The Fertilisers And Chemicals Travancore Limited Tender
Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.
Costs
EMD
₹ 5,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_FACT_786863_1Bid Award Id
ViewTender No
04028/2023-2024/E28702Tender Authority
The Fertilisers And Chemicals Travancore Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Safety Regulations for Contract works
BOQ Items
Comprehensive Annual Maintenance and Service (AMC) for 80T Electronic weigh bridge at Phase-II.
CAMC includes the following works:-
Comprehensive Annual Maintenance Contract for 80T Electronic Weigh Bridge at Phase II, Ambalamedu. The work includes on call visit/ Breakdown visit/ service visit for routine service / calibration /preventive maintenance of weigh bridge throughout the AMC period as per Annexure II -Special Terms and condition of the work.
1
-
-
Lifting-up& Descending down of the Weighbridge Platform for Inspection works/ Refurbishment/ Painting etc.
The work involves:-
i) Lifting of the entire Weighbridge platform using hydraulic jack/lifting tools to a specified height (upto 1m) as needed for any Mechanical inspections underneath the platform structure. The platform then shall be supported on Blocks/Supports provided by FACT.
ii) Removal of all Load cells (max 8 numbers) from the Weighbridge after proper disconnections at the Load cell junction Box.
iii) After the inspection & subsequent related works by FACT, descending the uplifted Weighbridge platform using hydraulic jack/lifting tools. All load cells to be fixed back along with proper connections at the junction Box and routing through the cable pipes. The platform shall be descended to a level just above all the Load cell corners as required for further final alignments.
iv) Performing calibration check, corner test
v) Checking/ ensuring normal functionality .
After completion, the weigh bridge should be handed –over to FACT for stamping.
5
-
-
Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of 60T Electronic Weighbridge at Q10 area, Willingdon Island. Contractor`s scope of work:
(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.
(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.
(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.
(iv) All necessary tools & tackles required for the work.
(v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Q10 area, Willingdon Island (60T).
(vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.
FACT’s scope of work:
(i). The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
1
-
-
Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of 80T Electronic Weighbridge at Phase-I Gypsum yard area. Contractor`s scope of work: (i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.
(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.
(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.
(iv) All necessary tools & tackles required for the work.
(v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Phase-I Gypsum Yard area, Ambalamedu (80T).
(vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.
FACT’s scope of work:
(i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
1
-
-
Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the 80T weigh bridge at phase-II.
Contractor`s scope of work:
(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.
(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.
(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.
(iv) All necessary tools & tackles required for the work.
(v) The contractor shall complete the annual re-verification and stamping works before the due dates of Stamping for Electronic Weighbridge at Phase-II area, Ambalamedu (80T).
(vi) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay.
FACT’s scope of work:
(i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
1
-
-
Liaison and coordination with Legal Metrology Department for any stamping & re-verification required in addition to the regular Annual re-verification and stamping for any of the following weighbridges:
(i) Electronic Weighbridge (60T) at Q10 area, Willingdon Island.
(ii) Electronic Weighbridge(80T)at Phase-IGypsum Yard area, Ambalamedu.
(iii) Electronic Weighbridge(80T)at Phase-II area, Ambalamedu.
Contractor`s scope of work:
(i) The scope of work includes minor preparatory works, Liaison and coordination with Legal Metrology Department for annual re-verification and stamping of the specified weighbridges.
(ii) All the transportation arrangements & related costs incurred shall be borne by the contractor.
(iii) The contractor shall meet all the incidental expenses in connection with verification & stamping.
(iv) All necessary tools & tackles required for the work.
(v) After the completion of the work, the Contractor shall collect the verification/stamping certificates from the Legal Metrology Department and hand over to FACT, without delay. FACT’s scope of work:
(i) The Stamping fees for the Annual re-verification and stamping of the specified Electronic Weighbridges shall be in the scope of FACT.
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements