 16.11.2023 to 19.01.2024

144

-

-

... More
Hire and labour charges for providing bamboo / Kattadi posts including erection for 1st day i.e., on 16.11.2023

63

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

4032

-

-

... More
Hire and labour charges for providing ordinary type meter board consists of 3 Nos. 100/63A HRC cut out with fuse links and 1 No. 100/63A 2 way neutral link for 1st day i.e., as on 16.11.2023

1

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

64

-

-

... More
Hire and labour charges for providing ordinary pipe earthing as required on 1st day i.e. on 16.11.2023

9

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

576

-

-

... More
Hire and labour charges for providing drawing No.8 SWG bare copper conductor and giving connection for 1st day i.e. on 16.11.2023

63

-

-

... More
Do- -do- for additional 64 days from 17.11.2023 to 19.01.2024

4032

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.