The Fertilisers And Chemicals Travancore Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

The Fertilisers And Chemicals Travancore Limited - FACT Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date12 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 5,29,860 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of LT motors above 100 HP: Scope of work includes dismantling of LT motors above 100 HP after thorough cleaning .This work includes opening end covers removing bearing with proper pulling tools and leading rotor out of stator.

-

1825

1825

... More
Assembling of LT motors above 100 HP: Scope of work includes assembling of LT motors above 100 HP after thorough painting/varnishing .This work includes fixing end covers and grease cups, inserting of bearing with proper tools and leading rotor inside the stator.

-

1825

1825

... More
Dismantling of HT motors below 1000 HP: Scope of work includes dismantling of HT motors below 1000 HP after thorough cleaning. This work includes opening end covers, removing coolers, removing bearing and coupling with proper pulling tools and leading rotor out of stator.

-

7605

7605

... More
Assembling of HT motors below 1000 HP: Scope of work includes assembling of HT motors below 1000 HP after thorough painting/varnishing. This work includes fixing end covers, grease cups, fixing coolers, inserting bearing and coupling with proper tools and leading rotor inside the stator.

-

7605

7605

... More
Dismantling of HT motors above 1000 HP: Scope of work includes dismantling of HT motors above 1000 HP after thorough cleaning. This work includes opening end covers, removing coolers, disconnecting FCMA starter wires, disconnecting rotor lead wires, removing slip rings and carbon brush assembly, removing bearing and coupling with proper pulling tools and leading rotor out of stator.

-

10140

10140

... More
Assembling of HT motors above 1000 HP: Scope of work includes assembling of HT motors above 1000 HP after thorough painting/varnishing. This work includes fixing end covers, grease cups, fixing coolers, inserting bearing and coupling with proper tools and leading rotor inside the stator, fixing slip ring and brush assembly, connecting rotor lead wires and connecting FCMA starter wires.

-

10140

10140

... More
Preventive maintenance of LT motors: This work consist of thoroughly cleaning motor cooling fins and fan, opening of terminal box, motor health assessment as per preventive maintenance checklist, repairing of any damaged terminations and re-fixing terminal covers.

-

754

754

... More
Preventive maintenance of LT motors feeder modules: This work consist of thoroughly cleaning of LT MCC module & switchgears, module health assessment as per preventive maintenance checklist and repairing/replacing any damaged terminations or switchgears.

-

755

755

... More
Preventive maintenance of HT motors below 1000 HP: This work consist of throughly cleaning motor coolers and fan, Opening of terminal box, motor health assessment as per preventive maintenance checklist, repairing of any damaged terminations and re-fixing terminal covers.

-

811

811

... More
Preventive maintenance of HT motors above 1000 HP: This work consist of throughly cleaning motor coolers and fan, Opening of terminal box, motor health assessment as per preventive maintenance checklist, cleaning of slip ring compartment, replacement of carbon brushes if necessary, repairing of any damaged terminations and re-fixing terminal covers.

-

912

912

... More
Preventive maintenance of FCMA starter panel: This work consists of Panel health assessment as per preventive maintenance checklist and repairing/replacing any damaged terminations or switchgears.

-

811

811

... More
Preventive maintenance of Transformer: This work consist of thoroughly cleaning transformer , Opening of terminal box, transformer health assessment as per preventive maintenance checklist, topping up of transformer oil if necessary ,repairing of any damaged terminations and re-fixing terminal covers.

-

1520

1520

... More
Preventive maintenance of conveyor protection interlocks. This work includes cleaning, lubricating and servicing of pull chord switches, belt sway switches and zero speed switches of Gypsum conveyors and Rock grinding conveyors.

-

506

506

... More
Cleaning of MCC/PCC: Cleaning of dust accumulation in MCC/PCC once in 4 months.

-

2534

2534

... More
Laying, clamping of power cables up to size 4CX70 Sq.mm . The scope of work include laying of cables through cable trays/walls/built-in trenches and clamping the cable at regular intervals, not exceeding 500 mm.

-

40

40

... More
Laying, clamping of control cables above size 4CX70 Sq.mm up to size 4CX400 Sq.mm . The scope of work include laying of cables through cable trays/walls/built-in trenches and clamping the cable at regular intervals, not exceeding 500 mm.

-

92

92

... More
Laying, clamping of earth cables up to size 1CX600 Sq.mm. The scope of work include laying of cables through cable trays/walls/built-in trenches and clamping the cable at regular intervals, not exceeding 500 mm.

-

60

60

... More
Laying, clamping of control cables up to size 44CX2.5 Sq.mm. The scope of work include laying of cables through cable trays/walls/built-in trenches and clamping the cable at regular intervals, not exceeding 500 mm.

-

60

60

... More
Preventive maintenance of LT MCC/PCC sections. This work consists of inspection, repair and cleaning of LT panel single vertical section located in Substations such as SAP plant, PAP plant, ETP, Filter, Grinding, and in Effluent Treatment Plant under the supervision and guidance FACT staff. The scope of work includes opening the panel covers, tightness checking of electrical connections, fixing back the covers and servicing of switchgears, testing of control circuits/relays and other associated electrical works.

-

1520

1520

... More
Maintenance and servicing of MOV in SAP. Scope of work includes inspection of MOV motor terminals, replacing limit switches and cleaning of MOV motors.

-

1014

1014

... More
Installation and servicing of Push button stations and Distribution boards. Scope of work includes wiring of distribution boards, servicing/replacing the damaged push button stations and DBs.

-

811

811

... More
Heating of motor couplings /bearings/fans for insertion and removal.

-

253

253

... More
EOT maintenance: Maintenance of Different EOT 's in Acid area. This work includes trouble shooting control circuits, replacing of trolley festoon cables, trolley inspection and adjustments of limit switches.

-

1825

1825

... More
Trouble shooting / rewiring LT & HT panel control panel wiring. This work includes trouble shooting of PLC, VFD, relays and control circuits.

-

709

709

... More
Cable termination / Jointing. Temporary Jointing of Power and control cables in Acid area.

-

811

811



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.