The Fertilisers And Chemicals Travancore Limited Tender

... More
The FACT has issued a formal invitation for competitive bids for the The Fertilisers And Chemicals Travancore Limited project, for New Piping For Transporting Of Steam From So2 Acid Plant To Petro Plants Steam Header. in Ernakulam, Kerala. The bid opening date for this tender is 14-05-2025 and the last date for bid submission is 04-06-2025. Interested bidders for The Fertilisers And Chemicals Travancore Limited tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.

The Fertilisers And Chemicals Travancore Limited - FACT Tender

Works
Transportation and Logistics
Eprocure
Opening Date14 May 2025
Closing Date4 Jun 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

New Piping For Transporting Of Steam From So2 Acid Plant To Petro Plants Steam Header.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Butt welding - 65NB-100 NB, BW, SCH 80 - MATERIAL: CS A 106 Gr. B, IBR. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting-up, tack welding, cleaning, chipping, preheating, placing of wind shields and /wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds. This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supports. For branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforcement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rates does not cover stress releaving, radiography/DP tests. Payment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached. Payment for non-specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest available size / thickness.

35

-

-

... More
Socket Welding - 40 NB, SW, SCH 80/SCH160 - MATERIAL: CS A 106 Gr. B, IBR. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting-up, tack welding, cleaning, chipping, preheating, placing of wind shields and /wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds. This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supports. For branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforcement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rates does not cover stress relieving, radiography/DP tests. Payment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached. Payment for non-specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest available size / thickness.

15

-

-

... More
Socket Welding - 20 NB, SW, SCH 80/SCH160 - MATERIAL: CS A 106 Gr. B, IBR. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting-up, tack welding, cleaning, chipping, preheating, placing of wind shields and /wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds. This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supports. For branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforcement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rates does not cover stress relieving, radiography/DP tests. Payment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached. Payment for non-specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest available size / thickness.

700

-

-

... More
Socket Welding - 15 NB, SW, SCH 80/SCH160 - MATERIAL: CS A 106 Gr. B, IBR. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinar pipe weld. The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting-up, tack welding, cleaning, chipping, preheating, placing of wind shields and /wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds. This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supports. For branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforcement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rates does not cover stress relieving, radiography/DP tests. Payment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached. Payment for non-specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest available size / thickness.

5

-

-

... More
Butt welding & Socket Welding - 20 NB-50NB, SW/BW, SCH 80 - MATERIAL: SS. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rate for weld joint shall include all costs associated with making a joint such as cleaning, marking out, cutting, profiling, beveling, grinding, aligning, fitting-up, tack welding, cleaning, chipping, preheating, placing of wind shields and /wind or weather protection and final welding together with any special welding requirement (including but not limited to inert gas welding) and final cleaning of welds. This item shall include preparation, final alignment, butt / seal / socket fillet welding of fabricated pipe sections, spool pieces, fitting valves, flanges / orifice flanges etc. and closing length installed and roughly aligned into the respective position and align on respective supports. For branch welding with reinforcement, the rate shall include all costs towards fabrication and welding of reinforcement ring also. Branch welding without reinforcement pad shall be considered as one pipe weld. Rate for branch welding with reinforcement pad shall be taken as 1.5 times the rate for ordinary pipe weld. The rates does not cover stress relieving, radiography/DP tests. Payment shall be made on the basis of number of weld joints completed. Welding of sockolets, weldolets, threadolets and such fittings shall be paid according to the size of the fitting and not according to the size of the piping to which it is attached. Payment for non-specified sizes/thickness will be made propotional to the product of nominal bore and thickness of the pipe based on the nearest available size / thickness.

