Travancore Devaswom Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Travancore Devaswom Board Tender
Eprocure
Opening Date25 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 4,66,786
Costs
EMD
₹ 12,000Document Cost
₹ 1,150Tender Fee
Refer Documents
Summary
Nilackal Devaswom In Sabarimala Group Light Arrangements On Hire Basis To The Shelters For Traffic Police Control Unit And Safe Zone Program Conducted By Motor Transport Department And Along The Road In And Around At Elavunkal In 2024 2025
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TDB_698279_1Bid Award Id
ViewTender No
TDB/EEE/ET-123/2024-25Tender Authority
Travancore Devaswom Board ViewPurchaser Address
-Website
http://http://travancoredevaswomboard.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Hire and labour charges for providing 1x40W patties type fluorescent fittings with accessories and tubes for 1st day i.e., as on 15.11.2024
140
15
2100
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
9100
1
17290
... More
Hire and labour charges for providing 1200mm sweep ceiling fan and giving connection for 1st day i.e., as on 15.11.2024
36
22
826.2
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
2340
5
11700
... More
Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch as suitable size MS box with hylam sheet front cover for 1st day i.e., as on 15.11.2024
72
9
662.4
... More
Do- -do- for additional 64 days from 16.11.2024 to 19.01.2025
4680
-
2340
... More
Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size MS box with hylam sheet front cover for 1st day i.e., on 15.11.2024
3
13
40.5
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
195
-
175.5
... More
Hire and Labour charges for providing 400W metal halide lamp fittings for 1st day i.e. on 15.11.2024
30
396
11880
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
1950
79
154050
... More
Hire and labour charges for providing 20mm PVC pipe with accessories for 1st day i.e., as on 15.11.2024
450
2
945
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
29250
-
2925
... More
Hire and labour charges for providing 25mm PVC pipe with accessories for 1st day i.e. on 15.11.2024
180
2
414
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
11700
-
1170
... More
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 15.11.2024
3600
1
3600
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
234000
-
23400
... More
Hire and labour charges for providing 2x7/20 SWG PVC insulated copper clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 15.11.2024
1890
1
3402
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
122850
-
24570
... More
Hire and labour charges for providing 3.50x35Sq.mm AYFY cable conforming to IS 1554 Part I 1964 and giving connection for 1st day i.e., as on 15.11.2024
72
12
864
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
4680
1
7956
... More
Hire and labour charges for providing 3 phase 4 way MCB DB with 63A 4 Pole isolator, ELCB and giving connection for 1st day i.e. on 15.11.2024
3
157
471
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
195
23
4485
... More
Hire and labour charges for providing main board consisting of 100A TPN SDF with 100A TPN busbar chamber as incomer and 1 No. 63A TPN SDF as outgoing and giving connection for 1st day i.e., on 15.11.2024
1
320
320
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
50
3250
... More
Hire and labour charges for providing 100A 4 Pole on load charge over switch with 9 Nos. phase indication lamp of suitable size angle iron stand for 1st day i.e., on 15.11.2024
1
237
237
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
39
2535
... More
Hire and labour charges for providing 35kVA DG set complete including conveyance, posting of duty staff for 1st day i.e., on 15.11.2024
1
2891
2891
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
1395
90675
... More
Running charges for 35kVA DG set including supply of fuel, etc. for 66 days during the period from 15.11.2024 to 19.01.2025
144
278
40032
... More
Hire and labour charges for providing bamboo / Kattadi posts including erection for 1st day i.e., on 15.11.2024
63
17
1086.75
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
4095
3
12285
... More
Hire and labour charges for providing ordinary type meter board consists of 3 Nos. 100/63A HRC cut out with fuse links and 1 No. 100/63A 2 way neutral link for 1st day i.e., as on 15.11.2024
1
117
117
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
16
1040
... More
Hire and labour charges for providing ordinary pipe earthing as required on 1st day i.e. on 15.11.2024
9
155
1395
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
585
1
1053
... More
Hire and labour charges for providing drawing No.8 SWG bare copper conductor and giving connection for 1st day i.e. on 15.11.2024
63
2
170.1
... More
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
4095
-
1023.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements