Travancore Devaswom Board Tender

... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Travancore Devaswom Board Tender

Works
Eprocure
Opening Date19 Oct 2019
Closing Date26 Oct 2019
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Format of Preliminary agreement to be executed on Stamp Paper worth Rs. 200/-
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Malikapuram devi temple structure including prasadamandapam and gopuram by using 175set. (Rate Quoted should be Set/Day)

175

-

-

... More
Devaswom book stall at sannidhanam by using 70 set. (Rate Quoted should be Set/Day)

70

-

-

... More
Tree in the lower thirumuttom by using 95set.(Rate Quoted should be Set/Day)

95

-

-

... More
Publicity and information office building by using 25set.(Rate Quoted should be Set/Day)

25

-

-

... More
Devaswom guest house by using 100set (Rate Quoted should be Set/Day)

100

-

-

... More
Accommodation office building by using 25set. (Rate Quoted should be Set/Day)

25

-

-

... More
Maramath complex by using 75set. (Rate Quoted should be Set/Day)

75

-

-

... More
Hire and labour charges for providing serial set consisting of 24 nos of miniature type bulb with colour paper covering in position and giving connection etc for additional 65 days from 16.11.2019 to 19.01.2020

-

-

-

... More
Sree dharma sastha temple structure including prasadamandapam by using 300 set/day for 65days.(300x65days=19500sets) (Rate Quoted should be Set/Day)

19500

-

-

... More
Malikapuram devi temple structure including prasadamandapam and gopuram by using 175set/day for 65 days.(175x65=11375set) (Rate Quoted should be Set/Day)

11375

-

-

... More
Devaswom book stall at sannidhanam by using 70 set/day for 65days (70x65days=4550set).(Rate Quoted should be Set/Day)

4550

-

-

... More
Tree in the lower thirumuttom by using 95set/day for 65days(95x65day=6175set) (Rate Quoted should be Set/Day)

6175

-

-

... More
Publicity and information office building by using 25set/day for 65days(25x65day=1625set) (Rate Quoted should be Set/Day)

1625

-

-

... More
Devaswom guest house by using 100set/day for 65day(100x65day=6500set) (Rate Quoted should be Set/Day)

6500

-

-

... More
Accommodation office building by using 25set/day for 65days (25x65days=1625set) (Rate Quoted should be Set/Day)

1625

-

-

... More
Maramath complex by using 75set/day for 65days(75x65day=4875set) (Rate Quoted should be Set/Day)

4875

-

-

... More
Appendix B Providing temporary light arrangements on hire bases to the police shelters and fire points etc. in the various locations at Sabarimala.

-

-

-

... More
Hire and labour charge for providing wiring light/fan point inside the shed using 1sq.mm PVC insulated copper wire through 20mm dia PVC conduit and accessories and ceiling rose for first day ie:15.11.2019

468

-

-

... More
Do …. do for additional 65days from 16.11.2019to19.01.2020.(468x65=30420nos) (Rate Quoted should be Each per Day)

30420

-

-

... More
Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie: on 15.11.2019 (Rate Quoted should be Each per Day)

55

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

3375

-

-

... More
Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size MS box with hylam sheet front cover for first day ie;on 15.11.2019. (Rate Quoted should be Each per Day)

18

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

1170

-

-

... More
Hire and labour charges for providing 1x40W patties type fluresent fittings with all accessories and tubes for first dayie;15.11.2019 (Rate Quoted should be Each per Day)

317

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

20605

-

-

... More
Hire and labour charges for providing 1200mm sweep ceiling fan and giving connection for first day ie;15.11.2019 (Rate Quoted should be Each per Day)

151

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

9815

-

-

... More
Hire and labour charges for providing 20mm PVC pipe with accessories for Ist day ie;on 15.11.2019. (Rate Quoted should be Metre per Day)

680

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

44200

-

-

... More
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2019. (Rate Quoted should be Meter per Day)

425

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meters per Day)

27626

-

-

... More
Hire and labour charges for providing 4x3/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2019.