20

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 300 NB, CS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings. The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

1960

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 250 NB, CS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

30

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 150 NB, CS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

75

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 65-100 NB, CS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

30

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 40 NB, CS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

6

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 20 NB, CS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

285

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 15 NB, CS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

6

-

-

... More
INSTALLATION OF STRAIGHT OR FABRICATED PIPE - 20 NB-50NB, SS PIPE The rate covers all the works required for the proper installation, above ground / in trenches of all types of carbon steel, IBR, Alloy Steel and Stainless steel piping and prefabricated piping sections including, steam/condensate manifolds together with attached fittings. The work shall include transportation from owner’s storage point, handling, rigging, scaffolding, placing and alignment of pipe and fittings into their respective positions and on to their respective supports. Fabrication and erection of trunnion supports, installation of special items like bellows, strainers, traps, etc. are also included in this rate. Hydraulic/pneumatic testing of the piping systems, flushing, draining and drying up shall also be included in the quoted rate. Excluded from this item shall be installation of pipe supports other than trunnions, installation of hangers, making of flanged connections, installation of valves, control valves etc., and any other item specifically exempted and paid for under separate bid items. The contractor shall make the most economical use of straight pipe length in the fabrication and field erection of straight piping runs and closing lengths. The pay quantity shall be the actual centerline length in meters, of straight or fabricated pipe excluding pipe supports, valves, control valves etc. actually installed or required. Payment for the work done will be made only when the piping is properly located and permanently supported in its final position in the field after hydro testing.

30

-

-

... More
INSTALLATION OF FLANGES - 300 NB FLANGE, B16.5 The work under this item covers all operations necessary to complete a flanged joint and shall include transportation from owner’s storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final alignment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. The pay quantity for the items shall be number of pairs of flanges actually completed.

13

-

-

... More
INSTALLATION OF FLANGES - 250 NB FLANGE, B16.5 The work under this item covers all operations necessary to complete a flanged joint and shall include transportation from owner’s storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final alignment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. The pay quantity for the items shall be number of pairs of flanges actually completed.

8

-

-

... More
INSTALLATION OF FLANGES - 150 NB FLANGE, B16.5 The work under this item covers all operations necessary to complete a flanged joint and shall include transportation from owner’s storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final alignment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. The pay quantity for the items shall be number of pairs of flanges actually completed.

48

-

-

... More
INSTALLATION OF FLANGES - 100 NB FLANGE, B16.5 The work under this item covers all operations necessary to complete a flanged joint and shall include transportation from owner’s storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final alignment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. The pay quantity for the items shall be number of pairs of flanges actually completed.

8

-

-

... More
INSTALLATION OF FLANGES - 65, 80 NB FLANGE, B16.5 The work under this item covers all operations necessary to complete a flanged joint and shall include transportation from owner’s storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final alignment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. The pay quantity for the items shall be number of pairs of flanges actually completed.

2

-

-

... More
INSTALLATION OF FLANGES - 40 NB, FLANGE, B16.5 The work under this item covers all operations necessary to complete a flanged joint and shall include transportation from owner’s storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final alignment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. The pay quantity for the items shall be number of pairs of flanges actually completed.

5

-

-

... More
INSTALLATION OF FLANGES - 20 NB, FLANGE, B16.5 The work under this item covers all operations necessary to complete a flanged joint and shall include transportation from owner’s storage point, handling, cleaning and preparation of flange faces and gaskets, placing, aligning, installation of gaskets, bolts/studs, final alignment and tightening of pipe flanges, orifice flanges, blind flanges, expansion joint flanges flanged valves and fittings etc. at all elevations. Installation of orifices, spades, blinds are also included in the quoted rate. The rate is applicable for all ratings and materials. The pay quantity for the items shall be number of pairs of flanges actually completed.

50

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Gate Valve , FLG, CS, 300 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

4

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Check Valve , FLG, CS, 300 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed

1

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Pressure Safety Valve , FLG, CS, 65 NB X 150NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

2

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Motor operated gate valve, 300 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

1

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Globe Valve , FLG, CS, 250 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

2

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - CONTROL VALVE, 250 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

2

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - CONTROL VALVE, 100 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

1

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Motor operated gate valve, 150 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

1

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Gate Valve , FLG, CS, 100 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

1

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - 100 NB, Globe Valve , FLG, CS The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

1

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Gate Valve , SW, CS, 20 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

142

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Gate Valve , SW, CS, 15 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

2

-

-

... More
INSTALLATION OF VALVES, FLOW METERS ETC. - Orifice flange/orifice plate, 300 NB The rate covers all works required to install all on-line items like valves, control valves, safety valves, flowmeters, steam taps etc. in the piping at all elevations. The work shall include transportation from owner’s storage point. handling, rigging, lifting, placing & final alignment of valves in to their Respective positions & orientation to suit operating conditions. The rate is applicable for all materials, types & rating. Welding and making of flanged connections are excluded from this rate and they will be paid as per schedule A & B.2 Also included under this items shall be any work required to ensure the initial satisfactory operation of the valve including minor gland / plud adjustments, lubrication and minor adjustments to the operating mechanism. After erection in place, the valves shall be fully opened and then, after ensuring free movement, shall be closed. The pay quantity shall be the no of items installed.

