Travancore Devaswom Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Travancore Devaswom Board Tender
Civil And Construction
Eprocure
Opening Date25 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 6,73,970
Costs
EMD
₹ 17,000Document Cost
₹ 1,600Tender Fee
Refer Documents
Summary
Pampa Devaswom In Sabarimala Group Mnm Festival In 1200me Providing Temporary Light Arrangements On Hire Basis In And Around The Temple Premises Queue Pandal Manalpuram River Shore Sewage Treatment Plant Incinerator Yard Etc In And Around At Pampa
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TDB_698263_1Bid Award Id
ViewTender No
TDB/EEE/ET-122/2024-25Tender Authority
Travancore Devaswom Board ViewPurchaser Address
-Website
http://http://travancoredevaswomboard.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Hire and labour charges for providing 400W metal halide lamp fittings for 1st day i.e., as on 15.11.2024
90
396
35640
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
5850
79
462150
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper wire and giving connection for 1st day i.e., as on 15.11.2024
540
1
540
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
35100
-
3510
Hire and labour charges for providing 2x7/20 SWG PVC insulated copper wire clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 15.11.2024
360
1
648
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
23400
-
4680
Hire and labour charges for providing 4x7/20 SWG PVC insulated copper wire clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 15.11.2024
720
3
2592
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
46800
-
18720
Hire and labour charges for providing 4x10Sq.mm AYFY cable conforming to IS 1554 Part I 1964 and giving connection for 1st day i.e., as on 15.11.2024
360
6
2160
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
23400
-
21060
Hire and labour charges for providing 4x16Sq.mm AYFY cable conforming to IS 1554 Part I 1964 and giving connection for 1st day i.e., as on 15.11.2024
270
7
2025
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
17550
1
19305
Hire and labour charges for providing 3½x35Sq.mm AYFY cable conforming to IS 1554 Part I 1964 and giving connection for 1st day i.e., as on 15.11.2024
180
12
2160
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
11700
1
19890
Hire and labour charges for providing 3 phase 4 way MCB DB with 40A 4 Pole ELCB and 40A 4 Pole isolator and giving connection for 1st day i.e. on 15.11.2024
3
129
387
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
195
20
3900
Hire and labour charges for providing 3 phase 4 way MCB DB with 63A 4 Pole isolator, ELCB and giving connection for 1st day i.e. on 15.11.2024
1
157
157
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
65
23
1495
Hire and labour charges for providing main board consisting of 100A TPN SDF with 100A TPN busbar chamber as incomer and 1 No. 63A TPN SDF and 4 Nos. 32A TPN SDF as outgoing and giving connection for 1st day i.e. on 16.11.2023
1
320
320
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
65
50
3250
Hire and labour charges for providing 100A 4 Pole on load charge over switch with 9 Nos. phase indication lamp of suitable size angle iron stand for 1st day i.e. on 15.11.2024
1
237
237
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
65
39
2535
Hire and labour charges for providing ordinary pipe earthing as required on 1st day i.e. on 15.11.2024
6
155
930
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
390
1
702
Hire and labour charges for providing drawing No.8 SWG bare copper conductor and giving connection for 1st day i.e. on 15.11.2024
45
2
121.5
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
2925
-
731.25
Hire and labour charges for providing 25mm PVC pipe with accessories for 1st day i.e. on 15.11.2024
144
2
331.2
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
9360
-
936
Hire and labour charges for providing 32mm PVC pipe with accessories for 1st day i.e. on 15.11.2024
180
2
486
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
11700
-
1755
Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch as suitable size MS box with hylam sheet front cover for 1st day i.e., as on 15.11.2024
18
9
165.6
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
1170
-
585
Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size MS box with hylam sheet front cover for 1st day i.e., on 15.11.2024
9
13
121.5
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
585
-
526.5
Hire and labour charges for providing heavy duty air circulator pedestal fan and giving connection from the existing plug point for 1st day i.e., on 15.11.2024
18
149
2682
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
1170
30
35100
Hire and labour charges for providing bamboo and kattadi/bamboo posts including erection for 1st day i.e., on 15.11.2024
54
17
931.5
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025.
3510
3
10530
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements