The Fertilisers And Chemicals Travancore Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 12,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_FACT_610419_1Bid Award Id
ViewTender No
04096/2020-2021/E22831Tender Authority
The Fertilisers And Chemicals Travancore Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling and Transportation of Existing Front End plate of Combustion furnace,Air Duct,Unwanted structural & pipeline and Metal scrap to Scrapyard/earmarked area [For both the streams A & B]:- Required tools & tackles,Chain Pulley blocks and other materials shall be collected from Workshops/Tool crib for the safe dismantling of existing front end plate of the furnace and its accessories.After getting Clearance from Process Dept.,necessary arrangements of scaffolding shall be done with proper scaffolding pipes and clamps as per I S standard and as per the site condition.The exisitng burner unit shall be dismantled properly as per the instruction.After the removal of inside refractory lining of the furnace by Civil Dept.,the Front end plate of the furnace shall be removed by cutting / grinding, after providing temporary supports where ever neccessary. Removal of Refractory lining is NOT IN the scope of the contractor.
Cutting and removal of the exisiting Air Duct, unwanted Pipe line & structural shall also be done by the contractor in the same manner, after getting proper clearance and as per the instruction of Engineer in Charge.The dismantled units shall be transported to scrap yard after cutting the same into number of pieces for easy handling.The site shall be cleaned after the work. All the scrap materials to be removed from the site and shall be transported to scrap yard and deposited in the appropriate area earmarked.
Removal of unwanted structural/pipeline,if any,collection,transportation and loading/unloading of scrap material generated during the work/unused plates/pipe/strucutural etc to scrap yard/area earmarked and final site cleaning for acheiving the successful completion of the subject work of RLNG conversion of Dryer in NP Plant,shall be under the scope of the contractor.
6
-
-
... More
Transportation and Erection of BMS Panel: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of BMS Panel.After getting clearence,BMS Panel shall be transported from Stores Dept. to site,unloaded from trailer,lead to Dryer floor of NP plant and shall be Erected in site with fabricated structural base frame as per the instruction of Engineer-in-charge.Necessary works to be carried out for acheiving correct Level and orientation of the BMS panel shall be in the scope of contractor.
Two nos. BMS Panel assembly to be erected ( One for each stream of NP Plant) and approximate weight of one unit is 2.5 MT.
2
-
-
... More
Transportation and Erection of RLNG Skid Assembly: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of RLNG Skid Assembly.After getting clearence,RLNG Skid Assembly shall be transported from Stores Dept. to site,unloaded from trailer,lead to Skid platform at Dryer floor of NP plant and shall be Erected in the skid platform as per the instruction of Engineer-in-charge.Necessary works to be carried out for acheiving correct Level and orientation of the Skid assembly in the paltform,fixing of skid assembly in the platform by means of welding/bolting shall be in the scope of contractor.
Two nos. RLNG Skid Assembly to be erected ( One for each stream of NP Plant) and approximate weight of one unit is 1 MT having dimension 7.5x1.5 m.
2
-
-
... More
Transportation and Erection of Burner Unit Assembly: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of Burner Unit Assembly.After getting clearence,Burner Unit Assembly shall be transported from Stores Dept. to site,unloaded from trailer,lead to Dryer floor of NP plant.Transported Burner unit shall be bolted to the fabricated Front End Plate of Dryer Combustion Furnace as per M/s.FCS (P) LTD Drawing no.19-4163-02-A01 R4 dated 31.07.2020 and as per the instruction of Engineer-in-charge.The entire unit shall be erected in the shell of Dryer combustion furnace after achieving correct centering,orientation and fit up of shell and burner unit (by tack welding).Necessary edge preparation with single/double bevel and proper grinding for acheiving this shall be done by the contractor on both side (shell end side and front end plate side).On getting clearance,Root weld of the joints and DP test shall be carried out.Defects found, if any, during testing shall be rectified as per the instruction of Engineer-in-charge.After inspection Full welding of the joint and chipping shall be carried out properly.Necessary structural stiffeners and Inspection door shall be welded on the plate and thus complete the work.