1

-

-

... More
Radiographic Inspection Radiographic inspection of the weld joints shall be conducted as per the code, specs. Drawings & instruction of the Engineer-in-charge. However, the extent of inspection (%) shall be as per attached document REF:25ES205 The rate quoted shall be inclusive of all operations necessary to fulfill the work of radiography (x-ray / gamma ray) inspection including all tools / tackles, films, chemicals etc. complete. After testing, if any joint is found defective, the same shall be rectified and re-tested free of cost. The pay quantity shall be linear centimeters of weld successfully passed.

22430

-

-

... More
Dye Penetrant / Magnetic Particles Tests DP/MP inspection of the weld joints shall be conducted as per the code, specs. Drawings & instruction of the Engineer-in-charge. However, the extent of inspection (%) shall be as per attached document REF:25ES205 The rate quoted shall be inclusive of all operations necessary to fulfill the work DP/MP tests including all tools / tackles, films, chemicals etc. complete. After testing, if any joint is found defective, the same shall be rectified and re-tested free of cost. The pay quantity shall be linear centimeters of weld successfully passed.

11220

-

-

... More
MISCELLANEOUS WORKS- FABRICATION AND ERECTION OF STRUCTURAL SUPPORTS Supply of material, transportation, cutting, edge preparation drilling, threading, welding and fixing of structural supports at all elevations and chipping and grouting as required and clamping /bottling/fixing of pipeline (including the cost of sand, cement, MS plates, chemical bolts & Structural)

1

-

-

... More
FABRICATION AND INSTALLATION OF PIPE SHOES , CLAMPS, ROD HANGERS ETC. - SHOE SUPPORT Transportation from owner’s store, installation etc. are included. Fabrication of supports. Actual quantity based on approved for construction drawing refer attached support standard for details.

300

-

-

... More
FABRICATION AND INSTALLATION OF PIPE SHOES , CLAMPS, ROD HANGERS ETC. - GUIDE SUPPORT Transportation from owner’s store, installation etc. are included. Fabrication of supports. Actual quantity based on approved for construction drawing refer attached support standard for details.

150

-

-

... More
FABRICATION AND INSTALLATION OF PIPE SHOES , CLAMPS, ROD HANGERS ETC. - AXIAL STOP Transportation from owner’s store, installation etc. are included. Fabrication of supports. Actual quantity based on approved for construction drawing refer attached support standard for details.

20

-

-

... More
PAINTING - 300NB( insulated line:only primer, refer painting spec.) The unit of measurement for Painting of pipeline shall be Running Meters along centerline (includes all on line fittings, valves & instr. tapping up to first isolation). Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made

1900

-

-

... More
PAINTING - 300NB, NUMBER OF MARKINGS The unit of measurement is number of markings (Markings includes 2M long ground color, Color Band(s), Line identification no. & Flow direction arrow). For painting the marking on insulated, SS, Gl and Cl lines, the unit shall be Per Marking. Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made.

20

-

-

... More
PAINTING - 100NB, NUMBER OF MARKINGS The unit of measurement is number of markings (Markings includes 2M long ground color, Color Band(s), Line identification no. & Flow direction arrow). For painting the marking on insulated, SS, Gl and Cl lines, the unit shall be Per Marking. Painting of pipe supports (includes base springs, Hanger springs, shoes & trunnions and excludes pipe bridge structures, platforms, eqpt. support structures & such structures which does not actually support the pipeline) forms part of the pipeline and no separate payment shall be made.

2

-

-

... More
DISMANTLING OF EXISTING PIPING/STRUCTURALS - CS/SS PIPE, SIZE 25NB-250NB Cutting and dismantling of existing pipe lines/ structural including pipe supports, valves fittings online instruments insulation, hydrants, monitors etc. from all elevations as directed by engineer in-charge, transporting materials to the owner stores, yard or other points as indicated, without damage/obstruction to nearby equipment, structures and piping in a safe and sound manner.

50

-

-

... More
DISMANTLING OF AIR BLOWER The rate covers all works required to dismantle and relocate the air blower to safe-location as instructed by FACT engineer in-charge

1

-

-

... More
Erection, testing and commissioning of Local Control Stations (Type-P1) for ON/OFF control of MOV actuators with, IP 65, weather proof, cast Aluminum enclosure as per specifications attached. Cable entry shall be suitable for 1 No.7C x 2.5 sq.mm XLPE insulated armoured copper cable. Canopy shall be provided for the same suitable for outdoor installation. All external hard wares shall be stainless steel.

2

-

-

... More
Testing, Commissioning and Handing over 415 V motors up to and including 18.5kW non-hazardous Motors, as per enclosed specifications/ data sheets/ drawings. The scope shall include mounting of field instruments like speed switches, temperature probes, temperature gauges, etc. if any supplied by the motor manufacturer, megger testing, setting direction of rotation, no load run test, load run test, submission of test reports, cable terminations etc. The charges indicated below shall include Testing, Commissioning and Handing over of the motors along with associated, ammeter, ON/OFF controls and annunciations if any applicable on control panels/stations. The scope shall also include submission of site test certificates. However, transportation & mechanical erection of motors are excluded from the scope of this item. This item is not applicable for single-phase motors in ceiling fans; exhaust fans provided by the bidder. For other requirements refer Annexure.

2

-

-

... More
Erection, Testing, Commissioning and Handing over of 650/1100V, Copper conductor XLPE insulated, extruded PVC sheathed, armoured, PVC outer sheathed cable of size 3Cx4sq.mm. Refer (2.0) of annexure.

325

-

-

... More
Erection, Testing, Commissioning and Handing over of 650/1100V, copper conductor XLPE insulated, PVC sheathed, armoured, PVC outer sheathed cable of size 7C x 2.5 sq.mm. Refer (2.0) of annexure.

100

-

-

... More
Erection of 650/1100V, copper conductor XLPE insulated, PVC Sheathed, armoured, PVC outer sheathed cable of 10C x 1.5 sq.mm. Refer (2.0) of annexure.

550

-

-

... More
Erection of 600V Copper stranded PVC Insulated, extruded PVC sheathed FRLS, Armoured and screened cable of One pair twisted 1.0 sq.mm.. Scope of erection includes transportation of cable drum to site, Unwinding using cable puller, laying without twists, laying through tray/ conduit etc. as per instruction of SIC. Refer clause (2.0) of annexure.

550

-

-

... More
Erection of 300mm wide size Pultruded ladder type GRP cable trays, with 4mm thick, 100mm side runner, 3000 mm long, complete with bends, SS tray couplers and SS hardware viz bolts/nuts/washers, etc. as per drawings enclosed. The scope of work shall be as noted below; The erection scope shall include transportation, handling at site, storage, inspection, safe custody, fixing to structural supports, jointing wherever required, etc. The GRP trays are to be laid over fabricated MS cable racks. The scope shall also include, supply of bolts, nuts, clamps, washers, etc. The bolts, nut, washers shall be of SS.

60

-

-

... More
Cable termination on panels, on motors/Junction boxes, local control stations etc., testing, commissioning and handing over of 600V copper stranded PVC Insulated, extruded PVC sheathed FRLS, Armoured and screened cable of One pair twisted 1.0 sq.mm, conforming to specifications, data sheets, drawings, relevant Indian Standards, code of practices etc. to the entire satisfaction of the owner and of the following sizes. The scope shall include making cable entries on gland plates on equipment, wherever required, fixing lugs, electrical connections, cable glanding (where applicable) and gland earthing. The scope shall also include supply and installation of all required accessories such as, crimping type tinned copper cable lugs, bolts, nuts, washers, ferrules, gland earth clamps, strips etc. (The cable termination rate shall include gland earthing cable termination also.) Supply of cable glands (where required), and gland earthing cables are of free issue by the client.

4

-

-

... More
Cable termination on panels, on motors/Junction boxes, local control stations etc., testing, commissioning and handing over of 650/1100V, Aluminium conductor XLPE insulated, extruded PVC sheathed, armoured, PVC outer sheathed 3C x 4sq.mm. cable, conforming to specifications, data sheets, drawings, relevant Indian Standards, code of practices etc. to the entire satisfaction of the owner and of the following sizes. The scope shall include making cable entries on gland plates on equipment, wherever required, fixing lugs, electrical connections, cable glanding (where applicable) and gland earthing. The scope shall also include supply and installation of all required accessories such as, crimping type tinned copper cable lugs, bolts, nuts, washers, ferrules, gland earth clamps, strips etc. (The cable termination rate shall include gland earthing cable termination also.) Supply of cable glands (where required), and gland earthing cables are of free issue by client.

4

-

-

... More
Cable termination on panels, on motors/Junction boxes, local control stations etc., testing, commissioning and handing over of 650/1100V, Aluminium conductor XLPE insulated, extruded PVC sheathed, armoured, PVC outer sheathed 7C x 2.5sq. mm cable, conforming to specifications, data sheets, drawings, relevant Indian Standards, code of practices etc. to the entire satisfaction of the owner and of the following sizes. The scope shall include making cable entries on gland plates on equipment, wherever required, fixing lugs, electrical connections, cable glanding (where applicable) and gland earthing. The scope shall also include supply and installation of all required accessories such as, crimping type tinned copper cable lugs, bolts, nuts, washers, ferrules, gland earth clamps, strips etc. (The cable termination rate shall include gland earthing cable termination also.) Supply of cable glands (where required), and gland earthing cables are are of free issue by the client.

4

-

-

... More
Cable termination on panels, on motors/Junction boxes, local control stations etc., testing, commissioning and handing over of 650/1100V, copper conductor XLPE insulated, extruded PVC sheathed, armoured, PVC outer sheathed cable of size 10C x 1.5 sq.mm cable, conforming to specifications, data sheets, drawings, relevant Indian Standards, code of practices etc. to the entire satisfaction of the owner and of the following sizes. The scope shall include making cable entries on gland plates on equipment, wherever required, fixing lugs, electrical connections, cable glanding (where applicable) and gland earthing. The scope shall also include supply and installation of all required accessories such as, crimping type tinned copper cable lugs, bolts, nuts, washers, ferrules, gland earth clamps, strips etc. (The cable termination rate shall include gland earthing cable termination also.) Supply of cable glands (where required), and gland earthing cables are of free isssue by the client.

4

-

-

... More
Supply of structural steel items as per drawings enclosed for racks, risers and tray supports, pedestals, DB supports, supports for other equipment, etc. as required. The scope of work shall be as noted below. The supply scope shall include supply of MS steel sections of various sizes as required. Chipping, cement grouting, re-plastering of walls, floors, ceilings, columns etc. of concrete or brick work for supporting the structural items, supply of structural items, bolts, nuts, washers, cement, sand, etc. are also included in the scope of the work. The bolts, nut, washers shall be of hot dipped GI. The rate indicated below shall be applicable also for structural if any issued by PURCHASER. The concrete footing for supports shall be extra under separate item as indicated elsewhere. Payment shall be made on the basis of measurement of dimensions of structural steel items actually installed multiplied by the unit weight applicable for various sections. The quantities indicated being of preliminary nature, contractor shall assess the actual site requirement and supply accordingly.Refer clause (3.0) of annexure.

0.3

-

-

... More
Erection, fixing, epoxy painting and handing over of structural steel items as per drawings enclosed for racks, risers and tray supports, pedestals, DB supports, supports for other equipment, etc. as required. The painting shall be with two coats of epoxy paint over 2 coats of suitable epoxy primer. The scope of work shall be as noted below. The erection scope shall include transportation, handling at site, storage, inspection, safe custody, welding, cutting, making bolt holes, and painting with two coats of epoxy paint over 2 coats of suitable epoxy primer after cleaning with wire brush including supply of paint, etc. Chipping, cement grouting, re-plastering of walls, floors, ceilings, columns etc. of concrete or brick work for supporting the structural items, supply of structural items, bolts, nuts, washers, cement, sand, etc. are also included in the scope of the work. The bolts, nut, washers shall be of hot dipped GI. The rate indicated below shall be applicable also for structural if any issued by PURCHASER. The concrete footing for supports shall be extra under separate item as indicated elsewhere. Payment shall be made on the basis of measurement of dimensions of structural steel items actually installed multiplied by the unit weight applicable for various sections. The quantities indicated being of preliminary nature, contractor shall assess the actual site requirement and supply accordingly.Refer clause (3.0) of annexure.

