Technopark Tender

Everything can be found here in your one-stop destination for all types of Kerala tenders online - be it Kerala PWD tenders or an LSGD Kerala tender. Search from across the categories, cities, and authorities while having the option to download tender-related documents. Also, get to know how to register as a bidder and how to bid online for Kerala tenders.

Technopark Tender

Works
Eprocure
Opening Date16 Nov 2024
Closing Date26 Nov 2024
Tender Amount₹ 10,80,49,604 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
FOR THIRD YEAR

12

-

-

... More
OPERATION OF HVAC SYSTEMS IN BHAVANI AC PLANT FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
FOR FIRST YEAR

12

-

-

... More
FOR SECOND YEAR

12

-

-

... More
FOR THIRD YEAR

12

-

-

... More
OPERATION OF HVAC SYSTEMS IN PARK CENTRE AC PLANT FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
FOR FIRST YEAR

12

-

-

... More
FOR SECOND YEAR

12

-

-

... More
FOR THIRD YEAR

12

-

-

... More
OPERATION OF FIRE ALARM AND FIRE PROTECTION SYSTEMS IN PHASE I CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
FOR FIRST YEAR

12

-

-

... More
FOR SECOND YEAR

12

-

-

... More
FOR THIRD YEAR

12

-

-

... More
OPERATION OF FIRE ALARM AND FIRE PROTECTION SYSTEMS IN PHASE III CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
FOR FIRST YEAR

12

-

-

... More
FOR SECOND YEAR

12

-

-

... More
FOR THIRD YEAR

12

-

-

... More
OPERATION OF FIRE ALARM AND FIRE PROTECTION SYSTEMS IN KOLLAM CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
FOR FIRST YEAR

12

-

-

... More
FOR FIRST YEAR

12

-

-

... More
FOR FIRST YEAR

12

-

-

... More
COMPREHENSIVE MAINTENANCE OF HVAC INSTALLATIONS IN THEJASWINI BUILDING FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
Chiller No:1, 350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C

36

-

-

... More
Chiller No:2, 350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C

36

-

-

... More
Chiller No:3, 350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C

36

-

-

... More
Chiller No:4, 350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C

36

-

-

... More
Chiller No:5, 350TR single compressor screw chiller– Make: YORK (Johnson Controls) Model no: YRWAWAT 3550C

36

-

-

... More
Chiller No:6, 355TR single compressor screw chiller- Make: TRANE Model no: RTHDD3F2F3

36

-

-

... More
Primary Pump No: 1, (11KW,1456rpm) (Bell & Gosset)

36

-

-

... More
Primary Pump No: 2, (11KW,1456rpm) (Bell & Gosset)

36

-

-

... More
Primary Pumps No: 3, (11KW,1456rpm) (Bell & Gosset)

36

-

-

... More
Primary Pump No: 4, (11KW,1456rpm) (Bell & Gosset)

36

-

-

... More
Primary Pump No: 5, (11KW,1456rpm) (Bell & Gosset)

36

-

-

... More
Primary Pumps No: 6, (11KW,1456rpm) (Bell & Gosset)

36

-

-

... More
Secondary pump No: 1, [15 KW, 1457 rpm] (Bell & Gosset)

36

-

-

... More
Secondary pump No: 2, [15 KW, 1457 rpm] (Bell & Gosset)

36

-

-

... More
Secondary pump No: 3, [15 KW, 1457 rpm] (Bell & Gosset)

36

-

-

... More
Secondary pump No: 4, [15 KW, 1457 rpm] (Bell & Gosset)

36

-

-

... More
Secondary pump No: 5, [15 KW, 1457 rpm] (Bell & Gosset)

36

-

-

... More
Secondary pump No: 6, [15 KW, 1457 rpm] (Bell & Gosset)

36

-

-

... More
Condenser Pump No: 1, [30KW, 1472rpm] (Bell & Gosset)

