The Travancore Cochin Chemicals Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 12,380Document Cost
₹ 160Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_TCCL_488694_1Tender No
TCCL/WC/C/851/2021Tender Authority
The Travancore Cochin Chemicals Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Setting up scaffolding minimum of 2.5M width using , M.S. pipes, scaffolding structure bamboo poles, wooden planks etc including providing protective safety net of nylon having sufficient stength to hold men and material , upto a height of 7.5 M from existing ground level, joining the pipe or poles using scaffolding clamps tying with coir etc., providing wooden planks for platform at horizontal position, clearing area after completing the work, including all labour charges, hire for tools, cost of consumables, all safety precautions etc.including all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day etc., complete.
400
-
-
... More
Surface preparation of the concrete surface by removing old paints and all other forgine materials over the concrete surface by scrapping or buffing with electriacly operated hand tools etc to remove all forgine matterials like paint, alge etc and prepare the concrete surface by hacking the concrete surface with chipping chisel , remove the rusts on steel bars by suitable metods washing the same throughly etc, to get good bond between old conctrete and new ferro cement plastering works including all labour charges, hire for tools,cost of consumables safety measures etcincluding all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day etc..complete
400
-
-
... More
Supplyig and Fxing fibre net 10mmx10mm in position in line and level and plumb with sufficient overlap with out extra payment before ferro cement rough cut plastering etc, including cost of all consumables,tools,safety measures etcincluding all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day etc. including cost of fixing the fibre mesh in position to concrete etc.complete
200
-
-
... More
Reinforced cement concrete 1:1 1/2:3 using 20mm and down grade approved quality hard blue granite broken stone for foundation footings, equipment foundations, plinth, beams, columns, tie beams, slabs, lintels, sunshades, drains, vertical walls, stairs, cover slabs, curved walls of all sizes and shapes, including all labour charges, hire for tools, plants and pumpsets, cost of consumables, all safety precautions etc., complete. (Required quantity of cement and steel will be issued free of cost)
14
-
-
... More
Reinforcement work with M.S/Tor steel rods, corrosion resistant steel rods of all dia for foundation footings, rafters, columns, beams, tie beams, lintels, slabs, stair cases, sunshades, equipment foundations, curved walls etc., of all sizes and shapes, excluding cost of all reinforcement rods (which will be issued free of cost by TCC), but including cost of 16g G.I. annealed binding wire, straightening, marking, bending, placing in position, tying with required binding wire, providing required number of cover blocks as per instructions and standard practices for work upto 20M above ground level, including all labour charges, hire for tools and plants, cost of consumables, all conveyance charges, all safety precautions etc., complete.
600
-
-
... More
Engaging following labourers for executing miscellaneous items of work at all locations and elevations, including all labour charges, ESI, PF, KCWWF contributions and all other benefits payable, hire for tools and plants, all safety precautions etc., complete.
a. Male Coolie
10
-
-
... More
Formwork using plywood sheets, M.S. sheets, wooden plants, wooden/M.S. props, struts, bracings etc., for columns, beams, lintels, sunshades, slabs of all sizes, shapes and thickness at all locations and elevations upto 20m from existing ground level as per standard practices, dissembling the formwork and cleaning the area after the required period, including all labour charges, hire for formwork materials, cost of consumables, all safety precautions etc., complete.
50
-
-
... More
Painting with 2 coats of emulsion paint /chlorinated rubber paint above the primer coat in newly plastered surface or in steel structures,excluding the cost of paints ( which will be issued free of cost by T.C.C) including all labour charges, hire for tools and plants, cost of consumables, all conveyance charges, all safety precautions etc. complete.
500
-
-