0.3

-

-

... More
Erection of PVC covered Aluminum conductors of size 70 sq.mm, (Main earth connection)

200

-

-

... More
Erection of PVC covered Aluminum conductors of size 16 sq.mm (For motors LCS, LDB etc.)

300

-

-

... More
Erection of 100 mm wide, 6mm thick Aluminum junction plate of various lengths suitable for connecting required number of earth conductors. The scope includes cutting to required sizes and fixing the junction plate on walls/racks/supports, etc. as well as punching of bolt holes. For general requirements refer Annexure. Also refer Drg. No. 32756-13-GE-00 254.

3

-

-

... More
Erection of GI pipe electrode earth pits. The scope shall include excavation with shuttering if required, dewatering the excavated pit if required, refilling with charcoal & sand, construction of inspection chamber with cover slab, etc.

2

-

-

... More
Installation of 1:2:4 PCC for cable tray supports, PB Station pedestals, etc. The scope shall include supply of all materials like sand, stone, etc. The charges furnished shall cover supply of all materials required. For other requirements refer Annexure.

1

-

-

... More
Chipping of concreted area/ concrete slab, etc for laying cables or pipes and rebuilding the chipped area to original condition. The scope shall include supply of all materials necessary for rebuilding. The charges furnished here shall cover all items applicable including supply of materials.

1

-

-

... More
Labour rates for Helper with tools on 8hour (normal day time) shift basis for attending any work as directed by site in charge/owner during execution of the contract. The charges shall include supervision and supply of consumables such as insulation tapes ferrule etc.

3

-

-

... More
Labour rates for Electrician with tools on 8hour (normal day time) shift basis for attending any work as directed by site in charge/owner during execution of the contract. The charges shall include supervision and supply of consumables such as insulation tapes ferrule etc.

3

-

-

... More
Labour rates for Electrical supervisor with tools on 8hour (normal day time) shift basis for attending any work as directed by site in charge/owner during execution of the contract. The charges shall include supervision and supply of consumables such as insulation tapes ferrule etc.

3

-

-

... More
Labour rates for Electrical supervisor at site on over time basis (after normal shift time of 8 hour)

5

-

-

... More
Labour rates for Electrician at site on over time basis (after normal shift time of 8 hour)

5

-

-

... More
Labour rates for Helper at site on over time basis (after normal shift time of 8 hour)

5

-

-

... More
Erection of pressure gauge with accessories as per data sheet and hook-up drawing attached. Scope of erection includes Necessary welding if required and proper mounting of all accessories. Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

2

-

-

... More
Erection of pressure transmitter as per hook-up drawing attached. Erection scope includes the transportation from supplier stores to erection location, mounting of stanchion and pressure transmitter on stanchion, canopy fixing, piping/tubing, cabling, glanding, termination, calibration, loop check assistance to client etc. Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

3

-

-

... More
Erection of Temperature gauge with thermowell as per hookup drawing. Erection scope includes transportation from supplier stores to erection location proper mounting of gauge with erection material as per hook-up drawing provided. Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

2

-

-

... More
Erection of Thermocouple with thermowell as per hook-up drawing attached. Scope of erection includes transportation from supplier stores to erection location mounting of thermowell and element as per hook-up drawing/ drawing prepared by contractor and approved by PMC, cable laying between thermocouple and transmitter (Special cable), glanding termination, testing etc. Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

3

-

-

... More
Erection of temperature transmitter as per hook-up drawing attached. Erection scope includes the transportation from supplier stores to erection location, mounting of stanchion and temperature transmitter on stanchion, canopy fixing, cabling, glanding, termination, calibration, loop check assistance to client etc. Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

