The Fertilisers And Chemicals Travancore Limited Tender
... More
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_FACT_851179_1Tender No
3012/2024-2025/E31074Tender Authority
The Fertilisers And Chemicals Travancore Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling & Fixing back of Fluorine Scrubber accessories work includes :- dismantling and fixing back of (a) 6 nos. 3'' nozzle with 8'' flange and 3'' hose & 6'' Ring pipe (b). Round dummy (600mm) with outlet line (10'') and bend of Fluorine Scrubber in 300 TPD NP Plant.
1
-
-
... More
Dismantling and Fixing back of dummies in duct lines at various level up to 200mm of both the 150 & 300 TPD NP Plants (Rate shall be quoted for per piece)
20
-
-
... More
Dismantling and Fixing back of dummies in duct lines at various level from 250mm to 600 mm of both the 150 & 300 TPD NP Plants (Rate shall be quoted for per piece)
30
-
-
... More
Dismantling and Fixing back of dummies in duct lines at various level above 600 mm of both the 150 & 300 TPD NP Plants (Rate shall be quoted for per piece)
40
-
-
... More
Replacement of Product conveyor belts in 300 TPD work includes Materials take from store, Dismantling of damaged belts, carrying idlers ,return idlers ,supporting plates & structural members , seal strips,etc. After fixing of New belts on drum ,fixing back all dismantling items and trail run takes & sway to be adjusted as per the instruction of the Engineer in charge
2
-
-
... More
Replacement of D D conveyor belts in 300 TPD work includes Material transportation from the store, Dismantling of damaged belts, carrying idlers ,return idlers ,supporting plates & structural members , seal strips,etc. After dismantling frame damaged portion shall be patched and idler roller base plate to be replaced. After fixing of New belts ,chain drive to be aligned, fix back all dismantled items and trial run to be taken & sway to be adjusted as per the instruction of the Engineer in charge.
1
-
-
... More
Replacement of Product conveyor belts in 150 TPD work includes Materials take from store, Dismantling of damaged belts, carrying idlers ,return idlers ,supporting plates & structural members , seal strips,etc. After fixing of New belts on drum ,fixing back all dismantling items, head drum and tail drum bearings to be inspected and replaced if required and trail run shall be taken & sway to be adjusted as per the instruction of the Engineer in charge.
1
-
-
... More
Repalcement of vibrating screen nets work includes transportation of the material from store to site and dismantling of all the required obstacles, covers, flaps, old screen nets and fixing the new screen nets , cover, new flaps if required or any structural supports dismantled shall be fixed back , after work completion at both 150 TPD and 300 TPD NP Plants/UC respectively. Old screen nets/scraps shall be transferred to scryapyard as per the instructions of the Engineer-in charge.
24
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%