The Kerala Minerals And Metals Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 36,750Document Cost
₹ 2,602Tender Fee
Refer Documents
Summary
Tender For Construction Of Rcc Delay Pit In Kmml
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_KMML_637622_1Bid Award Id
ViewTender No
TP/TS/ENV/CONSTRUCTION OF RCC DELAY PIT/2023Tender Authority
The Kerala Minerals And Metals Limited ViewPurchaser Address
-Website
http://etenders.kerala.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work excavation for pit in all classes of soil except hard rock which required blasting and depositing on bank with initial lead upto 50 m and lift upto1.5m including breaking clods, ramming and sectioning of soil bank and back filling etc , complete
220
-
-
Extra charges for earth work excavation for dewatering / shoring .
111
-
-
Rubble soling below PCC for a thickness of 230 mm by supplying materials including cost and conveyance of all materials, labour charges etc complete
13.6
-
-
Plain cement concrete 1:4:8(1 cement 4 Sand 8 Broken stone) using 40mm size hard blue granite broken stone for foundation bed including cost and conveyance of all materials, labour charges etc complete .
6.3
-
-
Extra charges for plain cement concrete 1:4:8 for dewatering /shoring
6.3
-
-
Providing and laying in position machine batched and machine mixed
design mix M-25 grade cement concrete for reinforced cement concrete
work, using cement content as per approved design mix, including
pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting
of concrete, improve workability without impairing strength and durability
as per direction of Engineer-in-charge
48
-
-
Centering and shuttering including strutting, propping etc. and removal
of form.
313.5
-
-
Providing reinforcement for RCC work bend, tied and placed in position (plain grill required bending cold) using Tor/ TMTsteel including cost and conveyance of all materials, labour charges etc., complete .
3840
-
-
Plastering with cement mortar 1:3[1cement 3sand ]12mm thick one coat floated hard and troweled smooth including, cost and conveyance of all materials, labour charges, curing etc , complete.
168.1
-
-
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand).
16.8
-
-
Filling available excavated earth (excluding rock) in trenches, plinth,
sides of foundations etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming and watering, lead up
to 50 m and lift upto 1.5 m.
20
-
-
Supply of sand , empty cement gunny bags and filling the sand into the bags , stitching them , conveying and stacking of sand bags in the site for the construction Diversion arrangements within a including all materials and labour charges etc complete and as directed by ENV department.
12
-
-
Hiring 1 No of Diesel Slurry pump for pumping intermittently to drain the water with slurry for maintaining continuous drainage flow during construction
20
-
-