3

-

-

... More
Erection of orifice accessories including piping / tubing to transmitter as per the hook-up drawing attached. (The erection of this item shall be by contractor's piping counterpart and instrument scope is to supervise the erection till first isolation valve and balance piping/ tubing till the transmitter.) Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1

-

-

... More
Erection of Flow transmitter (DP type) as per data sheet and hook-up drawing attached. Scope of erection includes the transportation from supplier stores to erection location, mounting of stanchion and transmitter as per hook-up drawing on a stanchion, cabling, glanding, termination, tubing with necessary fittings to orifice taping as per hook-up drawing, canopy, calibration, loop checking assistance to client etc. Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1

-

-

... More
Erection of control valve PCV-6765A as per data sheet. The mechanical erection shall be under contractors piping scope. Erection scope considered here includes the pneumatic tubing, cabling, glanding, termination, stroke checking/ calibration, assistance in loop checking to client etc. and adjustment of orientation of accessories and re-tubing if required at site. (Including additional material/ fittings if required). Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1

-

-

... More
Erection of control valve PCV-6765B with silencer. The mechanical erection shall be under contractors piping scope. Erection scope considered here includes the pneumatic tubing, cabling, glanding, termination, stroke checking/calibration, assistance in loop checking to client etc and adjustment of orientation of accessories and retubing if required at site (Including additional material/ fittings if required). Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1

-

-

... More
Erection of control valve HCV-0804. The mechanical erection shall be under contractors piping scope. Erection scope considered here includes the pneumatic tubing, cabling, glanding, termination, stroke checking/ calibration, assistance in loop checking to client etc and adjustment of orientation of accessories and retubing if required at site.(Including additional material/ fittings if required). Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1

-

-

... More
Assistance in checking (Loop testing) of MOV control & feedback signals Note:- Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

2

-

-

... More
Erection of cable- One pair twisted 1.0 mm2 copper stranded PVC Insulated Cable FRLS, Armoured and screened. Scope of erection includes transportation of cable drum from supplier store to site, Unwinding using cable puller, laying without twists, laying through tray/ conduit etc as per instruction of SIC. Note: - The cabling envisaged is above ground only. However, where above ground cabling is not practical due to lack of structural support, underground cabling shall be done with conduit buried in 1" GI. Requirements to be assessed at site. No separate charges are applicable for such work (Excavation and refilling) other than cable laying charges. Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1000

-

-

... More
Erection of 100mm wide perforated Aluminium cable tray. Scope of erection includes necessary fabrication works with tray, laying of tray etc as per instruction of SIC. Note: - 1) The cabling envisaged is above ground only. However, where above ground cabling is not practical due to lack of structural support, underground cabling shall be done with conduit buried in 1" GI. Requirements to be assessed at site. No separate charges are applicable for such work (Excavation and refilling) other than cable laying charges. 2) Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

300

-

-

... More
Erection of 50mm wide perforated Aluminium cable tray Scope of erection includes necessary fabrication works with tray, laying of tray etc as per instruction of SIC. Note: - 1) The cabling envisaged is above ground only. However, where above ground cabling is not practical due to lack of structural support, underground cabling shall be done with conduit buried in 1" GI. Requirements to be assessed at site. No separate charges are applicable for such work (Excavation and refilling) other than cable laying charges. 2) Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

110

-

-

... More
OTHER ERECTION MATERIALS - Supply STRUCTURAL STEEL including ISMC 75, ISA 50 X6X 6, 1" GI pipe for conduit application underground, 2" MS pipe (For stanchion fabrication), 10mm thick base plate, 1" conduit GI pipe at a depth of 400 mm for a length of 12 m, including excavation & back filling for routing cables Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1.6

-

-

... More
OTHER ERECTION MATERIALS - Erection STRUCTURAL STEEL including ISMC 75, ISA 50 X6X 6, 1" GI pipe for conduit application underground, 2" MS pipe (For stanchion fabrication), 10mm thick base plate, 1" conduit GI pipe at a depth of 400 mm for a length of 12 m, including excavation & back filling for routing cables Note: - Scope mentioned here is only informative and for payment purpose and quick reference, but not exclusive. For detailed scope, refer to tender document.

1.6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.