The Kerala Ceramics Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

The Kerala Ceramics Limited - TKCL Tender

Works
Pipes and Pipe Related Activities
Eprocure
Opening Date22 Dec 2021
Closing Date7 Jan 2022
Tender Amount₹ 85,42,610 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Demolishing the existing civil structures: Demolishing the existing concrete foundations manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge and preparing the complete area for the execution of the work. Including the cost of labour, consumables, equipments, tools and tackles etc. complete.

6

-

-

... More
Demolishing existing RCC tank: Demolishing the RCC work manually/ by mechanical means including stacking of steel bars and disposal of includes unserviceable materials within 50 m lead as per the direction of Engineer in charge and preparing the area for the execution of civil works. Including the cost of labour, consumables, equipments, tools and tackles etc. complete

45

-

-

... More
Cleaning of existing tanks & drains: Cleaning the existing tanks by removing loose/hard clay/sludge etc. complete and disposing the same within 50 m lead as per the direction of Engineer in charge and preparing the area for the execution of civil works Including the cost of labour, consumables, equipments, tools and tackles etc. complete.

215

-

-

... More
Cleaning of existing tanks & drains: Cleaning the existing tanks by removing scrap/rubbish items etc. complete and disposing the same within 50 m lead as per the direction of Engineer in charge and preparing the area for the execution of civil works Including the cost of labour,consumables,equipments,tools and tackles etc. complete.

660

-

-

... More
Earth work in excavation: by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m for all kinds of soil., including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m..Including the cost of labour,consumables,equipments,tools and tackles etc. complete.

630

-

-

... More
Filling available excavated earth: (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m all complete as per drawing and direction of Engineer in charge.Including the cost of labour,consumables,equipments,tools and tackles etc. complete.

400

-

-

... More
Random Rubble masonry: with hard stone in foundation and superstructure at all levels with cement mortar 1:6 ( 1 cement : 6 coarse sand). Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

165

-

-

... More
Flush/ Ruled pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand)..Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

130

-

-

... More
Plain cement concrete: Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

250

-

-

... More
Cement concrete: Providing and laying in position M20 grade of Reinforced/plain cement concrete as defined by IS:456 for tanks located at ground floor level including the cost of centering, shuttering, finishing and reinforcement -excluding the cost of material and labour for reinforcement steel as per the drawings and specification. Including the cost of construction materials, labour, consumables, equipments, tools and tackles etc. complete.

70

-

-

... More
Cement concrete: Providing and laying in position M20 grade of Reinforced/plain cement concrete as defined by IS:456 for machine foundations including the cost of centering, shuttering, finishing and reinforcement -excluding the cost of material and labour for reinforcement steel as per the drawings and specification. Including the cost of construction materials, labour, consumables, equipments, tools and tackles etc. complete.

1.5

-

-

... More
Cement concrete: Providing and laying in position M20 grade of Reinforced/plain cement concrete as defined by IS:456 for slabs including the cost of centering, shuttering, strutting, finishing and reinforcement -excluding the cost of material and labour for reinforcement steel as per the drawings and specification. Including the cost of construction materials, labour, consumables, equipments, tools and tackles etc. complete.

18

-

-

... More
Cement concrete: Providing and laying in position M20 grade of Reinforced/plain cement concrete as defined by IS:456 for drains including the cost of centering, shuttering, strutting, finishing and reinforcement -excluding the cost of material and labour for reinforcement steel as per the drawings and specification. Including the cost of construction materials, labour, consumables, equipments, tools and tackles etc. complete.

18

-

-

... More
Cement concrete: Providing and laying in position M15 grade of Reinforced/plain cement concrete as defined by IS:456 for floors including the cost of centering, shuttering, finishing and reinforcement -excluding the cost of material and labour for reinforcement steel as per the drawings and specification. Including the cost of construction materials, labour, consumables, equipments, tools and tackles etc. complete.

40

-

-

... More
Steel reinforcement for R.C.C: Work includes straightening, cutting,bending, placing in position and binding all complete in all levels using Thermo-Mechanically Treated bars of grade Fe-500D or more.Including the cost of materials, labour, consumables, equipments, tools and tackles etc. complete.

7

-

-

... More
Concrete Solid block masonry using precast solid blocks (Factorymade) of size 30x20x15 cm or nearest available size confirming to IS 2185 part-I of 1979 for superstructure upto floor two level with thickness 20cm in CM1:6 (1cement:6 coarse sand) etc complete.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

40

-

-

... More
Plastering of internal surfaces of existing tanks: Work includes preparation of existing entire surface of the tanks/sumps by chipping/ hacking, scrubbing thoroughly with wire brush etc and disposing the unservicable materials within 50 m lead and cleaning the entire tank surface area with pressurized water jet and providing 12 mm thick plaster with (1:4) cement sand mortar at all heights and depth above and below plinth level for beams, walls, Floors etc. upto 5m level, including the cost of construction materials, labour, consumables, equipments, tools and tackles etc. complete

950

-

-

... More
Plastering of new surfaces : Providing and laying 12 mm thick plaster with (1:4) cement sand mortar at and at all heights and depth above and below plinth level to beams, wall, Floor etc. including chipping of concrete surfaces, cleaning etc. upto 5m lvl.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

400

-

-

... More
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. (By providing thickness for water proofing as 3mm)The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineer-incharge. The product performance shall carry guarantee for 10 years against any leakage.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

950

-

-

... More
Providing and laying water proofing treatment of floor, wall etc., by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. This layer will be allowed to air cure for 4 hours. (b) Second layer of slurry of cement @ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

166

-

-

... More
Painting inside the tank and drain channel with premium Coal tar epoxy coated primer of approved brand and manufacture 1 coat primer and 2 coat epoxy Work includes painting inside the tank.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

950

-

-

... More
Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

600

-

-

... More
Acid proof tile lining work inside vertical blunger Providing and fixing of acid/alkali resistant tile of approved make & colour using acid/alkali resistant mortar bedding & joints filled with acid/alkali resistant cement as per IS :4457,complete as per the direction of Engineer in Charge. Work includes : One coat primer paint 10mm thick mastic Acid/Alkali proof tile 230x115x38 mm with bedding with Silicate material. Work also includes :One coat primer paint 10mm thick mastic Acid/Alkali proof tile 230x115x38 mm with bedding and pointing with Furacin material.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

65

-

-

... More
INSERTS AND JIGS WORK :- Supplying, fabricating, erecting and fixing in position as per drawings, specifications and instruction of the Engineer, MS plate, Rolled steel chanels, Angles, MS inserts, foundation bolts, anchor bolts, nuts, washers, curb angles, channels, pipes, pipe sleeves, rungs etc. for embedding in concrete.Tank inlet and outlet nozzles,drain pipes ,flange,etc.complete.Including the cost of construction materials,labour,consumables,equipments,tools and tackles etc. complete.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.