36

-

-

... More
Condenser Pump No: 2, [30KW, 1472rpm] (Bell & Gosset)

36

-

-

... More
Condenser Pump No: 3, [30KW, 1472rpm] (Bell & Gosset)

36

-

-

... More
Condenser Pump No: 4, [30KW, 1472rpm] (Bell & Gosset)

36

-

-

... More
Condenser Pump No: 5, [30KW, 1472rpm] (Bell & Gosset)

36

-

-

... More
Condenser Pump No: 6, [30KW, 1472rpm] (Bell & Gosset)

36

-

-

... More
Cooling Tower No: 1, 350 TR Counter Flow Cooling Towers (Advance Make)

36

-

-

... More
Cooling Tower No: 2, 350 TR Counter Flow Cooling Towers (Advance Make)

36

-

-

... More
Cooling Tower No: 3, 350 TR Counter Flow Cooling Towers (Advance Make)

36

-

-

... More
Cooling Tower No: 4, 350 TR Counter Flow Cooling Towers (Advance Make)

36

-

-

... More
Cooling Tower No: 5, 350 TR Counter Flow Cooling Towers (Advance Make)

36

-

-

... More
Cooling Tower No: 6, 350 TR Counter Flow Cooling Towers (Advance Make)

36

-

-

... More
Electrical Panels for the Chillers, Pumps, Cooling Towers including VFD Panels.

36

-

-

... More
Restaurant AHU'S (39 TR - 4 Nos)

36

-

-

... More
AHU'S in 5th Floor Thejaswini Building (62 TR - 2 Nos)

36

-

-

... More
AHU'S in 2nd Floor Thejaswini Building (60 TR - 2 Nos) with VFD Panel

36

-

-

... More
Split AC units in 2nd Floor Thejaswini Building (1 TR - 1 Nos)

36

-

-

... More
Split AC units in 2nd Floor Thejaswini Building (1.5 TR - 4 Nos)

36

-

-

... More
Split AC units in 2nd Floor Thejaswini Building (2 TR - 4 Nos)

36

-

-

... More
Split AC units in 2nd Floor Thejaswini Building (2.5 TR - 2 Nos)

36

-

-

... More
Inverter Cassette AC 2nd Floor Thejaswini Building (3 TR - 5 Nos)

36

-

-

... More
Inverter Cassette AC 2nd Floor Thejaswini Building (4 TR - 4 Nos)

36

-

-

... More
Chilled Water Cassette AC in SBC Modules, Thejaswini Building (3TR - 17 Nos)

36

-

-

... More
Chilled Water Cassette AC in SBC Modules, Thejaswini Building (2TR - 19 Nos)

36

-

-

... More
Substation, Basment (-4) AHU (34 TR - 1 Nos)

36

-

-

... More
Substation, Basment (-1) AHU (62 TR - 1 Nos)

36

-

-

... More
Basement (-4) AHU'S (52 TR - 2 Nos)

36

-

-

... More
Basement (-2) TFA (17 TR - 2 Nos)

36

-

-

... More
Rooftop AHU'S (52 TR - 2 Nos)

36

-

-

... More
Rooftop TFA (45 TR - 2 Nos)

36

-

-

... More
Staircase Pressurization Fan 7000 CFM (2 Nos)

36

-

-

... More
Kitchen Exhaust With Hood (7000 CFM - 1 Nos)

36

-

-

... More
Kitchen Exhaust With Hood (5400 CMH - 1 Nos)

36

-

-

... More
Kitchen Exhaust With Hood (6000 CFM - 2 Nos)

36

-

-

... More
Fresh Air Fan 4000 CFM (1 Nos)

36

-

-

... More
Fresh Air Fan 2000 CMH (1 Nos)

36

-

-

... More
Fresh Air Fan 4800 CFM (2 Nos)

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF BHAVANI HVAC PLANT FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
Chiller No: 1, 350TR Three compressor screw chiller– Make: Dunham-Bush Model no: VWCFX39V1T1C

36

-

-

... More
Chiller No:2, 350TR single compressor screw chiller– Make: TRANE Model no: RTHDD3F2F3

36

-

-

... More
Condenser Pump No: 1, 30KW - 4 Nos Make: Kirloskar Note: The contractor has to quote the monthly rate for 2 Pumps.

6

-

-

... More
Primary Pump No: 1, 30KW - 3 Nos Make: Kirloskar Note: The contractor has to quote the monthly rate for 2 Pumps.

6

-

-

... More
Secondary Pump No: 1, 30KW - 3 Nos Make: Kirloskar Note: The contractor has to quote the monthly rate for 2 Pumps.

6

-

-

... More
Cooling Tower No: 1, 350 TR Counter Flow Cooling Tower Make: Advance

36

-

-

... More
Cooling Tower No: 1, 350 TR Counter Flow Cooling Tower Make: Advance

36

-

-

... More
Air Handling Units ,Make: Boopathy, Capacity: 7.5TR (1 Nos)

36

-

-

... More
Air Handling Units, Make: Boopathy, Capacity: 22TR (17 Nos)

36

-

-

... More
Air Handling Units, Make: Boopathy, Capacity: 20TR (14 Nos)

36

-

-

... More
Air Handling Units, Make: Boopathy, Capacity: 18 TR (30 Nos)

36

-

-

... More
Air Handling Units, Make: Boopathy, Capacity: 15TR (2 Nos)

36

-

-

... More
Air Handling Units, Make: Boopathy, Capacity: 13TR (18 Nos)

36

-

-

... More
Air Handling Units, Make: Boopathy, Capacity: 12TR (2 Nos)

36

-

-

... More
3000 CFM Cabinet Type Exhaust - 3 Nos

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF PARK CENTRE HVAC PLANT FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
Chiller No: 1, 150TR single compressor screw chillers– Make: Dunham Bush Model no: WCFX20SRVAUEAR5BR - 1 Nos

36

-

-

... More
Chiller No: 2, 40TR reciprocating chiller- Make: Voltas Model no: 05040

36

-

-

... More
Chiller No: 3, 40TR reciprocating chiller- Make: Voltas Model no: 05040

36

-

-

... More
Chiller No: 4, 60TR reciprocating chiller- Make: Voltas Model no: 05086

36

-

-

... More
Chilled water pump No: 1, 20HP Make: Xylem

36

-

-

... More
Chilled water pump No: 2, 20HP Make: Xylem

36

-

-

... More
Counter Flow Cooling Tower No: 1, Capacity: 150TR Make: Advance

36

-

-

... More
Counter Flow Cooling Tower No: 2, Capacity: 150TR Make: Advance

36

-

-

... More
Condenser Pump No: 1, 15HP Make: Xylem

36

-

-

... More
Condenser Pump No: 2, 15HP Make: Xylem

36

-

-

... More
Chilled Water FCU/High Wall Units Capacity: 2TR (38 Nos)

36

-

-

... More
Air Handling Unit, Capacity: 15TR - 1 Nos Make : Voltas

36

-

-

... More
Air Handling Unit, Capacity: 5TR - 2 Nos Make : Voltas

36

-

-

... More
Air Handling Unit, Capacity: 30TR - 1 Nos Make : Voltas

36

-

-

... More
3000 CFM Exhaust - 3 Nos

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF VRF SYSTEMS IN PHASE I CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of VRF systems in Park Centre Building Phase I Campus, Refer Tender Document for the list of equipments. TOTAL CAPACITY : 42 HP , MAKE : LG

36

-

-

... More
CAMC of VRF systems in Gayathri Building, Refer Tender Document for the list of equipments. TOTAL CAPACITY : 132 HP, MAKE : DAIKIN

36

-

-

... More
CAMC of VRF systems in ground floor Periyar Building, Refer Tender Document for the list of equipments. TOTAL CAPACITY : 16 HP, MAKE : LG

36

-

-

... More
CAMC of VRF systems in first floor Periyar Building, Refer Tender Document for the list of equipments. TOTAL CAPACITY : 18 HP, MAKE : LG

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF DX UNITS IN PHASE I CAMPUS FOR FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of DX units in Park Centre, Guest House, Club House, and other locations mentioned in the special conditions of contract, Refer tender document for list of equipments.

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF HVAC SYSTEMS IN TECHNOPARK PHASE IV CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of VRF systems in IT building and Foodcourt building including indoor units and Tenant Billing Software, Refer Tender Document for the list of equipments. TOTAL CAPACITY: 712 HP, MAKE: TOSHIBA

36

-

-

... More
CAMC of Ventilation Units in Kabani IT Building, Refer Tender Document for the list of equipments, Refer Tender Document for the list of equipments.

36

-

-

... More
CAMC of Split AC Units in 110 KV Substation, Refer Tender Document for list of euipments, Refer Tender Document for the list of equipments.

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF FIRE ALARM AND FIRE PROTECTION SYSTEMS IN TECHNOPARK PHASE IV CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Fire Alarm and Fire Protection Systems in Phase IV Campus, Refer Tender Document for list of euipments.

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF FIRE ALARM AND FIRE PROTECTION SYSTEMS IN TECHNOPARK PHASE I CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Fire Alarm and Fire Protection Systems in Phase I Campus, Refer Tender Document for list of euipments.

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF FIRE ALARM AND FIRE PROTECTION SYSTEMS IN TECHNOPARK PHASE III CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Fire Alarm and Fire Protection Systems in Phase III Campus, Refer Tender Document for list of euipments.

36

-

-

... More
COMPREHENSIVE ANNUAL MAINTENANCE OF FIRE ALARM AND FIRE PROTECTION SYSTEMS IN TECHNOPARK KOLLAM CAMPUS FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Fire Alarm and Fire Protection Systems in Kollam Campus, Refer Tender Document for list of euipments.

36

-

-

... More
CAMC OF BMS SYSTEM IN TECHNOPARK PHASE III IT BUILDING FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of BMS System in Technopark Phase III IT Building as per terms and conditions of the tender document.

36

-

-

... More
Rectification of existing complaints in BMS systems in Technopark Phase III IT Building as per the terms and condition of the contract.

1

-

-

... More
CAMC OF BMS SYSTEM IN TECHNOPARK PHASE IV (Kabani Building) IT BUILDING FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of BMS System in Technopark Phase IV (Kabani ) IT Building as per terms and conditions of the tender document.

36

-

-

... More
Rectification of existing complaints in BMS systems in Phase IV (Kabani ) IT Building as per the terms and condition of the contract.

1

-

-

... More
CAMC OF BMS SYSTEM IN TECHNOPARK PHASE V IT BUILDING (Kollam) FOR A PERIOD OF THREE YEARS (01.12.2024 TO 30.11.2027) AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of BMS System in Technopark Phase V IT Building (Kollam) as per terms and conditions of the tender document.

36

-

-

... More
Rectification of existing complaints in BMS systems in Technopark Phase V IT Building (Kollam) as per the terms and condition of the contract.

1

-

-

... More
CAMC OF VRF SYSTEMS INCLUDING BILLING SOFTWARE IN BHAVANI BUILDING ROOFTOP SPACE AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Newly Commissioned VRF System in Bhavani Building Rooftop Space including Tenant Billing Software

9

-

-

... More
CAMC OF VRF SYSTEMS INCLUDING BILLING SOFTWARE IN NILA BUILDING ROOFTOP SPACE AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Newly Commissioned VRF System in Nila Building Rooftop Space including Tenant Billing Software

9

-

-

... More
CAMC OF FIRE ALARM SYSTEM IN BHAVANI BUILDING ROOFTOP SPACE AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Newly Installed Fire Alarm System in Bhavani Building Rooftop Space.

9

-

-

... More
CAMC OF FIRE ALARM SYSTEM IN NILA BUILDING ROOFTOP SPACE AS PER THE TERMS AND CONDITIONS OF THE TENDER DOCUMENT

-

-

-

... More
CAMC of Newly Installed Fire Alarm System in Nila Building Rooftop Space.

9

-

-

... More
CAMC OF AHU MONITORING SYSTEM IN BHAVANI BUILDING TECHNOPARK PHASE I CAMPUS AS PER TERMS AND CONDITIONS OF TENDER DOCUMENT

-

-

-

... More
The CAMC shall cover the maintenance of 85 AHU Monitoring Units installed at the Bhavani Building, Technopark Phase I Campus, Trivandrum. The contractor is responsible for ensuring uninterrupted and accurate monitoring of tenant-specific energy usage to facilitate precise billing. This includes routine inspections, preventive maintenance, and timely repairs to maintain the system's optimal functionality and reliability. The contract scope encompasses all RTUs, sensors, and related components installed in the building. The quoted price must also include cloud service charges and GPRS charges for the entire contract period. The contractor shall provide detailed usage reports as and when required and ensure that all RTUs and sensors remain in good working condition throughout the term of the agreement. Additionally, an alert mechanism must be implemented to promptly identify and address instances where sensors fail to respond to the cloud, ensuring the system operates at peak performance at all times.

12

-

-

... More
The scope of work involves addressing and resolving identified complaints in the HVAC systems at Technopark Phase IV Campus. This includes conducting a detailed inspection and diagnosis to determine the root causes, followed by implementing necessary repairs, replacements, or adjustments to ensure optimal functionality. The rectification process must guarantee that all HVAC components, including air handling units, ductwork, sensors, and control systems, operate efficiently. Preventive measures, such as improving insulation, sealing leaks, or recalibrating controls, should also be implemented to ensure long-term reliability. All work must comply with industry standards, with minimal disruption to campus operations, and detailed documentation of the completed tasks and preventive actions must be submitted upon completion.

-

-

-

... More
The scope of work involves the rectification of the 20 HP fan motor and fan IPDU in the VRF outdoor unit (1 set). The contractor shall inspect, diagnose, and repair or replace the fan motor and IPDU as necessary to restore the unit to optimal working condition. This includes ensuring proper alignment, functionality, and performance of both components to support efficient operation of the VRF system. All work must comply with industry standards, ensuring the durability and reliability of the repaired unit.

1

-

-

... More
This work involves the rectification of the fan IPDU in the 8TR indoor unit (1 unit). The contractor shall inspect and troubleshoot the fan IPDU to identify any faults, followed by necessary repairs or replacements to restore proper functionality. The rectification process must ensure that the fan operates smoothly, efficiently, and in alignment with system requirements. All work should adhere to industry standards, ensuring reliable and sustained performance of the indoor unit.

1

-

-

... More
The work involves the rectification of the duct diffuser, including necessary adjustments and repairs to ensure proper function. It also includes the connection of the duct system to the appropriate components, ensuring all connections are secure and airtight. Additionally, the work requires sealing any leakage in the ducts to prevent loss of airflow and maintain the efficiency of the exhaust system at the Kabani Foodcourt. This work is intended to enhance the overall performance of the exhaust system by addressing issues related to diffuser functionality, faulty connections, and air leakage.

1

-

-

... More
The work involves the supply and installation of GI wire mesh for two exhaust units located on the basement floor. The exact dimensions of the mesh will be determined after a site visit to assess the specific requirements. The mesh to be installed must be durable, corrosion-resistant, and designed to facilitate optimal airflow while preventing debris or foreign objects from entering the exhaust units. The contractor is responsible for ensuring proper installation, including accurate alignment, to maintain the efficiency and functionality of the exhaust system.

