Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

The Travancore Cochin Chemicals Limited Tender

Works
Eprocure
Opening Date28 May 2020
Closing Date10 Jun 2020
Tender Amount₹ 47,50,895 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of RCC foundation and dyke wall for 2 Nos Hcl Acid storage tank having capacity 350 Cu.M
Construction of RCC foundation and dyke wall for 2 Nos. Hcl Acid storage tank having capacity 350 Cu.M
Construction of RCC foundation and dyke wall for 2 Nos. Hcl Acid storage tank having capacity 350 Cu.M
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement concrete 1:3:6 using 40 mm size approved quality hard blue granite broken stone for foundation and floor below RCC to a thickness of 75 mm including cost of all materials, labour charges, hire for tools, plants and , cost of consumables, all safety measures like helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day etc.., complete. (Required quantity of cement will be issued free of cost by TCC)

41

-

-

... More
Reinforced cement concrete M30 grade using 20mm and down grade approved quality hard blue granite broken stone and a minimumquantity of cement (432kg/cement per Cu.M) for foundation footings, equipment foundations, circular footings, plinth, beams, columns, tie beams, slabs, drains, vertical walls, stairs, cover slabs, curved walls of all sizes and shapes, including bailing/pumping out all sorts of water, ground water, seepage water, water leaking nearby drains etc., with required number of diesel driven pumpsets of adequate capacities, including all materials, labour charges, hire for tools, plants and , cost of consumables, including all safety measures like helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day including making and testing charges of concrete cubes for 7 day and 28 days test , certified from Cochin University or other agency approved by engineer-in-charge etc.., complete. (Required quantity of cement will be issued free of cost except for operating item 6)

227

-

-

... More
Do..do M-30 grade design Ready mix concrete with minimum cement of grade OPC 432 Kg per CuM including cost of conveyance , pumping cost for, levelling, consolidating with vibrator ,curing etc including making and testing charges of concrete cubes for 7 day and 28 days test , certified from Cochin University or other agency , approved by engineer-in-charge. one set cube for every load of 6 Cu.M of cement concrete including cost of cement In this case contractor should quote only additional charges TCC has to pay to him other than the rate in Item No: 5 considering cost of cement, conveyance charge etc, if TCC permit him to use designed ready mix concrete from outside TCC and TCC will not issue cement to contractor for this item depending on quantity of work in Item No:5)

227

-

-

... More
Reinforcement work with M.S/Tor steel rods, corrosion resistant steel rods of all dia for foundation footings, circular footings, walls, columns, beams, slabs, stair cases, equipment foundations, curved walls, floors etc., of all sizes and shapes, excluding cost of all reinforcement rods (which will be issued free of cost by TCC), but including cost of 16g G.I. binding wire, straightening, marking, bending, placing in position, tying with required binding wire, providing required number of cover blocks as per instructions and standard practices for work up to 3M above ground level, including all labour charges, hire for tools and plants, cost of consumables, all conveyance charges, bailing/pumping out all sorts of water including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc.., complete.

21000

-

-

... More
Formwork using plywood sheets, M.S. sheets, wooden plants, wooden/M.S. props, struts, bracings etc., for foundation , of all sizes, shapes and thickness at all locations and elevations up to 1M from existing ground level as per standard practices, dissembling the formwork and cleaning the area after the required period, including all labour charges, hire for formwork materials, cost of consumables, bailing/pumping out all sorts of water all safety precautions etc. Including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors’ risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day etc., complete.

742

-

-

... More
Plastering with cement sand mortar 1:4, 12 mm thick using approved branded M-Sand of POABS make for all surface like wall, floors etc after preparation of surface for getting proper grip of cement mortar, curing charges, providing floating coat of neat cement wherever necessary including cost of all materials, labour charges, hire for tools and plants, cost of consumables, including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day etc including mixing of suitable water proofing materials supplied separately.., complete. (Required quantity of cement will be issued free of cost)

489

-

-

... More
Grouting the anchor bolts of all dia up to 25 mm bolt having sufficient anchorage length with rich cement sand mortar 1:2 using approved branded M-Sand of POABS make and wall after preparation of surface for getting proper grip of cement mortar including cost of all materials, labour charges, hire for tools and plants, cost of consumables, including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge including obtaining work permit approval from concerned sections before work starts on each day, including mixing of suitable adhesives and admixes supplied separately by TCC free of cost complete. (Required quantity of anchor bolt, cement will be issued free of cost by TCC)

12

-

-

... More
Masonry work with solid concrete blocks of size 30x20x15cm or 30x20x10cm available size for walls in cement mortar 1:4 for all thickness, sizes and shapes using approved quality and size solid concrete blocks at all elevations and locations, including racking and hacking the surface for proper grip, including all labour charges, cost of all materials, hire for tools and plants, curing, all safety precautions etc., complete. (Cement will be issued free of cost by TCC)

2

-

-

... More
Supplying and fixing expansion joint filler material of 12mm thick bitumen impregnated fibre board conforming to IS 1838, including cost of primer ,sealing compound grade -In expansion joints, including cost of all materials, labour charges, hire for tools and plants cost of consumables, including all safety measures like safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc as per standared practice and approved by engineer-in-charge

30

-

-

... More
Supplying and fixing expansion joint filler material of 20 mm thick bitumen impregnated fibre bond conforming to IS 1838, including cost of primer ,sealing compound grade -A in expansion joints, including cost of all materials, labour charges, hire for tools and plants cost of consumables, including all safety measures like safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc as per standared practice and approved by engineer-in-charge

42

-

-

... More
Providing acid resistant tile lining at all locations up to an elevation of 1.5M from ground level in horizontal, vertical and curved surface with approved quality acid resistant tiles of size 230x114x38mm or nearest size set in CNSL bedding over a base of one coat of 90/15 grade bituminous paint and 12 mm thick bitumastic membrane set in with 6mm wide 8 to 10 mm deep joints pointing with CNSL, including cost of AR tiles,all materials cost, labour charges, conveyance chrges,all safety precautions etc like safety net, safety belt, helmet, goggles / face shield, safety shoes, at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining work permit approval from concerned sections before work starts on each day etc.., complete

396

-

-

... More
Providing bitumen sand mix (bitumen 85/25) with clean gritty sand (6% to 10% of sand weight of bitumen to have proper mix) levelled, trowelled and fnished to a minimum thickness of 50mm to get uniform sruface level at top of bitumen bed at all elevations and locations to the required line, level etc., including cost of all materials, bitumen, sand, wastage, cost of fuel, all labour charges, hire for tools and safety precautions etc., complete for 10M dia (approx.) of tank foundation

7.5

-

-

... More
Engaging following labourers for executing miscellaneous items of work l at all locations and elevations, including all labour charges, ESI, PF, KCWWF contributions and all other benefits payable, hire for tools and plants, all safety precautions etc., complete. a) Skilled Worker

2

-

-

... More
b) Man Mazdoor

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.