The Travancore Cochin Chemicals Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

The Travancore Cochin Chemicals Limited Tender

Works
Civil And Construction
Eprocure
Opening Date10 May 2022
Closing Date30 May 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
RCC for Structural repair inside TCC factory
RCC for Structural repair inside TCC factory.
RCC for Structural repair inside TCC factory.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Setting up scaffolding minimum of 2.5M width using , M.S. pipes, scaffolding structure bamboo poles, wooden planks etc including providing protective safety net of nylon having sufficient stength to hold men and material , upto a height of 7.5 M from existing ground level, joining the pipe or poles using scaffolding clamps tying with coir etc., providing wooden planks for platform at horizontal position, clearing area after completing the work, including all labour charges, hire for tools, cost of consumables, all safety precautions etc.including all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day etc., complete.

400

-

-

... More
Surface preparation of the concrete surface by removing old paints and all other forgine materials over the concrete surface by scrapping or buffing with electriacly operated hand tools etc to remove all forgine matterials like paint, alge etc and prepare the concrete surface by hacking the concrete surface with chipping chisel , remove the rusts on steel bars by suitable metods washing the same throughly etc, to get good bond between old conctrete and new ferro cement plastering works including all labour charges, hire for tools,cost of consumables safety measures etcincluding all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day etc..complete

400

-

-

... More
Supplyig and Fxing fibre net 10mmx10mm in position in line and level and plumb with sufficient overlap with out extra payment before ferro cement rough cut plastering etc, including cost of all consumables,tools,safety measures etcincluding all safety measures like safety net,safety belt, helmet, goggles / face sheld, safety shoes, life line for hooking safety belt at contractors risk and cost,approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day etc. including cost of fixing the fibre mesh in position to concrete etc.complete

200

-

-

... More
Reinforced cement concrete 1:1 1/2:3 using 20mm and down grade approved quality hard blue granite broken stone for foundation footings, equipment foundations, plinth, beams, columns, tie beams, slabs, lintels, sunshades, drains, vertical walls, stairs, cover slabs, curved walls of all sizes and shapes, including all labour charges, hire for tools, plants and pumpsets, cost of consumables, all safety precautions etc., complete. (Required quantity of cement and steel will be issued free of cost)

14

-

-

... More
Reinforcement work with M.S/Tor steel rods, corrosion resistant steel rods of all dia for foundation footings, rafters, columns, beams, tie beams, lintels, slabs, stair cases, sunshades, equipment foundations, curved walls etc., of all sizes and shapes, excluding cost of all reinforcement rods (which will be issued free of cost by TCC), but including cost of 16g G.I. annealed binding wire, straightening, marking, bending, placing in position, tying with required binding wire, providing required number of cover blocks as per instructions and standard practices for work upto 20M above ground level, including all labour charges, hire for tools and plants, cost of consumables, all conveyance charges, all safety precautions etc., complete.

600

-

-

... More
Engaging following labourers for executing miscellaneous items of work at all locations and elevations, including all labour charges, ESI, PF, KCWWF contributions and all other benefits payable, hire for tools and plants, all safety precautions etc., complete. a. Male Coolie

10

-

-

... More
Formwork using plywood sheets, M.S. sheets, wooden plants, wooden/M.S. props, struts, bracings etc., for columns, beams, lintels, sunshades, slabs of all sizes, shapes and thickness at all locations and elevations upto 20m from existing ground level as per standard practices, dissembling the formwork and cleaning the area after the required period, including all labour charges, hire for formwork materials, cost of consumables, all safety precautions etc., complete.

50

-

-

... More
Painting with 2 coats of emulsion paint /chlorinated rubber paint above the primer coat in newly plastered surface or in steel structures,excluding the cost of paints ( which will be issued free of cost by T.C.C) including all labour charges, hire for tools and plants, cost of consumables, all conveyance charges, all safety precautions etc. complete.

500

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.