Travancore Devaswom Board Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Travancore Devaswom Board Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 3,81,112
Costs
EMD
₹ 9,550Document Cost
₹ 900Tender Fee
Refer Documents
Summary
Nilackal Devaswom In Sabarimala Group Mnm Festival In 1200me Providing Temporary Light Arrangements On Hire Basis To The Shelters For Accommodating Police Force And Fire Force And Along The Road In And Around At Plappally In 2024 2025
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_TDB_698305_1Bid Award Id
ViewTender No
TDB/EEE/ET-124/2024-25Tender Authority
Travancore Devaswom Board ViewPurchaser Address
-Website
http://http://travancoredevaswomboard.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Hire and labour charges for providing 1x40W patties type fluorescent fittings with accessories and tubes for 1st day i.e., as on 15.11.2024
126
15
1890
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
8190
1
15561
Hire and labour charges for providing 1200mm sweep ceiling fan and giving connection for 1st day i.e., as on 15.11.2024
30
22
688.5
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
1950
5
9750
Hire and labour charges for providing 5A combined plug socket controlled by 5A SP switch as suitable size MS box with hylam sheet front cover for 1st day i.e., as on 15.11.2024
27
9
248.4
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
1755
-
877.5
Hire and labour charges for providing 15A and 5A combined plug socket controlled by 15A SP switch on suitable size MS box with hylam sheet front cover for 1st day i.e., on 15.11.2024
3
13
40.5
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
195
-
175.5
Hire and Labour charges for providing 400W metal halide lamp fittings for 1st day i.e. on 15.11.2024
27
396
10692
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
1755
79
138645
Hire and labour charges for providing 20mm PVC pipe with accessories for 1st day i.e., as on 15.11.2024
360
2
756
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
23400
-
2340
Hire and labour charges for providing 25mm PVC pipe with accessories for 1st day i.e. on 15.11.2024
90
2
207
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
5850
-
585
Hire and labour charges for providing 2x3/20 SWG PVC insulated copper clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 15.11.2024
2700
1
2700
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
175500
-
17550
Hire and labour charges for providing 2x7/20 SWG PVC insulated copper clipped with No.12 SWG GI wire and giving connection for 1st day i.e., as on 15.11.2024
1080
1
1944
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
70200
-
14040
Hire and labour charges for providing 3.5x25 Sq.mm AYFY cable conforming to IS 1554 Part I 1964 and giving connection for 1st day i.e., as on 15.11.2024
72
9
648
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
4680
1
6318
Hire and labour charges for providing 3 phase 4 way MCB DB with 40A 4 Pole isolator, 4pole ELCB and giving connection for 1st day i.e. on 15.11.2024
3
129
387
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
195
20
3900
Hire and labour charges for providing main board consisting of 100A TPN SDF with 100A TPN busbar chamber as incomer and 1 No. 63A TPN SDF and 4 Nos. 32A TPN SDF as outgoing and giving connection for 1st day i.e., on 15.11.2024
1
320
320
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
50
3250
Hire and labour charges for providing 100A 4 Pole on load charge over switch with 9 Nos. phase indication lamp of suitable size angle iron stand for 1st day i.e., on 16.11.2023
1
237
237
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
39
2535
Hire and labour charges for providing 25kVA DG set complete including conveyance, posting of duty staff for 1st day i.e., on 15.11.2024
1
2437
2437
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
1190
77350
Running charges for 25kVA DG set including supply of fuel, etc. for 66 days during the period from 15.11.2024 to 19.01.2025
144
207
29808
Hire and labour charges for providing bamboo / Kattadi posts including erection for 1st day i.e., on 15.11.2024
45
17
776.25
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
2925
3
8775
Hire and labour charges for providing ordinary type meter board consists of 3 Nos. 100/63A HRC cut out with fuse links and 1 No. 100/63A 2 way neutral link for 1st day i.e., as on 15.11.2024
1
117
117
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
65
16
1040
Hire and labour charges for providing ordinary pipe earthing as required on 1st day i.e. on 15.11.2024
9
155
1395
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
585
1
1053
Hire and labour charges for providing drawing No.8 SWG bare copper conductor and giving connection for 1st day i.e. on 15.11.2024
63
2
170.1
Do- -do- for additional 65 days from 16.11.2024 to 19.01.2025
4095
-
1023.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements