The Travancore Cochin Chemicals Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

The Travancore Cochin Chemicals Limited Tender

Works
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date25 Jul 2024
Closing Date19 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Miscellaneous hot insulation works inside factory for a period of one year
Miscellaneous hot insulation works inside factory for a period of one year
Miscellaneous hot insulation works inside factory for a period of one year
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling 150/200mm thick hot insulation from the existing position to facilitate the carrying out of the maintenance works at all elevations and locations fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete

45

-

-

... More
Fixing back 50mm/75mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost)

45

-

-

... More
Fixing back the 100/120mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete.(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost).

50

-

-

... More
Fixing back the 150/200mm thick insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding charges, all safety protection works to men and machineries etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost)

185

-

-

... More
Fixing back 22g carbon steel cladding by using new/ old screws to pipe lines, vessels and tanks at all elevations and locations, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required used/new carbon steel sheet will be issued by TCC at free of cost).

200

-

-

... More
Engaging Insulation Workers for executing miscellaneous works at all elevations and locations, including all labour charges, hire for tools, ESI, PF and all other benefits payable, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete

40

-

-

... More
Providing 22g aluminium sheet cladding to process tanks, equipments, pipe lines as per standard practices and instructions at all elevations and locations upto 15M from finished floor level for all sizes, including cost of aluminium sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost, approved by TCC, all hire for hand cart/tempo van/lorry etc., complete,

55

-

-

... More
Providing 22g carbon steel sheets hot galvanized with a zinc coat of approximate 0.275kg/m2 for new cladding as per standard practices and instructions at all locations and elevations to pipe lines, vessels, tanks etc, including cost of treated sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding charges, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete

55

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.