175

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

11375

-

-

... More
Hire and labour charges for providing 2x7/20 SWG PVC insulated copper clipped with No.12SWG GI wire through the existing PVC conduit and giving connection for Ist day ie: on 15.11.2019. (Rate Quoted should be Meter per Day)

144

-

-

... More
Do …. do for additional 65days from 16.11.2019to 19.01.2020 (Rate Quoted should be Meter per Day)

9360

-

-

... More
Hire and labour charges for providing 3 phase 4 way MCB DB with 40A 4 pole isolator and giving connection for Ist day ie;15.11.2019. (Rate Quoted should be Each per Day)

30

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

1950

-

-

... More
Hire and labour charges for providing ordinary type meter board consists of 3nos 63A HRC cut out with fuse link and 1no 63A 2 way neutral link for Ist day ie; 15.11.2019

30

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

1950

-

-

... More
Hire and labour charges for providing ordinary pipe earthing as required for Ist day ie; 15.11.2019 (Rate Quoted should be Each per Day)

30

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

1950

-

-

... More
Hire and labour charges for providing drawing No 10 SWG base copper conductor and giving connection for Ist day ie; 15.11.2019. (Rate Quoted should be Meter per Day)

180

-

-

... More
Do …. do for additional 65days from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

11700

-

-

... More
Appendix-C.Tempoary light arrangements in kunnar dam site.

-

-

-

... More
Hire and labour charge for providing 10KVA DG set complete including conveyance posting of duty staff for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

2

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

128

-

-

... More
Running charges for10KVA DGset including supply of fuels etc: (Rate Quoted should be per Hour)

780

-

-

... More
Hire and labour charges for providing 3 phase 4way MCB DB with 40A 4 pole isolator ELCB and giving connection for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

1

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

64

-

-

... More
Hire and labour charge for providing ordinary pipe earthing as required ie:15.11.2019 (Rate Quoted should be Each per Day)

3

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

192

-

-

... More
Hire and labour charge for providing 20mm PVC pipe with accessories for Ist day ie:15.11.2019 (Rate Quoted should be Meter per Day)

74

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

4730

-

-

... More
Hire and labour charge for providing 2x3/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2019 (Rate Quoted should be M per Day)

75

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

4800

-

-

... More
Hire and labour charge for providing 2x7/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2019 (Rate Quoted should be Meter per Day)

15

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

960

-

-

... More
Hire and labour charge for providing pattes type fluresent tube fittings complete with tube in position and giving connection as required for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

15

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

960

-

-

... More
Hire and labour charge for providing 400W metal halide lamp fittings for first day ie: 15.11.2019. (Rate Quoted should be Each per Day)

5

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

320

-

-

... More
Hire and labour charge for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

5

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

320

-

-

... More
Appendix-D.Tempoary light arrangements in check dam site

-

-

-

... More
Hire and labour charge for providing 10KVA DG set complete including conveyance posting of duty staff for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

2

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019to 19.01.2020 (Rate Quoted should be Each per Day)

128

-

-

... More
Running charges for10KVA DGset including supply of fuels etc: (Rate Quoted should be per Hour)

780

-

-

... More
Hire and labour charges for providing 3 phase 4way MCB DB with 40A 4 pole isolator ELCB and giving connection for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

1

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

64

-

-

... More
Hire and labour charge for providing ordinary pipe earthing as required ie:15.11.2019 (Rate Quoted should be Each per Day)

3

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

192

-

-

... More
Hire and labour charge for providing 20mm PVC pipe with accessories for Ist day ie:15.11.2019 (Rate Quoted should be Meter per Day)

74

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

4730

-

-

... More
Hire and labour charge for providing 2x3/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2019 (Rate Quoted should be M per Day)

75

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

4800

-

-

... More
Hire and labour charge for providing 2x7/20 SWG PVC insulated copper wire clipped with No 12 SWG GI wire and giving connection for Ist day ie:15.11.2019 (Rate Quoted should be Meter per Day)

15

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Meter per Day)

960

-

-

... More
Hire and labour charge for providing pattes type fluresent tube fittings complete with tube in position and giving connection as required for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

15

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

960

-

-

... More
Hire and labour charge for providing 400W metal halide lamp fittings for first day ie: 15.11.2019. (Rate Quoted should be Each per Day)

5

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

320

-

-

... More
Hire and labour charge for providing 5A combined plug socket controlled by 5A SP switch on suitable size MS box with hylam sheet front cover for first day ie:15.11.2019 (Rate Quoted should be Each per Day)

5

-

-

... More
Do. do. for the remaining 64 days during the period from 16.11.2019 to 19.01.2020 (Rate Quoted should be Each per Day)

320

-

-

... More
Appendix-E Conveyance charges

-

-

-

... More
To and fro conveyance charges of equipments accessories etc: from Sabarimala to kunnar and check dam site.

1

-

-

... More
Additional conveyance charges for fuels and engine oil from Sabarimala to kunnar and check dam site as per the requirement during the course of festival period as directed by the department officer.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.