Two nos. Burner Unit Assembly to be erected ( One for each stream of NP Plant) and approximate weight of one unit is 1 MT.
2
-
-
... More
Transportation and Erection of Air Duct: Necessary site arrangements,collection and transportation of required tools and tackles,Chain Pulley Blocks,materials etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] for carrying out the Transportation and Erection of Combustion Air Duct.After getting clearence,Air Duct Assembly shall be transported from fabriaction yard to site,unloaded from trailer,lead to Dryer floor of NP plant and shall be Erected as per M/s.FCS (P) LTD Drawing no.19-4163-02-A03 R2 dated 30.06.2020 and as per the instruction of Engineer-in-charge.Hook up joint area at Burner wind box inlet and Blower outlet shall be bevelled before welding.Necessary temporary supports shall be provided for the hook up.For acheiving correct alignment and fit up of the duct necessary spool pieces,miter elbows shall be fabricated by the contractor.After acheiving the correct fit up ( by tack weldng) and on getting clearance,Root weld of the joints and DP test shall be carried out.Defects found, if any, during testing shall be rectified as per the instruction of Engineer-in-charge.After inspection Full welding of the joint and chipping shall be carried out properly.
Two nos. Air Duct unit assembly to be Erected ( One for each stream) and approximate weight of one unit is 01 MT having length 15 m (approx.)
2
-
-
... More
Fabrication and Erection of Structural Support:- Necessary site arrangements,collection and transportation of required tools and tackles,materials,Plate,Structural etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out the fabrication and erection of new structural supports including,Base frame for BMS Panel,Pipe supports,saddle supports,Support for Air duct & vent lines etc. shall be fabricated and erected as per relevant drawings and instruction of Engineer- in -charge to meet site requirement.All welding joints shall be full welded with proper edge preparation.Strengthening of exisiting supports and providing temperory supports necessary for the successful completion of the job shall be in the scope of contractor.
5
-
-
... More
Fabrication and Erection of CS/SS Pipe:-
Necessary site arrangements,collection and transportation of required tools and tackles,materials,Pipe etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out the fabrication and erection of CS/SS Pipe in connection with the subject work.Necessary fabrication and erection of pipe line works includes but not limited to the required modification works in existing RLNG line & RLNG skid assembly,establishing connection between existing RLNG line to Skid inlet,Instrument Air lines to Skid assemby, BMS Panel & Burner unit and Skid to BMS Panel,RLNG Pilot line to Burner unit from skid assembly,providing necessary vent lines,drain lines & spool pieces,modification/re-routing of exisiting pipelines etc. shall be done with necessary fittings and with out any leakage to suit the site condition & as per the instruction of Engineer in charge.Erection of the pipeline shall be carried out without any strain and the rework required if any, for achieving this shall be carried out by the contractor. Pipe size vary from 15NB to 150 NB.
300
-
-
... More
Installation of Valves/Hoses/elbows etc. and assistance for purging/flushing/leakage test. Necessary site arrangements,collection and transportation of required tools and tackles,materials,Valves,Flexible hoses etc. shall be done from Store Dept./Workshop Dept./Mechanical Maint.Dept. [NP] to the site for carrying out installation and hook up of Valves,Flexible Hoses,Elbows etc. required for the sucessful completion of the subject work.Dismantling/installation of Valves/Hoses/elbows etc. as per relevent drawing and as per the instruction of Engineer in charge shall be in the scope of the contractor.Installing Valves/Hoses/elbows etc. shall be done by Bolting (with proper gasket)/welding as per instruction and leak free joints shall be acheived. Necessary dismantling/fixing back of flanges,valves etc. required for purging/flushing/leakage test of the entire RLNG system for the sucessful completion of the project as per the instruction of engineer in charge shall be in the scope of contractor. Size vary from 15 NB to 150 NB
300
-
-