Telecommunications Consultants India Limited Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Telecommunications Consultants India Limited - TCIL Tender

Goods
Electrical and Electronics
Eprocure
Opening Date22 Aug 2024
Closing Date19 Sep 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Selection Of Consortium Partner For Supply, Installation, O And M Of Smart Meter,etc. For Ksebl

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Selection of Consortium partner for supply, installation and OM of smart meter, HES, cellular network for KSEBL
Selection of consortium partner for supply, installation, O and M of smart meter, HES, cellular system for KSEBL
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
3 phase whole current Smart Meter (with Net-Metering) LT Meter: 10 / 20 – 100 A with polycarbonate/SMC weather proof outdoor type meter cover box. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.

2300

-

-

... More
3 phase LT-CT operated Smart Meter (with Net-Metering) -/5A, Accuracy class 0.5S, LT Meter with CTs, control cables etc. (Exl. Meter Box)

800

-

-

... More
3 phase CT/PT operated Smart Meter (with Net-Metering) – HT Meter --/5A/1A of Accuracy class 0.2S with control cables (Exl. Meter Box and DI)

7630

-

-

... More
3 phase LT-CT operated Smart Meter – DT Meter(with Net-Metering) -/5A, Accuracy class 0.5S, CTs, control cables etc. (Exl.Meter Box & DI)

91760

-

-

... More
3 phase CT/PT operated Smart Meter – Feeder Meter -/5A /1A of Accuracy class 0.5S, control cables etc. (Exl. Meter Box & DI)

3000

-

-

... More
3 phase CT/PT operated Smart Meter – Boundary Meter with net metering -/5A /1A of Accuracy class 0.5S with Net metering, control cables etc. (Exl. Meter Box & DI)

1200

-

-

... More
SMC/ Deep drawn MS sheet weather proof Outdoor type meter cover box for 3 phase LT-CT operated Smart Meter (with Net-Metering and prepaid functionality) -/5A, Accuracy class 0.5S, LT Meter with CT. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.

800

-

-

... More
SMC/ Deep drawn MS sheet weather proof Outdoor type meter cover box -3 phase LT-CT operated Smart Meter – DT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.

91760

-

-

... More
Deep drawn MS sheet weather proof Outdoor type meter cover box-3 phase CT/PT operated Smart Meter (with Net-Metering and prepaid functionality) – HT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.

1200

-

-

... More
Deep drawn MS sheet weather proof Outdoor type meter cover box-3 phase CT/PT operated Smart Meter (with Net-Metering and prepaid functionality) – HT Meter. Inclusion Holding clamps /channels for mounting and other allied accessories like nut, bolt, washer etc for installation of meter cover box.

7630

-

-

... More
Communication Network Infrastructure & Connectivity for the project area, including Supply of all hardware equipment (SIM cards/DCU/Gateways etc.) and integrated software components/ associated accessories required for the successful establishment and operation of communication network inclusive of 7 years OEM warranty (from date of commissioning).

-

-

-

... More
Planning, Supply, Setup, testing and commissioning of RF Communication Network Infrastructure & Connectivity consisting of DCU/Gateways etc. (inclusive of 7 years OEM warranty) as required for the successful establishment of connectivity for all Smart Meters feasible as per design proposed by bidder, terminated at the AMI-DC collocated at KSEBL DC, and also at the AMI-DC at KSEBL DRC.

1

-

-

... More
Head End System software (HES),NMS and other softwares

-

-

-

... More
Supply, installation, integration, testing and commissioning of HES, NMS and other related software applications, including perpetual licenses for Operating Systems and Database and Applications with 1 year warranty, for 300,000 users/ consumers/ smart meters at KSEBL-DC

1

-

-

... More
Supply, installation, integration, testing and commissioning of HES ,NMS, other related software applications, including perpetual licenses for Operating Systems and Database and Applications with 1 year warranty, for 300,000 users/ consumers/ smart meters at KSEBL-DRC

1

-

-

... More
Configuration, customization, business process/ systems integration with MDMS and any other Utility Applications, Ticketing tool, Consumer Portal, development of Analytics Reports, SLA dashboard etc. as necessary for successful operation of this project

1

-

-

... More
Design, Development & deployment of allied IT applications as required by KSEBL for performance monitoring & execution of entire project. 1.       Meter & SIM inventory Management 2.       Smart Meter Installation & Consumer Indexing 3.       SLA monitoring tool

1

-

-

... More
Connectivity Charges(GPRS/LTE/4G/5G/NBIoT) Connectivity Charges (actuals, on pro-rata basis) for the project period of 72 months

291690

-

-

... More
Interim FMS (for the period from commissioning for a set of meters to Enterprise wide go live ) for the maximum of 18 months

291690

-

-

... More
Operation and Maintenance charges *

-

-

-

... More
Facility Management Services (FMS)

-

-

-

... More
Smart Meter, HES & Communication Network Operations & Reporting at NOMC including Manpower

-

-

-

... More
– Year 1

1

-

-

... More
– Year 2

1

-

-

... More
– Year 3

1

-

-

... More
–Year 4

1

-

-

... More
–Year 5

1

-

-

... More
–Year 6

1

-

-

... More
Field Operations - Smart Metering & communication infrastructure Technical Support & Network Infrastructure Operation & Maintenance, including Manpower.

-

-

-

... More
– Year 1

1

-

-

... More
– Year 2

1

-

-

... More
– Year 3

1

-

-

... More
–Year 4

1

-

-

... More
–Year 5

1

-

-

... More
–Year 6

1

-

-

... More
Annual Technical Support (ATS) for a period of 6 years after completion of warranty of one year

-

-

-

... More
from OEM – for HES

-

-

-

... More
– Year 1

1

-

-

... More
– Year 2

1

-

-

... More
– Year 3

1

-

-

... More
–Year 4

1

-

-

... More
–Year 5

1

-

-

... More
–Year 6

1

-

-

... More
for all other related applications software.

-

-

-

... More
– Year 1

1

-

-

... More
– Year 2

1

-

-

... More
– Year 3

1

-

-

... More
–Year 4

1

-

-

... More
–Year 5

1

-

-

... More
–Year 6

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.