1

-

-

... More
The scope of work involves the rectification of existing sweating issues in the Kabani Food Court by supplying and installing 13 mm nitrile rubber insulation. The insulation shall be applied to all areas where sweating has been identified, ensuring comprehensive coverage to eliminate moisture-related problems. The contractor must ensure proper installation practices to achieve optimal thermal insulation and long-term durability. This work aims to improve system efficiency and maintain a condensation-free environment within the food court. All materials and methods used should comply with industry standards for insulation and moisture control.

1

-

-

... More
The work involves the rectification of three exhaust units as follows: Food Court Common Exhaust - Kruger 2.9 hp: Rectification includes addressing issues with the relay in the electrical panel and resolving vibration problems in the exhaust motor. Pump Room Exhaust - Kruger 4.9 hp: The work includes rewinding the motor and replacing the bearings. These rectifications need to be done to restore the proper functioning and performance of the exhaust systems.

1

-

-

... More
The work involves the inspection, rectification, and recommissioning of four lift pressurization fans at the Kabani IT Building. This includes a thorough inspection of the fans to identify any issues, followed by the necessary rectifications to address any faults or inefficiencies. Once the rectification work is completed, the fans have to be recommissioned to ensure proper operation and compliance with safety and performance standards.

1

-

-

... More
RECTIFICATION OF FOLLOWING COMPLAINTS IN THE FAS AND FPS SYSTEMS IN TECHNOPARK PHASE IV CAMPUS Note: (The bidder has to visit the site and assess the existing complaints before quoting the tender)

-

-

-

... More
The work involves the rectification and recommissioning of the Jockey Pump. This includes identifying and addressing any issues affecting the pump's performance, followed by necessary repairs or adjustments in motor/pump/panel. Once the rectification work is completed, the Jockey Pump has to be recommissioned to ensure it operates efficiently and meets required performance standards.

1

-

-

... More
The work involves the rectification and recommissioning of the Diesel Engine Pump and Diesel Engine Pump Panel Automation. This includes identifying and addressing any issues with the pump and its automation panel, followed by necessary repairs or adjustments. Once the rectification work is completed, the Diesel Engine Pump and its Panel Automation have to be recommissioned to ensure proper functionality and optimal performance in compliance with operational standards.

1

-

-

... More
The work involves the rectification of existing faults in the main building fire alarm control system, addressing over 300 identified faults. This includes a thorough inspection and repair of the system to identify and resolve issues affecting its functionality. The work aims to restore the system to full operational status, ensuring all components are working correctly and in compliance with safety standards

1

-

-

... More
The work involves the rectification of existing complaints, testing, and recommissioning of the Cafeteria building fire alarm control panel. This includes addressing any reported issues with the system, performing comprehensive testing to ensure all components are functioning properly, and making any necessary adjustments or repairs. Once the rectification and testing are completed, the fire alarm control panel has to be recommissioned to ensure optimal performance and compliance with safety standards.

1

-

-

... More
The work involves the integration of the Voice Evacuation System with the Main Fire Panel, including the supply and installation of all necessary cables. This integration ensures that the Voice Evacuation System operates in conjunction with the Main Fire Panel for coordinated emergency alerts and evacuations. The work includes proper connection, testing, and configuration of the system to ensure seamless communication during fire emergencies, complying with safety standards and operational requirements.

1

-

-

... More
The work involves the rectification of existing complaints and the recommissioning of the Fire Hydrant Control Panel. This includes identifying and addressing any reported issues affecting the functionality of the control panel, followed by necessary repairs or adjustments. Once the rectification work is completed, the Fire Hydrant Control Panel has to be recommissioned to ensure proper operation and compliance with safety standards.

1

-

-

... More
The work involves the rectification of existing complaints and the recommissioning of the Talk Back System. This includes identifying and addressing any reported issues with the system, performing necessary repairs or adjustments, and ensuring all components are functioning properly. Once the rectification work is completed, the Talk Back System has to be recommissioned to ensure optimal performance and effective communication during operational use.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.